ML20155G490

From kanterella
Jump to navigation Jump to search

Forwards Amend 103 to License DPR-61 & Safety Evaluation. Amend Renumbers Manual HPSI Throttle Valves in Tech Spec 3.6.B.2 to Be Consistent W/Plant Loop Numbering Scheme
ML20155G490
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/26/1988
From: Wang A
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20155G493 List:
References
TAC-67389, NUDOCS 8806170330
Download: ML20155G490 (2)


Text

_ _

May 26, 1988 Docket No. 50-213 DISTRIBUTION D5 We E F.U i >

EJordan NRC & Local PORs JPartlow SVarga TBarnhart(4)

Mr. Edward J. Mroczka BBoger Wanda Jones Senior Vice President SNorris EButcher Nuclear Engineering and Operations AWang ACRS(10)

Connecticut Yankee Atomic Power Company OGC-WF GPA/PA DHagan ARM /LFHB P. O. Box 270 Gray File Hartford, Connecticut 06141-0270

Dear Mr. Hroczka:

SUBJECT:

ISSUANCE OF AMENDMENT (TAC N0. 67389)

The Commission has issued the enclosed Amendment No.103 o Facility Operating t

License No. OPR-61 for the Haddam Neck Plant, in response to your application dated February 25, 1988.

The amendment renumbers the manual high pressure safety injection (HPSI) throttle valves in Technical Specification 3.6.8.2 to be consistent with the plant loop numbering scheme. Also, the. applicability statement for Technical Specification 3.6.8.2 has been changed to be more concise and MODE specific and the Basis for Technical Specification 3.6 has been clarified.

A copy of the related Safety Evaluation is also enclosed.

The notice of issuance will be included in the Commission's bi-weekly Federal Register notice.

Sincerely, original signed by Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No. 10$o DPR-61 2.

Safety Evaluation cc w/ enclosures:

See next page LA: DW Pfl: POI-4 I-4 OGC SN ris AWang:M JS

/4 M j

0 / n/88 0//go/88 4(/ (/8 r D

0//>#/88 5

5 3

5 8806170330 880526 PDR ADOCK 05000213 P

PDR L

c Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire R. H. Kacich, Manager Day, Berry and Howard Generation Facilities licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0??0 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region i Department of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 06106 J. T. Shedlosky, Resident inspector Haddam Neck Plant D. B. Miller, Station Superintendent c/o U. S. Nuclear Regulatory Commission Haddam Neck Plant Post Office Box 116 Connecticut Yankee Atomic Power Company East Haddam Post Office RfD 1, Post Office Box 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G. H. Bouchard, Unit Superintendent Haddam Neck Plant RF0 fl Post Office Box 127E East Hampton, Connecticut 06424

_ _ _ _ _ _ _ _