Advises of Maint Team Insp Scheduled During Wks of 881114 & 28.Desire to Hold Meeting During Wk of 881017 to Present Scope of Insp Requested
ML20155F588
Person / Time
Site: Arkansas Nuclear  
Issue date: 10/05/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8810130318
Download: ML20155F588 (2)


Text

-

~

In Reply Refer To:

Dockets:

50-313 OCT - 51988 50-368 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P.O. Box 551 Little Reck, Arkansas 72203 Gentlemen:

This is to advise you of a maintenance team inspection that has been scheduled at the Arkansas Nuclear One, Units 1 & 2 site during the weeks of November 14, 1988, and Nove.nber 28, 1988.

As part of the preparation for this inspection, we desire to hold a one to two day meeting with members of your staff at the Arkansas Nuclear One site during the week of October 17, 1988.

During this meeting the scope of the inspection will be presented.

The team leader for this inspection is Mr. Dennis L. Kelley, who will be our principle contact for this inspection.

The inspection team will consist of two Region IV reactor inspectors (Messrs. Robert Vickery and Perry Stewart), a Region IV radiation specialist (Mr. Ronald Baer), a Region IV resident inspector (Mr. Tom Staker), a Region IV project inspector (Mr. Arthur Howell), and two NRC Headquarters engineering specialists (Messrs James Miller at.d Thomas Dunning).

Mr. James E. Gagliardo, the Region IV manager of the maintenance team inspection efforts will also accompany the team to assist in evaluating management control of maintenance cctivities.

The inspection team is scheduled to arrive on site on the morning of November 14, 1988, at approximately 7:30 a.m., and those who are not currently badged at the Arkansas Nuclear One site will require the appropriate site-specific training for unescorted access.

The information for unescorted access will be provided in separate correspondence.

The inspection team would like to schedule an entrance interview at approximately 9:00 a.m. on November 14, 1988. The exit interview will be scheduled on December 2,1988, at a time that is suitable to your staff and the inspection team.

The team leader will debrief your staff regarding preliminary findings and concerns on a daily basis.

N hb

  • RIV:C:0PS
  • D:DRS D:

JEGAGLIARD0/lmd JLMilhoan LJhalan

/ /88

/ /88 10 / f /88 f

  • previously concurred 8810130310 001005 I,0 PDR ADOCK 05000313 0

PNV

i Arkansas Power & Light Company If you have any questions regarding this team inspection, please contact Messrs. Dennis Kelley (817-860-8289) or James Gagliardo (817-860-8141).

Sincerely, or t.rt,21 Sir.ned By A. 8. ne sch L. J. Callan Director Division of Reactor Projects CC:

Arkansas Nuclear One ATTN:

J. M. Levine, Director Site Nuclear Operations P.O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec to DMB (IE01) bec di*trib, by RIV:

RRI R. D. Martin, RA RPB-DRSS Section Chief (DRP/A)

Lisa Shea, RM/ALF RIV File DRP MIS System RSTS Operator Project Engineer, DRP/A C. Harbuck NRR Project Manager DRS J. E. Gagliardo D. Kelley J. E. Gagliardo Reading File t