Informs of Decision to Exercise Discretion to Not Issue NOV & Not Propose Civil Penalty Re Insp Repts 50-277/98-08 & 50-278/98-08 Completed on 980921,IAW Provisions Provided in NRC Enforcement Policy,Section VII.B.3
ML20155F716
Person / Time
Site: Peach Bottom  
Issue date: 10/28/1998
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
50-277-98-08, 50-277-98-8, 50-278-98-08, 50-278-98-8, EA-98-410, NUDOCS 9811060097
Download: ML20155F716 (4)


See also: IR 05000277/1998008

Text

..

. _ . _

-

- .

.

..

.,,

.

t

4

October 28, 1998

EA 98-410

Mr. G. Rainey, President

PECO Nuclear

Nuclear Group Headquarters

Correspondence Control Desk

P.O. Box 195

Wayne, Pennsylvania 19087-0195

SUBJECT:

EXERCISE OF ENFORCEMENT DISCRETION RELATED TO NRC INTEGRATED

INSPECTION REPORT 50-277 & 278/98-08

Dear Mr. Rainey:

On September 21,1998, the NRC completed an inspection at the Peach Bottom Atomic

Power Station and documented the results in inspection report 50-277 & 278/98-08.

In the inspection report, the NRC reviewed a licensee-identified issue involving the potential

for bypass of the suppression pool. This issue is a violation of NRC requirements, which

could be considered for escalated enforcement and be subject to a civil penalty. However,

after consultation with the Director, Office of Enforcement and the Regional Administrator,

I have been authorized to exercise discretion to not issuc a Notice of Violation and not

propose a civil penalty in accordance with the provisions provided in NRC Enforcement

Policy, Section Vll.B.3, Violations involving Old Design Issues. This decision was made

after consideration that: (1) the violation was identified by your staff's good questioning

attitude during voluntary initiatives; (2) corrective actions were comprehensive and timely;

(3) the conditions were subtle in nature and not acly to be disclosed through routine

surveillance or quality assurance activities; ar'd (4) the violation is not reasonably linked to

current performance. The exercise of discretion acknowledges your good effort to identify

and correct subtle violations, that would not be identified by routine efforts, before the

,

degraded safety systems are called upon.

[]

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

will be placed in the NRC Public Document Room (PDR).

We appreciate your cooperation.

Sincerely,

g

p0 \\

Original Signed by:

Charles W. Hehl, Director

Division of Reactor Projects

9811060097 981028

PDR

ADOCK O NOO277

G

PDR

_

0FFICIAL RECORD COPY

IE:01

.

..

-

-. - .

. - -

-.

-

.

.

. .- - -

- . - - - .

-

.,

. = . -

1

F

G. Rainey

~

i

2

t

Docket Nos.: 50-277,50-278

License Nos.: DPR-44, DPR-56

'

cc:

J. Hagan, Vice President, Nuclear Station Support

J. Doering, Vice President, Peach Bottom Atomic Power Station

M. Warner, Plant Manager, Peach Bottom Atomic Power Station

G. D. Edwards, Chairman, Nuclear Review Board

,

R. Boyce, Director, Nuclear Quality Assurance

. A. F. Kirby, lil, External Operations - Delmarva Power & Light Co.

i

G. J. Lengyel, Manager, Experience Assessment

J. W. Durham, Sr., Senior Vice President and General Counsel

'

T. M. Messick, Manager, Joint Generation, Atlantic Electric

i

W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas

R. McLean, Power Plant Siting, Nuclear Evaluations

D. Levin, Acting Secretary of Harford. County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance

~ Mr. & Mrs. Kip Adams

Commonwealth of Pennsylvania

State of Maryland

TMI- Alert (TMfA)

J

i

l

1

i

!

$

3

i

-n

v

. . .

. ..

-

-

.-_

-

,

b

G. Rainey

3

Distribution:

Region i Docket Room (with concurrences)

H. Miller, RA/W. Axelson, DRA (1)

B. Boger, ADPR, NRR

J. Goldberg, OGC

J. Lieberman, OE (OEMAIL)

D. Holody, ORA

T. Walker, ORA

L. Manning, ORA

C.' Anderson, DRP

D. Florek, DRP

R.Junod,DRP

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

PUBLIC

Distribution: (Via E-Mail)

8. McCabe, OEDO

R. Capra, PDI-2, NRR

inspection Program Branch, NRR (IPAS)

M. Thadani, NRR

B. Buckley, NRR

R. Correia, NRR

F. Talbot, NRR

M. Campion, ORA

DOCDESK

DOCUMENT NAME: G:\\ BRANCH 4\\PB\\PBOLD.lSS

  • See previous concurrences

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

  • Rl/DRP

l * Rl/DRP

l

  • Rl/ ORA
  • OE
  • Rl/DRP l

NAME

DFlorek

CAnderson

DHolody

JLieberman

Chehl

DATE

10/ /98

10/ /98

10/

/98

10/ /98

10/ /98

.

..

. ~.

.. ..

-

-

., .

-

.

.

G. Rainey

3

Distribution:

Region i Docket Room (with concurrences)

H. Miller, RA/W. Axelson, DRA (1)

C. Anderson, DRP

D. Florek, DRP

R.Junod,DRP

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

- gg /o

PUBLIC

r,/ e

_

8*2&g

Distribution: (Via E-Mail)

B. McCabe, OEDO

R. Capra, PDI-2, NRR

Inspection Program Branch, NRR (IPAS)

M. Thadani, NRR

B. Buckley, NRR

i

R. Correia, NRR

F. Talbot, NRR

j

M. Campion, ORA

j

DOCDESK

l

l

,

l

i

DOCUMENT NAME: G:\\ BRANCH 4\\PB\\PBOLD.lSS

To receive a copy of this document, indicate in the box: "C" = Copy without

-;ttachment/encjg,sure

"E" = Copy with attachment / enclosure _"N" = No copy

_

OFFICE

Rl/p%

Rl/DRP

Rl/ORQ gE'

R,l/DRP

g

NAME

DFfreW

CAnderson cp DHolody' { JLieberman

ghetjAA#

DATE

10///!98

10(jo/98

10/M /98\\ 10/ /98

'10/$1/98

'

,.

OFFICIAL RECORD COQ

t A

h h.9 ,jg

6

% {, o

\\

'

b