Letter Sequence Request |
---|
|
|
MONTHYEARRA-20-0012, License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices2020-03-12012 March 2020 License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices Project stage: Request ML20088A5332020-03-27027 March 2020 Relief Request 65 - Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge Line Weld Overlay Examination Project stage: Request ML20090L9442020-03-30030 March 2020 APS Response to Request for Additional Information- Relief Request 65 Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge Project stage: Response to RAI ML20091M1992020-03-31031 March 2020 NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay ISI Examinations Project stage: Other ML20091K0752020-03-31031 March 2020 NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay Examination Project stage: Acceptance Review NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications Project stage: Request NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2020-06-0505 June 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Project stage: Request NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications Project stage: Request ML20183A4602020-07-0101 July 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Project stage: Request ML20216A5392020-08-0606 August 2020 Relief Request 65 for Inspection of Reactor Pressure Vessel Bottom Mounted Instrument Nozzles and Pressurizer Surge Line Weld Overlay Project stage: Approval ML20344A4192020-12-0909 December 2020 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 Project stage: Other ML20345A3052020-12-10010 December 2020 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 Project stage: Other 2020-03-31
[Table View] |
Similar Documents at Fermi |
---|
Category:Letter type:NRC
MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML22101A0472022-04-0404 April 2022 Submittal of Application for the Renewal of National Pollutant Discharge Elimination System (NPDES) Permit NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes2021-03-31031 March 2021 License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-10-28028 October 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NRC-20-0040, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2020-06-23023 June 2020 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2020-06-0505 June 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NRC-19-0075, License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements2019-12-0606 December 2019 License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2019-11-0808 November 2019 DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-032019-09-0505 September 2019 License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 NRC-19-0001, License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation2019-02-27027 February 2019 License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation NRC-19-0002, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2019-02-0808 February 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities.2017-10-0909 October 2017 License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. NRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-08-31031 August 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17237A1762017-08-24024 August 2017 License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1 Isolation Functions NRC-17-0056, Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-08-15015 August 2017 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 NRC-17-0044, License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications2017-08-14014 August 2017 License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications NRC-17-0025, License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink2017-07-17017 July 2017 License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink NRC-17-0010, License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation2017-02-23023 February 2017 License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro2016-07-25025 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces NRC-16-0006, License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals2016-03-22022 March 2016 License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals NRC-15-0081, License Renewal Application Update for the Boraflex Monitoring Program2015-09-24024 September 2015 License Renewal Application Update for the Boraflex Monitoring Program NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-09-24024 September 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NRC-15-0067, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 352015-06-18018 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 35 NRC-15-0062, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 342015-06-0909 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 34 NRC-15-0044, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 312015-04-27027 April 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 31 NRC-15-0030, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 222015-03-19019 March 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22 NRC-15-0028, Revision to Response to License Renewal Environmental RAI SSSH-12015-02-18018 February 2015 Revision to Response to License Renewal Environmental RAI SSSH-1 NRC-15-0021, License Renewal Application - Response to LR-ISG-2013-012015-02-0505 February 2015 License Renewal Application - Response to LR-ISG-2013-01 NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan2014-10-21021 October 2014 License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan ML14121A5362014-04-24024 April 2014 Fermi 2, License Renewal Application, Page 3.3-2 Through Appendix C, Page C-13 ML14121A5352014-04-24024 April 2014 Fermi 2, License Renewal Application, Cover Through Page 3.3-1 ML14121A5382014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix D Through Appendix E, Page 