Dave Mor:y.
Southem Nucle:r Vice l' resident OperatiIg Compmy i
j Farley Project P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 SOUTHERN october 30, 1998 Energy toServeYourWorld" i
Docket Nos.: 50-348 10 CFR 50.54(f) 50-364 U.S. Nuclear Regulatory Commission -
ATTN: Document Control Desk Washington, D.C. 20555-0001
-Joseph M. Farley Nuclear Plant Response To Generic Letter 98-02, " Loss Of Reactor Coolant Inve ntory And Associated Potential For Los's Of Emergency Mitigation Functions While in A Shutdown Condition" q
Ladies and Gentlemen:
1 On May 28,1998, the NRC issued Generic Letter (GL) 98-02 to request information necessary to assess susceptibility to a conimon-cause failure of the emergency core cooling system (ECCS) as a result of reactor coolant system (RCS) drain down.
' Specifically, licensees were required to evaluate their susceptibility to an event similar to
.that which occurred at Wolf Creek on September 17,1994. During this event a portion of
/f the RCS inventory'was inadvertently pumped to the RWST lowering the RCS level and
/2 increasing the RWST temperature such that flashing may have occurred in the common
.ECCS suction header. Had an ECCS actuation occurred, steam binding could have occurred in all of the ECCS pumps. This event was also the subject ofInformation Notice (IN) 95-03 dated January 12,1995 and IN 95-03, Supplement 1, dated March 25, i
~1996.
/
O'/
Southern Nuclear Operating Company has conducted a review of the Farley Nuclear Plant (FNP)
ECCS piping design and determined that certain design features can render the system susceptible to common-cause failure as a result of events similar to the Wolf Creek event. In accordance with Required Information Item 2 of GL 98-02, a description of the programs, procedures, and controls in place to preclude such an event is available at FNP for review.
1 l
This letter contains no formal NRC commitments and nothing stated herein should be considered l-as a license commitment.
f L
. r ^. 0 ( G 9811050099 981030 F
l PDR ADOCK 05000348 R
P PDR[
J t
. __~.
4 d
4 U.S. Nuclear Regulatory Commission Page 2
~
Mr. Dave Morey states that he is a Vice President of Southern Nuclear Operating Company (Southern Nuclear) and is authorized to execute this oath on behalf of Southern Nuclear and that, to the best of his knowledge and belief, the facts set forth in this letter are true.
Respectfully submitted, SOUTHERN N'UCLEAR OPERATING COMPANY V'I Wl#
Dave Morey Sworn to andsubscribed be >re me this 30 dayof b 1998 1nwAo.
& 9)nd
'~(
Notary Publib. U My Commission Expires: N
[ NO/
t EWC/ cit:gl9802ra. doc i
cc: Mr. L. A. Reyes, Region II Administrator l
Mr. J.1. Zimmerman, NRR Project Manager j
Mr. T. P. Johnson, Plant Sr. Resident Inspector l
i 4
\\
i l
\\
l 1
1 i
.)