Carolina Power & Light Company MAR 171986 SERIAL: NLS-86-059 EM M 394-SS es m n ay m PDR h
O
~p0CKUED
.usstc
'I Mr. John G. Davis, Director Office of Nuclear Material MAR 211986
- 1 Safety and Safeguards i
United States Nuclear Regulatory Commission
{
wuss Washington, DC 20555 MAIL SECTON cocacitt m g
SHEARON HARRIS NUCLEAR POWER PLANT D
UNIT NO.1 - DOCKET NO. 70-2997 O
6 SPECIAL NUCLEAR MATERIALS LICENSE NO. SNM-193
Dear Mr. Davis:
- Carolina Power & Light Company requests that Special Nuclear Materials License No. 70-2997 for the Shearon Harris Nuclear Power Plant be revised. The requested revisions and justifications are provided in Attachment 1. provides a revised page to SNM license application as requested by your staff.
If you have any questions please contact Mr. Gregg A. Sinders at 919-836-8168.
Yours very t,1y, A. B. Cutter - ibresident Nuclear Engineering & Licensing ABC/ GAS /ccc (3373 GAS)
Attachments cc:
Mr. B. C. Buckley (NRC)
Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)
Mr. John D. Runkle Dr. J. Nelson Grace (NRC-RII)
Dr. Richard D. Wilson Mr. Travis Payne (KUDZU)
Mr. G. O. Bright (ASLB)
Mr. Daniet F. Read (CHANGE /ELP)
Dr. J. H. Carpenter (ASLB)
Mr. N. Ketchlach (NRC-NMSS)
Mr. J. L. Kelley (ASLB)
Wake County Public Library Mr. H. A. Cole M O '{ rs Jwi B604210418 B60317
^~
PDR ADOCK 07002997 C
PDR 411 rayetteville Street
- P. O. Box 1551
- Raleigh, N. C. 27602
ATTACHMENT 1 Requested Revisions to Special Nuclear Materials License 70-2997 1)
Item 11 of the Special Nuclear Materials (SNM) license states " Procedures, and changes thereto, for the control and handling of nuclear fuel shall include the review and approval of. the Reactor Operator and Manager, Technical Support."
CP&L letter dated October 10,1935 (from A. B. Cutter to Mr. John G. Davis) stated that "the Manager, Operations is responsible for approval of fuel handling procedures.
The -Manager, Technical Support will review these procedures."
Therefore, CP&L requests that item 11 of the SNM license be revised to state
" Procedures, and changes thereto, for control and handling of nuclear fuel shall
. include the review by the Manager, Technical Support and the approval of the Operations Manager."
2)
CP&L requests that a subitem c be added under item 14 of the SNM license to state "the minimum qualifications for the team leader responsible for criticality safety and for fuel assembly handling shall be in accordance with the following:
c) Currently licensed Reactor Operator or Senior Reactor Operator for the Harris facility." This change is justified because a NRC issued Reactor Operator or Senior Reactor Operator license authorizes the individual to supervise fuel handling and be responsible for criticality safety.
1 (3373 GAS /CCC)
ATTACilMENT 2 Page 12 of SNM License Application, Revision 2 (Revision I was transmitted to the NRC by letter dated September 17, l984 from A. B. Cutter to Mr. John G. Davis)
(337 3 GAS /ccc )
SNM Amendm:nt 2 February 1986 4'
Alpha scintillation survey meters, 0-500K cpm used for measurement of alpha surface contamination.
small amounts of radioactive waste, that may be generated from tests used
'to determine the presence of radioactive contamination will be collected, properly packaged, and temporarily stored in a controlled area in the Radiation Control facility located in the Waste Processing Building until it is shipped to'a licensed radioactive waste disposal facility for
' burial. When construction has been completed, radioactive waste generated from these tests will be stored in the designed radioactive waste storage area of the Waste Processing Building until it is shipped to a licensed radioactive waste disposal facility.
2.2 Nuclear Criticality Safety The movement and inspection of new fuel sasemblies will be a team effort. The team leader will*bs* resp 6ns'ible_for criticality safety and direction of new fuel handli,ng.and.yillrideet"bne cif the following minimum qualifications:
^
a)
Previously held an NRC R0 License at another facility and has had direct fuel handling experience.
b)
Individual (s) has been in responsible position in charge of new fuel receipt and handling at another facility.
c)
Currently NRC licensed RO or SRO for the Shearon Harris Nuclear I
Power Plant.
I The individual responsible for criticality safety will be trained on SHNPP fuel handling procedures. The Manager-Operations is responsible for the approval of. fuel. handling procedures. ~The Manager-Technical Support will review these procedures.
The team will also includ,e,aq individual qualified as a radiation control technician. This iiidivi' dual will be responsible for:
a)
Survey of the transport vehicle prior to removal of new fuel shipping containers'andpe'rio'dic' surveys prior to and during the removal, inspection and mo,vemene of.the new fuel.
b)
Establishing a radiation control area surrounding the fuel inspection area.
c)
Dosimetry for the work party doing inspection and fuel movement to the storage area.
d)
Opet a'un us a low volume airborne radiation monitor during load inspection and covement.
e)
Smears of new fuel assemblies to determine the presence and quantity of tramp uranium.
The team will also include additional personnel as required to complete fuel inspection and operate cranes and other equipment.
A general outline of the tasks to be completed during the inspection and movement of the first core of new fuel assemblies is provided below: (8540NLU/1js)
mz-occxtr :so.
74-.3997 coman. m.
2 44;s'2/
~
nan oF me.
228//7/34 osu ucvo.-
03/,pi/8C, ~
reuF_ /
'/
raa FCAF_
LPDR-W..
ISE REF.
mun-smcuinns /
l'CTC OTHER j ' SCS.1PTION:
M sberfin b GL lO 3/it/K4 wirm a&
J l
~