Forwards Enforcement Conference Rept 50-271/86-05 on 860319.Conference Convened to Discuss Circumstances Surrounding Failure to Have Standby Liquid Control Sys Operable for Core Operating Cycle XI
ML20155F043
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/15/1986
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20155F047 List:
References
NUDOCS 8604210129
Download: ML20155F043 (2)


See also: IR 05000271/1986005

Text

,

.-

--

--

o

.

.

.

APR 15115

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. yarren P. Murphy

Vice: President and Manager of Operations

RD 5, Box 169

Ferry Road.

Brattleboro, Vermont 05301

-

Gentlemen:

Subject:

Enforcement Conference for Inspection Report No. 50-271/86-05

i

I

l

On March 19, 1986,.-

nforcement Conference was held at the NRC Region I Office,

King of Prussia,.'

,sylvania, to discuss the findings of Special Inspection No.

50-271/86-05.

The meeting was attended by yourself and members of your staff and

l

Mr. J. Allan, Deputy Regional Administrator, myself and other members of the Region

I staff.

At the meeting, we discussed the circumstances surrounding the failure

to have the Standby Liquid Control System Operable for Core Operating Cycle XI

!

(July 1984 to September 1985).

Associated concerns were also discussed regarding

i

an unapproved change in the squib firing circuit, and the failure to detect a

manufacturing error on the squib primer chambers during preservice checks and tests.

A summary of our discussions and a listing of attendees are provided in the meeting

report enclosed with this letter.

No reply to this letter is required.

You will be notified of our decision regard-

ing enforcement action by separate correspondence.

Your cooperation with us in this matter is appreciated.

Sincerely, Crisiaal Signed gg

..

Richard W. Starostecki, Director

DivisionofReactorProjects

Enclosure:

Enforcement Confere ce Inspection Report No. 50-271/86-05

cc w/ enc 1:

Mr. R. W. Capstick, Licensing Engineer

-

Mr. J. Gary Weigand, President and Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

State of Vermont

NRC Resident Inspector

042gy 7

i

G

d5/

- _ _ - _ _ _ _

_ _ . .

61

o

,

e.

.

Vermont Yankee Nuclear Power

2

APR 15 W

.

Corporation

bec w/ encl:

'

.

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encls)

DRP Section Chief

DRP Branch Chief

M. McBride, SRI, Pilgrim

H.' Eichenholz, SRI, Yankee

V. Rooney, LPM,'NRR

J. Shedlosky, SRI, Nillstone 3

l

RI:DRP

D

R --

P

Raymond/meo

-T+ipp= r% W

zinger

cki

(J/ lif

4/4/86

tcsas s

'

0FFICIAL RECORD COPY

.

, , _ _ , , _ _ , , , - , ,

p

~"

"

"

~

Y