Docket Nos. 50-259, 50-260, 50-296
License Nos. OPR-33, DPR-52, DPR-68
Tennessee Valley Authority
ATTN:
Mr. S, A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
j
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-259/88-10, 50-260/88-10 AND
50-296/88-10
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. L. Paulk on April 1-30, 1988. The inspection included a review of activities
j
authorized for your Browns Ferry facility.
At the conclusion of the inspec-
1
tion, the findings were discussed with those members of your staff identified
in the enclosed inspection report.
Areas examined during the inspection included operational safety, maintenance
observation, surveillance testing observation, reportable occurrences, restart
testing, personal dosimetry, fuel reconstitution, and Q-List.
Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activi-
ties in progress.
The inspection findings indicate certain activities appeared to violate NRC
requirements in the area of procedural guidance for the preparation of NRC
licensing submittals.
The violation, references to pertinent requirements,
and elements to be included in your response are described in the enclosed
Also, please note that the Inspector Followup Item
260/83-10-01, addressed in paragraph 6 of the report, requires satisfactory
resolution prior to fuel load. This item pertains to an installation defi-
ciency of main steam tunnel blowout panels.
In accordance with Section 2,790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
.
8806200405 880603
ADOCK 05000259
i(
o
ncn
s c
.
.
'
.
e
,
i
Tennessee Valley Authority
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED BY
KENNETH P BARR
Kenneth P. Barr, Acting Assistant
Director for Inspection Programs
TVA Projects Division
Office of Special Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
H. P. Pomrehn, Site Director
Browas Ferry Nuclear Plant
R. L. Gridley, Director
Nuclear Safety and Licensing
J. A. Kirkebo, Director,
Nuclear Engineering
M. J. May, Site Licensing Manager
J. G. Walker, Plant Manager
TVA Representative, Rockville
Office
bec w/ encl:
S. D. Ebneter, OSP
S. D. Richardson, OSP
S. Black, OSP
B. D. Liaw, OSP
W. S. Little, OSP/RII
G. E. Gears, OSP
D. Moran, OSP
A. J. Ignatonis, OSP/RII
A. H. Johnson, OSP/RII
J. Rutberg, CGC
NRC Resident Inspector
DRS, Technical Assistant
l
NRC Document Control Desk
State of Alabama
OSP/RII
OSP/RII
'P
II
AJob
es
AIcn
s
V i tie
5/ /c
6/3/S8
1/ /03
1
1