Forwards Insp Repts 50-445/88-33 & 50-446/88-29 on 880330- 0429.Team Reviewed Criteria & Methodologies Used in Corrective Action Program Design Validation of Cable Tray Hangers,Conduit Supports & HVAC
ML20155F406
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/06/1988
From: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20155F409 List:
References
NUDOCS 8806160381
Download: ML20155F406 (4)


See also: IR 05000445/1988033

Text

--.

-

.

'q

UNITED STATES

'g

l

E'

NUCLEAR REGULATORY COMMISSION

g

ti

.p

WASHINGTON, D. C. 20555

k....o#

June 6, 1988

+

Docket Nos. 50-445

and 50-446

TV Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street,1Jck Box 81

Dallas, TX 75201

Gentlemen:

This letter transmits the results of the subject inspection related to the

Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, conducted by the

NRC's Office of Special Projects during the period from March 30 through

April 29, 1988.

Ice inspection team, comprised of NRC staff personnel and

contractors. performed the inspection at the offices of Ebasco Services

Incorporates (New Ycrk, NY) and Impell Corporation (CPSES site).

The team

reviewed the criter b and methodologies used in your Corrective Action Program

design vai!dativi of cable tray hangers, conduit supports, and heating,

ventilation, and air-conditioning (HVAC) ducting and supports.

In addition,

the team inst,ected the basis used to develop the root cause assessment

provided in your letter to the NRC dated March 16, 1988 (TXX-88254).

This inspection complements the NRC's previous inspection of Ebasco's

design criteria and analytical methodologies documented in Irspection Report

50-445/87-39, 50-446/87-30.

The enclosed report provides the results of

a followup inspection of the open items discussed in the previous inspection

report and discusses the team's review of the criteria and methodologies used

by Impell in their scope of work for cable tray hanger design validation. As

a result of this inspection, many open items previously identified have been

adequately resolved. The status of all open items identified in the previous

inspection report is provided in Section 1 of the enclosed report.

Our final

conclusions will be based on the inspections conducted to date and on an

inspection of the application and use of the cable tray, conduit support, and

HVAC design criteria and methodologies. The results of these inspections and

of reviews of any remaining open items which are closed out henceforth will be

addressed in the respective supplement to the CPSES Safety Evaluation Report

pertaining to that particular Corrective Action Program design discipline.

In accordance with 10 CFR 2.790(a), a copy of t:11s letter and its enclosure

will be placed in the NRC Public Document Room.

Sincerely,

Christopher . Grimes, Director

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report 50-445/87-39, 50-446/87-30

cc:

See next page

8806160381 880606

PDR

ADOCK 05000445'

G

PDR

,

.

.

,

~

W KECO

[k

\\o

a

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

e

e

,

b

h.

.C

WASHINGTON, D. C. 20555

k . . . . . ,o#

June 6, 1988

Docket Nos. 50-445

and 50-446

TV Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, TX 75201

Gentlemen:

This letter transmits the results of me subject inspection related to the

Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, conducted by the

NRC's Office of Special Projects during the period from March 30 through

April 29, 1988. The inspection team, comprised of NRC staff personnel and

contractors, performed the inspection at the offices of Ebasco Services

Incorporated (New York, NY) and Impell Corporation (CPSES site). The team

reviewed the criteria and methodologies used in your Corrective Action Program

design validation of cable tray hangers, conduit supports, and Feating,

ventilation, and air-conditioning (HVAC) ducting and supports.

In addition,

the team inspected the basis used to develop the root cause assessment

provided in your letter to the NRC dated March 16, 1988 (TXX-88254).

This inspection complements the NRC's previous inspection of Ebasco's

design criteria and analytical methodologies documented in Inspection Report

50-445/87-39, 50-446/87-30.

The enclosed report provides the results of

a followup inspection of the open items discussed in the previous inspection

report and discusses the team's review of the criteria and methodologies used

by Impell in their scope of work for cable tray hanger design validation. As

a resPlt of this inspection, many open items previously identified have been

acequately resolved. The status of all open items identified in the previous

inspection report is provided in Section 1 of the enclosed report. Our final

conclusions will be based on the inspections conducted to date and on an

inspection of the application and use of the cable tray, conduit support, and

)

HVAC design criteria and methodologies.

The results of these inspections and

of reviews of any remaining open items which are closed out henceforth will be

addressed in the respective supplement to the CPSES Safety Evaluation Report

pertaining to that particular Corrective Action Program design discipline.

j

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Sincerely,

C

raus

Christopher . Grimes, Director

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report 50-445/87-39,50-446/87-30

cc: See next page

4

.

.

O

W. G. Counsil

Comanche Peak Steam Electric Station

Texas Utilities Electric Company

Units I and 2

cc:

Jack R. Newman, Esq.

Asst. Director for.Inspec. Programs

Newman & Holtzinger, P.C.

Comanche Peak Project Division

Suite 1000

U.S. Nuclear Regulatory Commission

1615 L Street, N.W.

P. O. Box 1029

Washington

D.C. 20036

Granbury, Texas 76048

Robert A. Wooldridge, Esq.

