Category:Accident Sequence Precursor (ASP) Analysis
MONTHYEARML22125A0482022-05-17017 May 2022 Final ASP Analysis - Davis-Besse Nuclear Power Station, Reactor Trip Due to Failed UPS and Sfrc System Actuations (LER 346-2021-003) - Precursor ML20168A4552020-06-16016 June 2020 Final ASP Analysis - Davis-Besse (LER 346-77-110) ML20168A4542020-06-16016 June 2020 Final ASP Analysis - Davis-Besse (LER 346-77-098) ML20168A4532020-06-16016 June 2020 Final ASP Analysis - Davis-Besse (LER 346-77-016) ML20147A5332020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-88-007) ML20147A5322020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-87-011) ML20147A5312020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-85-013) ML20147A5302020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-85-002) ML20147A5292020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-84-013) ML20147A5282020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-84-003) ML20147A5272020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-83-038) ML20147A5262020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-81-037) ML20147A5252020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-80-029) ML20112F5242020-05-12012 May 2020 Final ASP Analysis - Davis-Besse (LER 346-98-006) ML20112F4882020-05-12012 May 2020 Final ASP Analysis - Davis-Besse (LER 346-02-002) 2022-05-17
[Table view] Category:Final
MONTHYEARML22125A0482022-05-17017 May 2022 Final ASP Analysis - Davis-Besse Nuclear Power Station, Reactor Trip Due to Failed UPS and Sfrc System Actuations (LER 346-2021-003) - Precursor ML20168A4552020-06-16016 June 2020 Final ASP Analysis - Davis-Besse (LER 346-77-110) ML20168A4542020-06-16016 June 2020 Final ASP Analysis - Davis-Besse (LER 346-77-098) ML20168A4532020-06-16016 June 2020 Final ASP Analysis - Davis-Besse (LER 346-77-016) ML20147A5332020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-88-007) ML20147A5322020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-87-011) ML20147A5312020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-85-013) ML20147A5302020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-85-002) ML20147A5292020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-84-013) ML20147A5282020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-84-003) ML20147A5272020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-83-038) ML20147A5262020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-81-037) ML20147A5252020-05-26026 May 2020 Final ASP Analysis - Davis-Besse (LER 346-80-029) ML20112F5242020-05-12012 May 2020 Final ASP Analysis - Davis-Besse (LER 346-98-006) ML20112F4882020-05-12012 May 2020 Final ASP Analysis - Davis-Besse (LER 346-02-002) 2022-05-17
[Table view] |
Text
October 7, 1977 Half-trip of SFRCS Causes RCS Pressure Rise at Davis-Besse 1 lure sequence was:
purious half-trip of the SFRCS occurred, which initiated closure of a dwater valve, resulting in loss of water to one steam generator.
reduction in heat removal resulted in operation of the pressurizer ief valve, which failed open after 9 open/close cycles.
operator manually tripped the reactor;, within six minutes the RCS was saturation pressure/temperature.
pressurizer level went to maximum.
roximately 25 minutes later the operator realized the relief valve was ck open and closed the block valve, terminating the transient.
ve action:
SFRCS was monitored to detect spurious signals.
ns were also being developed to add additional SFRCS alarm windows and l in alarm conditions.
issing PORV control circuit relay was installed.
urpose of failed system or component:
am generator isolation during a steam line break.
bility of system per WASH 1400:
- SFRCS - type systems were not considered in WASH-1400.
bility of component per WASH 1400:
- availabilitie are in units of per demand D-1 . Failure rates are in per hour HR-'.
No No No No Yes No No Yes No No No No Yes Yes SIC 130788 - Actual Occurrence for Spurious Half-Trip fo SFRCS Causes RCS Pressure Rise at Davis-Besse I
Secondary Injection and LPR/HPI Core Heat Removal tross-Connect Damage 1
2 3
4 5
6 7
NSIC 130788 - Sequence of Interest for Spurious Half-Trip of SFRCS Causes RCS Pressure Rise at Davis-Besse 1 failure requires operator error in failing to close PORV block valve.
SION NUMBER: 130788 R: October 7, 1977 ENT: September 24, 1977 OLVED: Pressure relief of RC system INVOLVED: Valve ose relay missing from relief valve control circuit (PORV failure).
F INTEREST: Stuck open PORV - small LOCA.
URRENCE: Spurious 1/2 trip of steam and feedwater rupture control system.
ME: Davis-Besse 1 BER: 50-346 PE: PWR CTRICAL RATING: 906 MWe E: 0.5 yr
&W ENGINEERS: Bechtel Toledo Edison Co.
- 21. mi3es eaat o~f Toledo, Ohio N/A ATING CONDITION: 9% power TURE TYPE OF FAILURE: (ýD inadequate performance; (b) failed to start; (c) made inoperable; (d)__________
METHOD: Operational error.
No cause found for the 1/2 trip valve stuck open because pilot valve stem failed.