Forwards Final Reactor Containment Bldg Integrated Leak Rate Test. Measured Leak Rate Test Met Acceptance Criteria
ML20155J339
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/18/1988
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20155J342 List:
References
NUDOCS 8810260031
Download: ML20155J339 (1)


Text

_, - - -, _ _ - - _ -

f5?

Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P. O. Box 128 SAN CLEMENTE. CALIFORNIA 92672

.".[o"",..^o" oNS.'Y.1 u

October 18, 1988 U. S. Nuclear Regu atory Commission Document Control Desk Washington, D. C.

20555

Subject:

Docket No. 50-362 Reactor Containment Building Integrated Leak Rate Test San Onofre Nuclear Generating Station, Unit 3 An Integrated Leak Rate Test (ILRT) was performed at Sen Onofre Unit 3 during July 1988. The test was performed in accordance with the requirements of the Unit 3 Technical Specifications.

Both the measured leak rate test and supplemental verification test met the acceptance criteria set forth in the Technical Specifications.

The enclosed ILRT report for San Onofre Unit 3 constitutes aur final report and is being submitted pursuant to 10 CFR 50, Appendix J.

If additional information is required, please so advise.

Sincerely, kb Enclosure J. B. Martin (Regional Administrator, USNRC Region V) cc:

F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3) 8810260031 881018

~