Regional Administrator, Region IV

Worsham, Forsythe, Sampels &

V.S. Nuclear Regulatory Comission

,

Wooldridge

611 Ryan Plaza Drive, Suite 1000

2001 Bryan Tower, Suite 2500

Arlington, Texas 76011

t

Dallas, Texas 75201

Lanny A. Sinkin

Mr. Homer C. Schmidt

Christic Institute

Director of Nuclear Services

1324 North Capitol Street

Texas Utilities Electric Company

Washington, D.C.

20002

Skyway Tower

400 North Olive Street, L.B. 81

Ms. Billie Pirner Garde, Esq.

Dallas, Texas 75201

Government Accountability Project

Midwest Office

Mr. R. W. Ackley

104 East Wisconsin Avenue

Stone & Webster

Appleton, Wisconsin 54911

Comanche Peak Steam Electric Station

P. 0. Box 1002

David R. Pigott, Esq.

Glen Rose, Texas

76043

Orrick, Herrington & Sutcliffe

600 Montgomery Street

Mr. J. L. Vota

San Francisco, California 94111

Westinghouse Electric Corporation

P. O. Box 355

Anthony Z. Roisman, Esq.

Pittsburgh, Pennsylvania

15230

Suite 600

1401 New York Avenue, NW

Susan M. Theisen

Washington, D.C. 20005

Assistarit Attorney General

Environmental Protection Division

Robert Jablon

P. 0. Box 12548, Capitol Station

Bonnie S. Blair

Austin, Texas 78711-1548

Spiegel & McDiarmid

1350 New York Avenue, NW

Mrs. Juanita Ellis, President

Washington, D.C. 20005-4798

Citizens Association for Sound Energy

'

1426 South Polk

George A. Parker, Chairman

Dallas, Texas 75224

Public Utility Committee

Senior Citizens Alliance Of

Ms. Nancy H. Williams

Tarrant County, Inc.

CYGNA Energy Services

6048 konder Drive

2121 N. California Blvd., Suite 390

Fort Worth, Texas

76133

Walnut Creek, CA 94596

.

.-

.

.

_.

_

._ _ . _.

_ _

._

.

.-.

.

.

,

,

.

2-

Comanche Peak Electric Station

W. G. Counsil

-

- Texas Utilities. Electric Company

Units 1 and 2

cc:

Joseph F. Fulbright

Fulbright & Jaworski

1301 McKinney Street

Houston, Texas 77010

Roger D. Walker

- Manager, Nuclear Licensing

,

Texas Utilities Electric Company

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Mr. Jack Redding

c/o Bethesda Licensing

Texas Utilities Electric Company

3 Metro Center, Suite 610

Bethesda, Maryland 20814

William A. Burchette, Esq.

Counsel for Tex-La Electric Cooperative

of. Texas

Heron, Burchette, Ruckert & Rothwell

Suite 700

1025 Thomas Jefferson Street, NW

Washington, D.C.

20007

GDS ASSOCIATES, INC.

Suite 720

1850' Parkway Place

Marietta, Georgia 30067-8237

Administrative Judge Peter Bloch

U.S. Nuclear Regulatory Commission

Washington, D.C.

20555

l

Elizabeth B. Johnson

)

Administrative Judge

-

Oak Ridge National Laboratory

'

P. O. Box X Building 3500

Oak Ridge. Tennessee 37830

Dr. Kenneth A. McCollom

1107 West Knapp

,

Stillwater, Oklahoma 74075

Dr. Walter H. Jordan

'

881 West Cuter Drive

Oak Ridge, TN 37830

l

gu

y-

my-6-,-

- - - .i

,e-

%-

-

y

-.~,y

-eytr

ir4--ee

7-e

yy-

e

_+-7y

y

,

--m

-

,--yeg.

-

g,iwyg-.q

- yy

-+-M<-'y;-mx+a-.y

TV Electric

June 6, 1988

'

Inspection Report 50-445/87-39;

50-446/87-30

)

sDistribution

iDocketiFile"/ " "~ "'

~

~~ ~ ^ ~

NRC PDR

LPDR

CPPD Reading (HQ)

OSP Reading

RPB, RIV

RIV Docket File

J. Taylor

.

S. Ebneter/J. Axelrad

C. I. Grimes

P. F. McKee

J. H. Wilson

,

J. Lyons

M. Malloy

CPPD-LA

J. Moore, 0GC

J. Gilliland, RIV

F. Miraglia

E. Jordan

J. Partlow

B. Hayes

i'l :05P :P:cvv2 ; ni .

0FC :CPPD:05P

AD:


:--------4

-:--- PPD'OSP 3D:l, f

.

4

~-~~----:-----------

.ch. IPM!""Ges n

.

" " * ~ " " *


:--

~~"

NAME :DTerao:cb

JLY

.G

.

.

.-

--~~-:------------:------------:1TLn~-

DATE:5/488

5//7/88
5/$)/bb

! "h"L k(" f """""" l """ '~ ~ ~ l - ~ ~ ~ ~ "-

f

'

0FFICIAL RECORD COPY

_-

_

--