Text
.
![gorovy'o
+
UNITED STATES g
g NUCLEAR REGULATORY COMMISSION
- c c WASHINGTON, D. C. 20556
%,...../
May 31, 1988 CHAIRMAN t
1 4
The Honorable Morris K. Udall, Chairman Subcommittee on Energy and tne Environment Ccemittee on Interior and Insular Affairs United States House of Representa tives Washington, D.C.
20515
Dear Mr. Chairman:
In accordance with the statutory obligation to respond to recommendations made by the General Accounting Office (GA0) within 60 days of their publication, we hereby submit our responses to the GA0 recommendations in its report entitled "Action Needed To Ensure That Utilitics Monitor and Repair Pipe Damage."
The GA0 initiated its survey following the pipe rupture event at Surry Unit 2 in December 1986.
As indicated in the report, the U.S. Nuclear Regulatory Commission (NRC) responded rapialy to the Surry event and implemented a plan of action to address this issue industrywide.
Licensee inspections for erosion / corrosion in single phase pipe systems are either completed or are scheduled for the next refueling outage at all plants.
This program was developed by industry and approved by the NRC.
A similar approach that will provide uniform results from existing utility two-phase piping inspection programs has been initiated.
The NRC staff will inspect selected plants by October 1988 to determine the adequacy of individual plant programs.
If industry programs are not adequate, the NRC will implement additional regulatory reouirements.
Specific responses to the GA0 recommendations are enclosed.
Sincerely, b&/.
s Zeh,j[.)*
ando W.
Enclosure:
Responses to GAO Recommendations cc:
Rep. Manuel Lujan, Jr.