Proposed Tech Specs,Clarifying Operability Requirements for Primary Containment Oxygen Analyzer Based on Installation of Redundant Channels Per Reg Guide 1.97 & to Incorporate Several Administrative Changes
ML20155J826
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/16/1988
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20155J824 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8806210048
Download: ML20155J826 (5)


Text

... _..

COOPER NUCLEAR STATION TABLE 3.2.E INSTRUMEN'IATION TilAT HONITORS DRYWELL LEAK DETECTION Minimum Number of Action Required When Instrument Operable Components Component Operability l

Instrument I.D. No.

Setting Limit Is Not Assured (2)

I Drywell Floor Drain Sump Flow RW-FT-354 N.A.

1 A

Drywell Equipment Drain Sump RW-FT-364 N.A.

1 A

t I

Flow Air Sampling System RMV-RM-4 A,B&C N.A.

1 A

NOTES FOR TABLE 3.2.E I.

The two (2) flow transmitters, one for the equipment drain sump and the other for the floor drair. sump, comprise the basic instrument system.

l 8

The air sampling system is an alternate system to this system.

I t

2.

Action A.

Refer to Specification 3.6.C of this Technical Specification.

i i

i i

i i

I I

8806210048 880616 l

INT ADOCK 05000298 DCD e

1 COOPER NUCLEAR STATION TABLE 3.2.F PRIMARY CONTAINMENT SURVEILLAFE INSTRUMENTATION

^

l l

Minin.um Number Action Required When Instrument of Operable Minimum Condition Instrument I.D. No.

Range Instrument Channels Not Satisfied (1)

Reactor Ester Level NBI-LI-85A

-150" to +60" 2

A B.C l

i NBI-LI-85B

-150" to +60" Reactor Pressure RFC-PI-90A 0 - 1200 psig 2

A.B.C RFC-PI-908 0 - 1200 psig j

1 Dryweil Pressure PC-PR-2A

-5 to 70 psig 2

A,B,C l

PC -PR-2 B

-5 to 70 psig l,

PC-PR-1A 0 - 250 psig 2

F PC-PR-1B 0 - 250 psig Drywell Temperature PC-TR-503 50 - 170*F 2

A,B,C PC-TI-505 50 - 350*F Suppression Chamber / Torus PC-TR-21A 0 - 300*F 2

A,B,C Air Temperature PC-TR-23, Det 1&2 0 - 400*F l

.[

as f

y Suppression Chamber / Torus PC-TR-24, Det la to lh 0 - 250*F 1 (2)

Note 2 Water Temperatt.re PC-TR-25, Det 2a to 2h 0 - 250*F l

Suppression Chamber / Torus l

Water Le el PC-LI-10

(-4' to +6')

2 A,B.C j-PC-LR-ll

(-4' to +6')

PC-LI-12

-10" to +10" 2

A.B.C.E PC-LI-13

-10" to +10" PC-LR-1A 0 - 30' 2

F PC-LR-1B 0 - 30' Suppression Chamber / Torus PC-PR-20 0 - 2 psig 1

B,C l

Pressure I

Control Rod Position N.A.

Indicating Lights 1

A.B.C.D Neutron Monitoring N.A.

S.R.M.,

I.R.M.,

1 A.B.C.D LPRM j

0 - 100% poser

i f

Primary Containment Oxygen PC-AN/CS-Il /O A Various 2 (3)

A,B,C 2

Concentratien PC-AN/CS-Il /O B Various 2

t f

a r

.+~

e-,

,c

NOTES FOR TABLE 3.2.F 1.

The following actions will be taken if the minimum number of operable instrument channels as required are not available.

A.

From and after the date that one of these parameters is reduced to one indication, continued operation is permissible during the succeeding thirty days unless such instrumentation is sooner made operable.

B.

From and after the date that one of these parameters is not indicated in the control room, continued operation is permissible during the succeeding seven days unless such instrumentation is sooner made operable.

C.

If the requirements of A and B above cannot be met, an orderly shutdown shall be initiated within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

D.

