r
.
MAY 161986
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Mr. K. D. Ward of
this office on April 24, 29-30 and May 1-2, 1986, of activities at Byron
Station, Units 1 and 2, authorized by NRC Operating License No. NPF-37, and
NRC Construction Permit No. CPPR-131 and to the discussion of our findings
with Mr. E. Martin and others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
inte'rviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
#'
. CMC 1 chm 1 b7 0' 0'
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Reports
No. 50-454/86017(DRS);
No. 50-455/86015(DRS)
See Attached Distribution
L{C[
Q
RIII
RIII
RIII
g
je[
h
on
ri
Da)>clib
ard
w
r
=5 %
L /s-
_ /,,-trL
Sys(&
5 /t>j = -
y
~t's-
'
t-
-
7
l
j.l (
ADOC
54
N0/
'
- G.
.._
s
__.
g . -_
- "
'
.
<
r
!
,:
.
-Commonwealth Edison Company
2
MAY 2 6 ;5d6
,
.
~
t
Distribution
,
'
cc w/ enclosure:
l
D. L. Farrar, Director
of Nuclear Licensing
l-
V. I. Schlosser, Project Manager
i
Gunner Sorensen, Site Project
Superinterdent
i
R. E. Querto, Plant Manager
DCS/RSB (RIDS)
'
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood-
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D.' W. Cassel, Jr., Esq.
Diane Chavez, DAARE/ SAFE
L
Steve Lewis, ELD
.L. 01shan, NRR LPM
H. S. Taylor, Quality Assurance-
Division
!
!
u .-