ML20155E990
| ML20155E990 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 04/14/1986 |
| From: | Kister H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil Public Service Enterprise Group |
| Shared Package | |
| ML20155E994 | List: |
| References | |
| NUDOCS 8604210085 | |
| Download: ML20155E990 (2) | |
See also: IR 05000354/1986014
Text
_,
. .
.
APR 141985
Docket No. 50-354
Public Service Electric & Gas Company
ATTN: Mr. C. A. McNeill, Jr.
Vice President - Nuclear
Post Office Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Inspection No. 50-354/86-14
This letter refers to the special inspection of your SAFETEAM program by
Messrs. J. Strosnider and E. Conner conducted from February 3 to 7,1986 at the
Hope Creek Nuclear Generating Station, Hancocks Bridge, New Jersey. The in-
spection consisted of observation of the program, document reviews and in-
terviews. The findings w,
e discussed with Mr. R. Salvesen, Mr. O. Lyon and
other members of your staff on February 7,1986.
From an NRC perspective SAFETEAM '.s essentially an extension of the overall
quality assurance effort and the approach used in this inspection was to
determine if SAFETEAM, as a Public Service Electric and Gas Company sponsored
program, is effective in identifying and resolving employee concerns.
The inspection report concludes that the Safeteam process at Hope Creek has
satisfactorily identified and resolved employee concerns during the final
stages of plant construction and preoperational testing.
It is believed that
the program has had a positive effect on overall plant quality and safety.
Areas where improvement could be made involve determination of root cause and
generic implications, and evaluation of reportability to NRC.
It should be
noted that the SAFETEAM program is not an NRC requirement. Nonetheless, NRC
reporting requirements are still applicable and must be satisfied.
Your cooperation with us is appreciated.
Sincerely,
t
Original Signed By
H.B. Kister, Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosure: NRC Inspection Report No. 50-354/86-14
.
%k
0
0FFICIAL RECORD COPY
IR HC 86-14 - 0001.0.0
04/10/86 T m /
,
1
3
- -
- - - - - - - - -
- - - -
-
--
- - - -
-.
. -
.
.
Public Service Electric
2
and Gas Company
cc w/ encl:
P. Laudrieu, Vice President - Engineering (Newark)
R. Salvesen, General Manager, Hope Creek Operations
A. Giardino, Manager, Station Quality Assurance
R. Mitti, General Manager, Nuclear Assurance and Regulation
A. Pietrofitta, General Manager, Power Production Engineering, Atlantic
Electric
L. Reiter, General Manager - Licensing and Reliability
R. Green, Bureau of Radiation Protection
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
,
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
J. Strosnider, Section Chief, DRP
E. Conner, Project Engineer, DRP
R. Fuhrmeister, Reactor Engineer, DRP
A. Shropshire, Allegation Coordinator, RI
!
D. 'Jagner, Project Manager, NRR
l
l
RI:DRP
RI:DRP
I: RP
Conner /bc
Strosnider
Kist r
4/81/86
4/l//86
4/
86
0FFICIAL RECORD COPY
IR HC 86-14 - 0001.1.0
i
04/10/86 IEo)