Text
.4
i
1
,8
JUN 081988
,
"
Docket No. 50-424
Licensh No. NPF-68
- f'
Gporgia- Power Company
MTTM: Mr. R. P. McD0nald
Executive Vice President -
Nuclear-Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N0. 50-424/88-12
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
N. Merriweather on March 21-25, 1988.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspe<: tion report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procGures
and representative records, interviews with personnel, and observation of
activities in progress.
t
-Within the scope of the inspection, no violations or deviations were identi-/
fled.
,
,
Your attention is invited to the unresolved item identified in the inspection
report. This matter will be pursued during future inspections.
]
The enclosed Inspection Report documents oral commitments (see Paragraphs
6.a
6.d, 6.h.9, 21, 22 and 25, and 6.i .) made by a licensee representative
and discussed in the exit interview.
If your understanding of these commitments
differs from the report statements, please inform this office promptly.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
'
Title 10, Code of Federal Regulatfor.s, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
l
i
!
1
8806210022 880608
ADOCK 05000424
g
l
Q
1
.
-
_
.
l
-
jfl % $ $ %
.j
' ~
j
. . , . '
.
~
.
1
. Georgia Power Company
.2-
'
'
[
Should you have any questions concerning this letter, please contact us.
Sincerely,l
M
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC, Inspection Report
cc w/ encl:
WD. Rice,'Vice Presid'at, Project
Director
Y H, Hayes, Vogtle Quality
Assurance Manager
f Bockhold, Jr., General Manager,
Nuclear 0, erations
V. Gucwa, Manager, Nuclear Safety
,
and Licensirg
Q /'A. Bailey, Project Licensing
)(anager
(8. W Churchill, Esq., Shaw,
Pittrxa. Potts and Trowbridge
.
JYKirkland, III, Counsel,
0 ice of the Consumer's Utility
uncil
. Feig, Georgians Against
Nuclear Energy
bec w/ encl:
eis, 0GC
Hopkins, NRR
M. Sinkule, RII
D
, Technica.1 Assistant
C Resident Inspector
l
Occument Control 'esk
i
State of Georgia
.
(,f6 80
'
l
p bj
,
RILg
y
..
oc&
e
TConlun
MSinkule
POW d '
!
NMerriwer?.,.
r
05/f /88
05/J7/88
'N5/ .3,/88
6kN
'
m
. . . - - .
. .
-__. . . . . _ _ . _
-
. .
.
-
,
. .
. . .