3-169 ML14121A5392014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix E, Page 3-170 Through Page 9-23 NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End2014-04-24024 April 2014 License Renewal Application, Appendix E, Page 10-1 Through End NRC-13-0012, License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2013-04-17017 April 2013 License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles2013-01-11011 January 2013 Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0087, License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company2012-12-21021 December 2012 License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company NRC-12-0083, License Amendment Request to Change Licensee Name on the Operating License2012-12-21021 December 2012 License Amendment Request to Change Licensee Name on the Operating License NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report 2023-09-28
[Table view] Category:Technical Specification
MONTHYEARNRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes2021-03-31031 March 2021 License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-10-28028 October 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML20282A2302020-10-13013 October 2020 Correction to Amendment No. 216 - Revision to Technical Specifications in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2020-06-0505 June 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2019-11-0808 November 2019 DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-032019-09-0505 September 2019 License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 ML17305A0382017-10-16016 October 2017 Enclosures 1-6: 10CFR50.59 Evaluation Summary Report, Commitment Management Report, Revisions to Technical Requirements Manual and Technical Specifications Bases NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities.2017-10-0909 October 2017 License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro2016-07-25025 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces NRC-15-0091, License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating.2015-09-24024 September 2015 License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating. NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-09-24024 September 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan2014-10-21021 October 2014 License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan NRC-14-0010, License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries2014-04-23023 April 2014 License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases2012-11-0505 November 2012 Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.2011-12-20020 December 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0808 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. NRC-10-0047, Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B2010-05-14014 May 2010 Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B ML0735506002007-12-18018 December 2007 Tech Spec Pages for Amendment 177 Technical Specification (TS) Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to TS 3.7.4 NRC-07-0047, Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.42007-09-11011 September 2007 Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.4 NRC-07-0036, Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirement2007-07-12012 July 2007 Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirement NRC-07-0030, Application for Technical Specification Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to Technical Specification 3.7.4 Using the Consolidated Line Item Improvement Process2007-06-12012 June 2007 Application for Technical Specification Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to Technical Specification 3.7.4 Using the Consolidated Line Item Improvement Process NRC-06-0063, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process2006-11-27027 November 2006 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process NRC-06-0010, Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 122006-02-0505 February 2006 Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 12 ML0529900182005-10-25025 October 2005 Technical Specification Page Control Rod Scram Time Testing Frequency ML0433800092004-12-0707 December 2004 Correction to Amendment No. 163 Technical Specification Change Regarding Increased Flexibility in Mode Changes ML0433502482004-11-29029 November 2004 Technical Specifications, Technical Specification Change Regarding Increased Flexibility in Mode Changes NRC-04-0074, Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power Ratio2004-10-0707 October 2004 Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power Ratio ML0412503642004-04-23023 April 2004 Licensing Document Transmittal Firm 2 Technical Requirements Manual - Vol I, Revision 67, 04/23/2004. NRC-04-0006, Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation.2004-03-19019 March 2004 Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation. ML0407808262004-03-15015 March 2004 Technical Specification Pages for Amendment 159 NRC-04-0004, Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation.2004-01-30030 January 2004 Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation. ML0402207862004-01-16016 January 2004 Technical Specification Pages for Fermi 2, Amendment No. 158 ML0330903572003-10-30030 October 2003 Tech Spec Pages for License Amendment 157, Revised Action for SCRAM Discharge Volume Vent and Drain Valves NRC-03-0009, Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.592003-02-13013 February 2003 Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.59 2023-09-28
[Table view] Category:Amendment
MONTHYEARNRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-10-28028 October 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML20282A2302020-10-13013 October 2020 Correction to Amendment No. 216 - Revision to Technical Specifications in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2020-06-0505 June 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2019-11-0808 November 2019 DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-032019-09-0505 September 2019 License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro2016-07-25025 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces NRC-15-0091, License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating.2015-09-24024 September 2015 License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating. NRC-14-0010, License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries2014-04-23023 April 2014 License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries NRC-10-0047, Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B2010-05-14014 May 2010 Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B ML0735506002007-12-18018 December 2007 Tech Spec Pages for Amendment 177 Technical Specification (TS) Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to TS 3.7.4 NRC-07-0036, Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirement2007-07-12012 July 2007 Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirement NRC-06-0063, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process2006-11-27027 November 2006 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process NRC-06-0010, Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 122006-02-0505 February 2006 Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 12 ML0529900182005-10-25025 October 2005 Technical Specification Page Control Rod Scram Time Testing Frequency ML0433502482004-11-29029 November 2004 Technical Specifications, Technical Specification Change Regarding Increased Flexibility in Mode Changes NRC-04-0074, Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power Ratio2004-10-0707 October 2004 Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power Ratio ML0412503642004-04-23023 April 2004 Licensing Document Transmittal Firm 2 Technical Requirements Manual - Vol I, Revision 67, 04/23/2004. NRC-04-0006, Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation.2004-03-19019 March 2004 Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation. ML0407808262004-03-15015 March 2004 Technical Specification Pages for Amendment 159 NRC-04-0004, Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation.2004-01-30030 January 2004 Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation. ML0402207862004-01-16016 January 2004 Technical Specification Pages for Fermi 2, Amendment No. 158 ML0330903572003-10-30030 October 2003 Tech Spec Pages for License Amendment 157, Revised Action for SCRAM Discharge Volume Vent and Drain Valves 2023-09-28
[Table view] |
Text
Peter Dietrich Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4153 Fax: 734.586.1431 Email: peter.dietrich@dteenergy.com June 5, 2020 10 CFR 50.90 NRC-20-0032 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Pursuant to Title 10 of the Code of Federal Regulations Section 50.90 (10 CFR 50.90), DTE Electric Company (DTE) is submitting a request for an amendment to the Technical Specifications (TS) for Fermi Unit 2 (i.e., Appendix A, Technical Specifications of Renewed Facility Operating License NPF-43).
DTE requests adoption of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. TSTF-563 revises the TS definitions of Channel Calibration and Channel Functional Test, which currently permit performance by any series of sequential, overlapping, or total channel steps, to allow the required frequency for testing the components or devices in each step to be determined in accordance with the TS Surveillance Frequency Control Program. provides a description and assessment of the proposed changes. Enclosure 2 provides the existing TS pages marked to show the proposed changes. Enclosure 3 provides revised (clean) TS pages.
Approval of the proposed amendment is requested within one year of the date of this letter.
Once approved, the amendment shall be implemented within 60 days.
No new commitments are being made in this submittal.
In accordance with 10 CFR 50.91, a copy of this application, with enclosures, is being provided to the designated Michigan State Official.
USNRC NRC-20-0032 Page 2 Should you have any questions or require additional information, please contact Ms. Margaret Offerle, Manager - Nuclear Licensing, at (734) 586-5076.
I declare under penalty of pe1jury that the foregoing is true and correct.
Peter Dietrich Senior Vice President and Chief Nuclear Officer
Enclosures:
- 1. Description and Assessment
- 2. Proposed Technical Specification Changes (Mark-Up)
- 3. Revised Technical Specification Pages cc: NRC Project Manager NRC Resident Office Regional Administrator, Region III Michigan Department of Environment, Great Lakes, and Energy
Enclosure 1 to NRC-20-0032 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Description and Assessment to NRC-20-0032 Page 1
1.0 DESCRIPTION
DTE Electric Company (DTE) requests adoption of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. TSTF-563 revises the Technical Specification (TS) definitions of Channel Calibration and Channel Functional Test, which currently permit performance by any series of sequential, overlapping, or total channel steps, to allow the required frequency for testing the components or devices in each step to be determined in accordance with the TS Surveillance Frequency Control Program.
2.0 ASSESSMENT 2.1 Applicability of Safety Evaluation DTE has reviewed the safety evaluation for TSTF-563 provided to the Technical Specifications Task Force in a letter dated December 4, 2018. This review included a review of the NRC staffs evaluation, as well as the information provided in TSTF-563. DTE has concluded that the justifications presented in TSTF-563 and the safety evaluation prepared by the NRC staff are applicable to Fermi 2 and justify this amendment for the incorporation of the changes to the Fermi 2 TS.