These surveillance instruments are considered to be redundant to each other.

E.

In the event that both channels are inoperable and indication cannot be restored in six (6) hours, an orderly shutdown shall be in'.tiated and the reactor shall be in Hot Shutdown in six (6) hours and in a Cold Shutdown condition in the following eighteen (18) hours.

F.

From and after the date that one of these parameters is reduced to one indication, either re. tore the inoperable component (s) to operable status within 30 days of the event, or prepare and submit a Special Report to the Commission outlinin5 the action taken, the cause of the inoperability and the plans and schedule for restoring the system to operable status.

In the event that both channels are inoperable and indication cannot be restored in fourteen (14) days, an orderly shutdown shall be initiated.

2.

Each channel contains eight detectors.

A channel is considered inoperable if two adjacent detectors are unmonitored by the channel in question.

A.

From and after the date that one channel becomes inoperable, continued operation is permissible during the succeeding seven days unless sooner made operabic.

B.

From and after the date that che second channel becomes inoperable, i

an orderly shutdown shall be initiated within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> unless sooner made operable.

3.

During periods when both channels are inoperable, grab samples may be taken to verify primary containment oxygen concentration.

66

,-n

-~,,w r

---wm-x,-,

l COOPER NUCLEAR STATION TABLE 4.2.E

=,

l MINIMUM TEST AND CALIBR*. TION FREQUENCY FOR DRYWELL LEAK DETECTION l

+

l l

Instrument Item Item I.D. No.

Function Test Freq.

Calibration Freq.

Check Instrument Channel 1.

Equipment Drain Sump Flow RW-FT-(364)

Once/ Month (1)

Once/3 Months Once/ Day 2.

Floor Drain Sump Flow RW-FT-(354)

Once/ Month (1)

Once/3 Months once/ Day l

I 3.

Air Sampling System RMV-RM-4A, B & C Once/ Month (1)

Once/3 Months Once/ Day l

l h

i l

1 l

l l

\\

i 1

6 d

l. !

I

{

l

. ~,

-,,v-,

~.

COOPER NUCLEAR STATION i

TABLE 4.2.F

~

PRIMARY CONTAINMENT SLRVEILLANCE INSTRUMENTATION

=

TEST AND CALIBRATION FREQilENCIES Instrument Instrument I.D. No.

Calibration Frequency Instrument Check Rasctor Water Level NBI-LI-85A Once/6 Months Each Shift NBI-LI-85B Once/6 Months Each Shift Rasctor Pressure RFC-PI-90A Once/6 Months Each Shift RFC-PI-908 Once/6 Months Each Shift Drywell Pressure PC-PR-2A Once/6 Months Each Shift PC-PR-2B Once/6 Months Each Shift PC-PR-IA Once/6 Months Each Shift PC-PR-1B Once/6 Months Each Shift Drywell Temperature PC-TR-503 Once/6 Months Each Shift PC-TI-505 Once/6 Months Each Shift

& Suppression Chamber / Torus PC-TR-21A Once/6 Months Each Shift

? Air Temperature PC-TR-23, Det 1&2 Once/6 Months Each Shift Suppression Chamber / Torus PC-TR-24, Det la to lh Once/6 Months Each Shift Wster Temperature PC-TR-25, Det 2a to 2h Once/6 Months Each Shift Suppression Chamber / Torus PC-LI-10 Once/6 Months Each Shift Water Level PC-LR-Il Once/6 Months Each Shift PC-LI-12 Once/6 Months Each Shift PC-LI-13 Once/6 Months Each Shift

?

j' PC-LR-IA Once/6 Months Each Shift PC-LR-1B Once/6 Months Each Shift Suppression Chamber / Torus PC-PR-20 Once/6 Months Each Shift Pressure Control Rod Position N.A.

N.A.

Each Shift Neutron Monitoring (APRM)

'N.A.

Once/ Week Each Shift Primary Containment Oxygen PC-AN/CS-H /0 A Once/3 Months Once/ Day Concentration PC-AN/CS-II /0 B Once/3 Months Once/ Day

--