Informs That Original Grant of Relief from Hydrostatic Testing May Be Applied to Planned Replacement of Reducer & Addl Relief from NRC Not Required
ML20155F270
Person / Time
Site: McGuire, Mcguire  
Issue date: 10/05/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TAC-64644, TAC-64645, NUDOCS 8810130205
Download: ML20155F270 (3)


Text

7 7

11 l-L, Duke Itcer Company Htt B Taur PO Box 33198 Vice President

. Charlotte, N C 28242 Nuclear Production (704)373-4531 DUKEPOWER October 5, 1988 U.S. Nuclear Regulatory Compirsion Document Control. Desk Washington, DC 20555

Subject:

McGuire Nuclear Station Docket Nos. 50-369, -370 ASME Section II Testing Requirements Gentlemen:

By letter dated February 9,1987, Duke Power Company submitted a request for relief, pursuant to 10 CFR 50.55 a(g)(5)(iii), from ASME Code Section XI Hydrostatic Testing requirements for portions of modifications on McGuire's Nuclear Service Water (RN) systems.

Subsequently, by NRC letter dated July 12, 1988, from Mr. D.E. Matthews, NRC granted relief from the hydrostatic test requirements.

During the 1988 Unit 2 refueling outage at McGuire, a 3 by 2 inch reducer was replaced on the RN system as part of Nuclear Station Modification (NSM) MG-11888.

The veld to install this reducer was one of the items for which relief from hydrostatic testing was sought and granted as mentioned above.

On December 27, 1987, Duke's Quality Assurance (QA) department discovered during an audit of the manufacturer of the reducer that sufficient documentation did not exist to support compliance with ASME QA program guidelines. Therefore, Duke began investigating the situation to determine if and what materials from this company have been installed at McGuire and any operability concerns that may exist.

Materials already identified have been tagged to prevent their being issued or used.

The 3 by 2 reducer was installed prior to it being identified.

As a result of this finding, McGuire is replacing the 3 by 2 inch reducer mentioned above for which relief from ASME testing has been granted by NRC.

Duke plans to replace the reducer during the Unit 1 1988 refueling outage, and will replace the reducer using the same materials, procedures, alternative testing, and qualified reducer, thereby repeating the original installation and testing as specified in Duke's initial relief request and NRC's subsequent approval (TACS 64644 and 64645).

8810130205 881005 PDR ADOCK 0500 p

  1. fp

Document Control Desk October 5, 1988 Page 2 Therefore, as discussed by D.

Hood of NRC and S.

LeRoy of Duke during a September 15, 1988 telephone conversation, the original grant of relief from hydrostatic testing may be applied to the planned replacement of the reducer and additional relief from the NRC is not required.

Sheuld there be any questions concerning this matter, contact S.E.

LeRoy at (704) 373-6233 Very truly yours, A

Hal B. Tucker SEL/343/n.mf Attachment xc:

Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, GA 30323 Mr. Darl Hood U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555 Mr. P.K. Van Doorn NRC Resident Inspector McGuire Nuclear Station f

.. ~ _

I..,

l'

[.

~ Document Control Desk October 5, 1988 Page 3' bxc: P.M. Abraham EC2-827 D.R. Bradshaw WC-2569 H.E. Edwards EC-724 R.C. Futrell WC-2526 S.A. Gewehr WC-28 R.L. Gill WC-28 R.M. Glover (CNS)

G.W. Hallman WC-2435 C.L'.

Harlin (ONS)

A.J. Hogge EC-1272 A.R. Hollins SSD-North S.S. Kilborn W

E.O. McCraw TMNS)

P.B..Nardoci WC-28 R.W. Rider (NNS)