ML20155G457

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/88-13 on 880830-0901.No Violations Noted
ML20155G457
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/06/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20155G460 List:
References
NUDOCS 8810170063
Download: ML20155G457 (2)


See also: IR 05000271/1988013

Text

.

'

,'

-

.

DCT o e tagg

Docket No. 50-271 License No. DPR-?8

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Macager

of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

'

Gentlemen:

Subject: Inspection Report No. 50-271/88-13

A routine safety inspection of your annual emergency preparedness exercise was

conducted by Mr. Christopher of this office, and other members of an NRC team,

on August 30 to September 1, 1988 at the Vermont Yankee Nuclear Power

Station Brattleboro, Vermont.

Mr. Christopher to you and others of your staff at the conclusion of theDIscussion

inspection.

Areas examined during this inspection included observation of the annual

exercise and follow-up of findings identified during previous emergency

preparedness inspections and exercises as described in the NRC Region I

inspection report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel and observation of the emergency exercise

by team members.

Within the scope of this inspection, no violations were observed. It was

determined that your emergency response actions were adequate to provide

protective measures for the health and safety of the public.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely

- a o p s 'y:

i ,. f?. Ov'm q

Ronald R. Bellamy, Chief

facilities Radiation Safety

and Safeguards Branch

Enclosure: NRC Region ! Inspection Report No. 50 271/88-13

.

,a

. . . c. ,,; .): i

s. . u. ..

g gue

n N

8810170063 881006

DR ADOCK O

{1

_ _ . . - - . - - __ . _ _ _ _

.

.'

i

3

Vermo'nt Yankee Nuclear 2

Power Corporation

,

cc w/ enc 1:

J. Weigand, President and Chief Executive Officer

l

J. Pelletier Plant Manager

J.deVincentIs Vice President, Yankee Atomic Electric Company

R.Capstick,LicensingEngineer,YankeeAtomicElectricCompany >

J. Gilroy, Director Vermont Public Interest Research Group, Inc. ,

C. Sterzinger Commissioner,VermontDepartmentofPublicService l

P.Agnes,AsslstantSecretaryofPublicSafety,CommonwealthofMassachusetts

PDR

Public Document

Local Public DocumentRoom LPDR) (Room)

Nuclear Safet Information enter (NSIC)

NRC Resident nspector

State of New Hampshire

State of Vermont

Commonwealth of Massachusetts

bec w/ enc 1:

Re

' M.gion I Docket

Perkins, Room (with

Management concurrences

Assistant, DRMA w/0 enc 1)

D.HaverkampI

G. Grant, SR Section Chief, DRP

H. Eichenholz,,Vermont Yankee (w/ concurrences)

SRI, Yankee

PM, NRR

V. Rooney, Technical Assistant, DRSS

R. Bores,

K. Abraham, PA0 (2)

Christ s Conk La s Bel my

10/S/88 10 /88 1/3/88 10/4/88

l

l

l

I

1

l

o

L . g .s . . .

-

..,i.-UW8 p.3; r

l

.