ML20155G484

From kanterella
Jump to navigation Jump to search

Forwards Request for Addl Info Re Util 880805 Submittal on Operation W/Feedwater Heaters Out of Svc to Complete Review of Sections 4.2 & 5.3 of NEDO-31583.Response Requested within 45 Days
ML20155G484
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/03/1988
From: Paulson W
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
References
TAC-69105, NUDOCS 8810170107
Download: ML20155G484 (4)


Text

.

October 3,1988 Docket No. 50-458 Gulf States Utilities Company ATTN: Mr. James C. Deddens Senior Vice President (RBNG)

Post Office Box 220 St. Francisville Louisiana 707'. :

Dear ftr. Deddens:

SUPJECT: REQUEST FOR ADDITIONAL INFORMATION - FEE 0 WATER HEATER (S) OUT OF SERVICE (TAC NO. 69105)

The NRC staff is reviewing Gulf States Utilities' August 5,19ES submittal regarding operation with feedwater heaters out of service. The staff has identified additional information that is needed to complete the review of Sections 4.P and 5.3 of hED0-31583 that was included in your submittal.

Please provide your response to the enclosure within 45 days of the receipt of this letter. The staff's review of the other sections of your August 5, 1988 letter is continuing.

The reporting ar.d/or recordkeeping requirements contained in this letter affect fewer that. ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, is/

Walter A. Paulson, Project fianager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION

D6cliWFTTE NPC PCR Local POR PD4 Reading L. Rubenstein J. Calvo P. Noonan W. Paulson OGC-Rockville E. Jordan B. Grines ACRS (10)

PD4 Plant File PD4/L/Q Q' ~ P PD4/0 /*

PNoona6 0 K son:sr JCalvo (0/3 188 (0/3/E8

}/1/E8 y p, swa mr em_o, e -~ ,,

4 PDC

/ "'o, , UNITED STATES 8' '

c NUCLEAR REGULATORY COMMISSION

, E ,j WASHINGTON, D C. 20665

%, * . . . ,/ October 3,1988 Docket No. 50-458 1

Gulf States Utilities Company '

ATTN: Mr. James C. Deddens SeniorVicePresident(RBNG) ,

Post Office Box 220 '

St. Francisville, Louisiana 70775

Dear Mr. Deddens:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - FEEDWATER j

HEATER (S) 001 0F SERVICF (TAC NO 69105)

The Nkt staff is reviewing Gulf States Utilities' August 5, 1988 submittel  ;

regarding operation with feedwater heaters out of service. The staff has '

)

identified additional information that is needed to complete the review of Sections 4.0 and 5.3 of NECO-31583 that was included in your submittal.

Please provide your response to the enclosure rithin 45 days of the receipt of this lettar. The staff's review of the other sections of your August 5,1968
letter is continuing. l The reporting ard/or recordheping nquirerents contained in this letter affect fewer than ten respondents; therefore, CMit clearance is not required under P.L.96-511.

4 ,

j Sincerely, h/

Velter A. Paulson, Project Panager  ;

Project Directorate - IV  !

', Divisicn cf Reactor Projects - !!!, !

IV, Y and Special Projects l

Enclosure:

As stated l

l j cc w/enclo'"re: j j See 'vt pec 1

1 i

, Mr. James C. Deddens Gulf States Utilities Conpany River Bend Nuclear Plant CC:

Troy B. Conner, Jr. , Esq. Mr. J. E. Booker -

Conne- and Wetterhahn Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C. 20006 Beaumont, TX 77704 Mr. Les England Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmeatal Affairs P. O. Box 220 P. O. Box 14690 St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge Mr. J. David McNeill. !!!

State of Louisiana Departnent of Justice Villiam G. Davir,, Esq. ,

234 Loyola Avenue Departrent of Justice -

New Orleans, Louisiana 70112 Attorney General's Office i 7434 Perkins P. cad 1 Resident Inspector Baton Rouge, Louisiana 70808 P. O. Bcx 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger '

3456 Villa Rose Drive

, Gretchen R. Rothschild-Reir.ikt- Daten Ecuse,Iouisiana 70006

Louisianians for Safe Energy. Inc.

! 2108 Brcadway Street New Orleans, Louisiana 70118-5462 President of West Feliciar.a Police Jury j Regional Administrator, Region IV P. O. Box 1921

U.S. Nuclear Regulatory Corrission St. Francisville Louisiana 70775 Office of Executive Director j for Operations Fr. Frank J. Uddo F 611 Ryan Plaza Drive, Suite 1000 Uddo ( Porter l Arlington, Texas 76011 6305 Elysian Fisids Avenue Suite 400 Philip G. Harris New Orleans, Louisiana 70122 Cajun Electric Power Coop. Inc.
10719 Airline Highway P. O. Box 15540  ;

Baton Rcuga, LA 70895 '

i i

1 i

i

REOUEST FOR ADDITIONAL INFORMATION GULF _ STATES _llTILITIES COMPANY DOCKET NO.,50-458 Please provide the following information regdrding the General Electric Company report, NEDO-31583, that was attached to the August 5, 1988 license amendrent request regarding operation with feedwater heater (s) out of service:

1. A quantitative estimate of the effect of feedwater heater (s) out of service (FWHOS) on the acoustic and flow-induceo loads en reactor vessol internals, by reference to a detail calculation. (Section 4.2 of NED0-31583).
2. A quantitative estimate of stresses and deflections induced in the reactor vessel internals most impacted by the above leads, as well as the justifi-cation of their acceptance. (Section4.2ofNEDO-31EES)
3. A detailed description sf the loading used in the stress analysis and

, fatigue usage calculation for the feedwater system piping. (Section 5.3 cf NED0-51583).

l l

i 1

1 l

l l

l 4

l i

,. -- - . _ ._ , _ _ _