A Surveillance Frequency Control Program was incorporated into the Fermi 2 TS in a license amendment dated July 14, 2015 (NRC Agency Documents Access and Management System (ADAMS) Accession No. ML15155B416).
2.2 Optional Changes and Variations DTE is proposing the following variations from the TS changes described in the TSTF-563 or the applicable parts of the NRC staffs safety evaluation:
The Fermi 2 TS definition of CHANNEL CALIBRATION uses slightly different wording than Revision 4 of the General Electric BWR/4 Standard TS (STS) (NUREG-1433) on which TSTF-563 is based. Specifically, the Fermi 2 definition uses A CHANNEL CALIBRATION rather than The CHANNEL CALIBRATION (italics added to show the difference).
The Fermi 2 TS definition of CHANNEL FUNCTIONAL TEST uses slightly different wording than Revision 4 of the General Electric BWR/4 STS (NUREG-1433) on which TSTF-563 is based. Specifically, the Fermi 2 definition uses A CHANNEL FUNCTIONAL TEST rather than The CHANNEL FUNCTIONAL TEST (italics added to show the difference).
These minor wording differences in the existing portions of the definitions are editorial only and have no effect on the applicability of either the proposed TSTF-563 change to the Fermi 2 TS or the NRC staffs safety evaluation dated December 4, 2018.
to NRC-20-0032 Page 2
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Analysis DTE Electric Company (DTE) requests adoption of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. TSTF-563 revises the Technical Specification (TS) definitions of Channel Calibration and Channel Functional Test, which currently permit performance by any series of sequential, overlapping, or total channel steps, to allow the required frequency for testing the components or devices in each step to be determined in accordance with the TS Surveillance Frequency Control Program.
DTE has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, Issuance of amendment, as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change revises the TS definitions of Channel Calibration and Channel Functional Test to allow the frequency for testing the components or devices in each step to be determined in accordance with the TS Surveillance Frequency Control Program. All components in the channel continue to be calibrated. The frequency at which a channel calibration is performed is not an initiator of any accident previously evaluated, so the probability of an accident is not affected by the proposed change. The channels surveilled in accordance with the affected definitions continue to be required to be operable and the acceptance criteria of the surveillances are unchanged. As a result, any mitigating functions assumed in the accident analysis will continue to be performed.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change revises the TS definitions of Channel Calibration and Channel Functional Test to allow the frequency for testing the components or devices in each step to be determined in accordance with the TS Surveillance Frequency Control Program. The design function or operation of the components involved are not affected and there is no physical alteration of the plant (i.e., no new or different type of equipment will be installed).
No credible new failure mechanisms, malfunctions, or accident initiators not considered in the design and licensing bases are introduced. The changes do not alter assumptions made in to NRC-20-0032 Page 3 the safety analysis. The proposed changes are consistent with the safety analysis assumptions.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The proposed change revises the TS definitions of Channel Calibration and Channel Functional Test to allow the frequency for testing the components or devices in each step to be determined in accordance with the TS Surveillance Frequency Control Program. The Surveillance Frequency Control Program assures sufficient safety margins are maintained, and that design, operation, surveillance methods, and acceptance criteria specified in applicable codes and standards (or alternatives approved for use by the NRC) will continue to be met as described in the plants licensing basis. The proposed change does not adversely affect existing plant safety margins or the reliability of the equipment assumed to operate in the safety analysis. As such, there are no changes being made to safety analysis assumptions, safety limits, or limiting safety system settings that would adversely affect plant safety as a result of the proposed change. Margins of safety are unaffected by method of determining surveillance test intervals under an NRC-approved licensee-controlled program.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, DTE concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
3.2 Conclusion In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
4.0 ENVIRONMENTAL EVALUATION The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change to NRC-20-0032 Page 4 meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
Enclosure 2 to NRC-20-0032 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Proposed Technical Specification Changes (Mark-Up)
Definitions
- 1. 1 1.0 USE AND APPLICATION 1.1 Definitions The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.
Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
AVERAGE PLANAR LINEAR The APLHGR shall be applicable to a specific HEAT GENERATION RATE planar height and is equal to the sum of the (APLHGR) LHGRs for all the fuel rods in the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at the height.
CHANNEL CALIBRATION A CHANNEL CALIBRATION shall be the adjustment, as necessary, of the channel output.such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. A CHANNEL CALIBRATION shall encompass all devices in the channel required for channel OPERABILITY and the CHANNEL FUNCTIONAL TEST.
Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. A CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping, or total channel steps.
, and each step must be performed within the Frequency in the Surveillance Frequency Control Program for the devices included in the step (continued)
FERMI - UNIT 2 1.1-1 Amendment No. 134
Definitions 1.1 1.1 Definitions (continued)
CHANNEL CHECK A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter.
CHANNEL FUNCTIONAL TEST A CHANNEL FUNCTIONAL TEST shall be the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify OPERABILITY of all devices in the channel required for channel OPERABILITY. A CHANNEL FUNCTIONAL
, and each step must be performed TEST may be performed by means of any series of within the Frequency in the Surveillance sequential, overlapping, or total channel steps.
Frequency Control CORE Program for the ALTERATION CORE ALTERATION shall be the movement of any fuel.
devices included in the step sources, or reactivity control components, within the reactor vessel with the vessel head removed and fuel in the vessel. The following exceptions are not considered to be CORE ALTERATIONS:
- a. Movement of source range monitors, local power range monitors, intermediate range monitors, traversing incore probes, or special movable detectors (including undervessel replacement);
and
- b. Control rod movement, provided there are no fuel assemblies in the associated core cell.
Suspension of CORE ALTERATIONS shall not preclude completion of movement of a component to a safe position.
(continued)
FERMI - UNIT 2 1.1-2 Amendment No. 134
Enclosure 3 to NRC-20-0032 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Revised Technical Specification Pages
Definitions 1.1 1.0 USE AND APPLICATION 1.1 Definitions
NOTE-------------------------------------
The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.
Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
AVERAGE PLANAR LINEAR The APLHGR shall be applicable to a specific HEAT GENERATION RATE planar height and is equal to the sum of the (APLHGR) LHGRs for all the fuel rods in the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at the height.
CHANNEL CALIBRATION A CHANNEL CALIBRATION shall be the adjustment, as necessary, of the channel output such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. A CHANNEL CALIBRATION shall encompass all devices in the channel required for channel OPERABILITY and the CHANNEL FUNCTIONAL TEST.
Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. A CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping, or total channel steps, and each step must be performed within the Frequency in the Surveillance Frequency Control Program for the devices included in the step.
(continued)
FERMI - UNIT 2 1.1-1 Amendment No. 134
Definitions 1.1 1.1 Definitions (continued)
CHANNEL CHECK A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter.
CHANNEL FUNCTIONAL TEST A CHANNEL FUNCTIONAL TEST shall be the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify OPERABILITY of all devices in the channel required for channel OPERABILITY. A CHANNEL FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total channel steps, and each step must be performed within the Frequency in the Surveillance Frequency Control Program for the devices included in the step.
CORE ALTERATION CORE ALTERATION shall be the movement of any fuel, sources, or reactivity control components, within the reactor vessel with the vessel head removed and fuel in the vessel. The following exceptions are not considered to be CORE ALTERATIONS:
- a. Movement of source range monitors, local power range monitors, intermediate range monitors, traversing incore probes, or special movable detectors (including undervessel replacement);
and
- b. Control rod movement, provided there are no fuel assemblies in the associated core cell.
Suspension of CORE ALTERATIONS shall not preclude completion of movement of a component to a safe position.
(continued)
FERMI - UNIT 2 1.1-2 Amendment No. 134