ML20155J594

From kanterella
Jump to navigation Jump to search
Forwards SER Supporting Licensee 840409 Request for Relief from Section XI of ASME Code Re Inservice Insp Requirements Based on Accompanying Updated Inservice Insp Program.Relief from Insp of Longitudinal & Circumferential Welds Denied
ML20155J594
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/12/1986
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20155F819 List:
References
NUDOCS 8605270112
Download: ML20155J594 (5)


Text

_ _ . -_. _ _ _ _ -. _. _ __ _- _ - ._ _

1 .

/%

kg NUCLEAR REGULATORY COMMISSION UNITED STATES r, a wasmuorow, o. c.2 ossa

% ,,,,, # May 12,1986 Docket No. 50-213

Mr. John F. Opeka, Senior Vice President

! Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270

, Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

RELIEF FROM INSERVICE INSPECTION REQUIREMENTS AT THE HADDAM NECK PLANT i

By letter dated April 9, 1984, Connecticut Yankee Atomic Power Company (CYAPCO) submitted an updated inservice inspection program and information related to requests for relief from certain Code requirements determined to be impractical to perform on the Haddam Neck Plant. The updated i program is based on the requirements of the 1980 Edition, through Winter j 1980 Addenda, of Section XI of the ASME Code, and will remain in effect

until January 1,1988, unless the program is modified or changed prior to the interval end date.

The staff has completed its review of the updated program and is granting relief from the examination requirements, which we have determined would be impractical to perform. Granting of this relief will not compromise the safety of the facility. These relief requests are identified in Tables +

1 through 5 of the staff Safety Evaluation. We have also denied the relief

, request from the Code inspection of longitudinal and circumferential welds

because CYAPC0 has not provided sufficient infonnation to evaluate the

! extent of relief required for piping examinations. Further, it is not

the practice of the staff to grant blanket relief from the Code requirements.

j Should CYAPC0 desire relief from the Code required piping examinations, CYAPC0 i

' should provide a new submittal describing the specific pipe sections affected and the specific relief required.

i j The staff concludes that granting relief where the Code requirements are

! impractical is authorized by law. The relief granted from the examination and testing requirements will not endanger life or property, or the couanon defense and security, and is otherwise in the public interest considering the i

I l 8605270112 86051223 DR ADOCK O .

{

. . - . - ,,u_,.-~- ~ . . . .,--.,--,-.-,_---------.--,-,--,.,---,,--,,-,.--n -

Mr. John F. Opeka burden that could result upon CYAPC0 if these requirements were imposed on the Haddam Neck Plant. Accordingly, pursuant to 10 CFR 50.55a(g)(6)(i) of the Commission's regulations, Connecticut Yankee Atomic Power Company is granted relief as described in Tables 1 through 5 of the Safety Evaluation.

A copy of our Safety Evaluation and its supporting technical evaluation 1 report is enclosed. '

Sincerely, 1

/ . \

Y1 W h. t a n cA l

Christopher I. Grimes, Director l Integrated Safety Assessment i Project Directorate Division of PWR Licensing - B

Enclosures:

As stated cc w/ enclosures:

See next page I

l l

l l

May 12,1986 .

Mr. John F. Opeka burden that could result upon CYAPC0 if these requirements we imposed on the Haddam Neck Plant. Accordingly, pursuant to 10 CFR 50. a(g)(6)(i) of the Commission's regulations, Connecticut Yankee Atomic Pow'r e Company is granted relief as described in Tables 1 through 5 of thef $afety Evaluation.

A copy of our Safety Evaluation and its supporting techriical evaluation report is enclosed.

, Sincerely, /

i Originalsigne!by: C. I. Grimes

/ i Christopher I. Grimes, Director Integrdted Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

/

As stated j

/

cc w/ enclosures: '

See next page l-

/

/ Christopher I. Grimes, Director i

,- Integrated Safety Assessment

/ Project Directorate e

Division of PWR Licensing - B

Enclosures:

/

As stated /

l cc w/ enclosures: '

/ 1 See next page 'j  !

j DISTRIBUTION

/ Docket File FAkstulewicz

/ NRC PDR PAnderson

/ Local PDR ACRS (10) 7 ISAP Reading NSIC

/

FMiraglia CGrimes

/ OELD GJohnson

/ EJordan BGrimes JPartlow ISAP:DPL-B A LA; - L-B D:ISAP:DPL- ELD FAkstulewicz:mn par son CGrimes 4 /3c/86 /p/86 (g /jy86 g b/86

na- 2/3

. e s

May 12, 1986 Mr. John F. Opeka -

2-burden that could result upon CYAPC0 if these requirements were imposed on the Haddam Neck Plant. Accordingly, pursuant to 10 CFR 50.55a(g)(6)(1) of the Commission's regulations, Connecticut Yankee Atomic Power Company is granted relief as described in Tables 1 through 5 of the Safety Evaluation.

A copy of our Safety Evaluation and its supporting technical evaluation report is enclosed.

Sincerely, Original signed by: C. I. Grimes Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

As stated 1 cc w/ enclosures:

See next page DISTRIBUTION

@ Docket File;j FAkstulewicz

FMiraglia CGrimes OELD GJohnson EJordan RDiggs BGrimes JPartlow W

  • SEE PREVIOUS SHEET FOR CONCURRENCE.

ISAP:DPL-B* LA:ISAP:DPL-B* D:ISAP:DPL-B* OELD*

FAkstulewicz:mn- PAnderson CGrimes Goddard 4

04/30/86 04/30/86 05/12/86 05/06/86 i

, , - - - , ,e . -

r , , , y ,m .- , - , _

p-- ,.- , ,. ,

~

Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Edward J. Mroczka

  • Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103

{

State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission -

631 Park Avenue I

King of Prussia, Pennsylvania 19406

)

i l

1 i

I j