_, - - -, _ _ - - _ -
f5?
Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P. O. Box 128 SAN CLEMENTE. CALIFORNIA 92672
.".[o"",..^o" oNS.'Y.1 u
October 18, 1988 U. S. Nuclear Regu atory Commission Document Control Desk Washington, D. C.
20555
Subject:
Docket No. 50-362 Reactor Containment Building Integrated Leak Rate Test San Onofre Nuclear Generating Station, Unit 3 An Integrated Leak Rate Test (ILRT) was performed at Sen Onofre Unit 3 during July 1988. The test was performed in accordance with the requirements of the Unit 3 Technical Specifications.
Both the measured leak rate test and supplemental verification test met the acceptance criteria set forth in the Technical Specifications.
The enclosed ILRT report for San Onofre Unit 3 constitutes aur final report and is being submitted pursuant to 10 CFR 50, Appendix J.
If additional information is required, please so advise.
Sincerely, kb Enclosure J. B. Martin (Regional Administrator, USNRC Region V) cc:
F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3) 8810260031 881018
~
0I'i I
9DR ADOCK 05000362 p