_. _ _ _ _ _ _ _ _ _ _ _ _. _
. ei 0
.GU73 P(rAOf CG%Fy 133 Piedmor.t Avenue A!!anta, Gec<ge 3030d Tetepocne 404 526 6526 Melng Mdress Fbst Of f.ce Box 4545 Atlanta, Georg;a 30302 R. P. Mcdonald the southern eWirc Sy%e Executxe Vice Pres dent nueear operat: ens SL-4760 1857C X7GJ17-H200 June 7, 1988 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Hashington, D. C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS Gentlemen:
Enclosed are updated listings of outstanding licensing requests for Plant Hatch.
Enclosure 1,
tabulated chronologically by Georgia Power Company's submittal date, lists items which are ready for closure. prioritizes the four most significant outstanding submittals in terms of value to Georgia Power Company. is a listing of those items requiring submittal of additional information by Georgia Power.
Georgia Power Company is prepared to promptly discuss and provide any additional information which the NRC staff may desire in its review of the subject issues.
Sincerely, Q
f b
y l
R. P. McDonal l
Executive Vice President, l
Nuclear Operations l
REB /lc
Enclosures:
1.
Outstanding Licensing Submittals Requiring NRC Action 2.
Outstanding Licensing Submittals Prioritized List q
i 3.
Outstanding Licensing Submittals Requiring Additional Information l
(
c:
(see next page) i l
8806160077 880607 1.
PDR ADOCK 05000321 L
P ricri
L -c
/ ;
Georgia Power A l
U. S. Nuclear Regulatory Commission June 7, 1988 l
Page.Two c:
Georaia Power Comoany Mr. J. T. Beckham, Jr., Vice President - Plant Hatch Mr. L. T. Gucwa, Manager Nuclear Safety and Licensing GO-NORMS i.-
U. S. Nuclear Reaulatory Commission. Washington. D. C.
l Mr. L. P. Crocker, Licensing Project Manager - Hatch l
l U. S. Nuclear Regulatory Commission. Reaion II l
Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch I
i 1857C
m
~
Georgia Power d ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTION LETTER HATCH D6TE UXLI SUBJECT Key 0-APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDE 0 SINCE LAST REPORT 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 09/09/86 321,366 C
CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE - ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOHN PANELS FROM SAID PANELS i
12/21/87 321 C
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
MAIN STEAM ISOLATION VALVE SURVEILLANCE TESTING l
l 1857C El-1 06/07/88 SL-4760
Georgia Power d ENCLOSURE 1 (Continued)
OUTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTION LETTER HATCH DAIE UHil SUBJECT 02/24/88 321,366 REVISED INSERVICE INSPECTION AND TESTING PROGRAM 05/06/88 321,366 N
REQUEST TO REVISE TECHNICAL SPECIFICATIONS -
CORPORATE AND ONSITE ORGANIZATION 05/13/88 321,366 N
REQUEST TO REVISE TECHNICAL SPECIFICATIONS -
MSIV CLOSURE TIME REQUIREMENTS 05/13/88 321,366 N
REQUEST TO REVISE TECHNICAL SPECIFICATIONS -
SUPPPESSION POOL TEMPERATURE LIMITS
-06/07/88 321,366 N
REQUEST TO REVISE TECHNICAL SPECIFICATIONS -
ORGANIZATIONAL POSITIONS i
t 1857C El-2 06/07/88 SL-4760
Georgia Power d ENCLOSURE 2 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS PRIORITIZED LIST REASON SUBJECT FOR PRIORITY 1.
To Preclude Potential PROPOSED CHANGE TO TECHNICAL Shutdown Due to high SPECIFICATIONS - SUPPRESSION POOL river / torus water TEMPERATURE LIMITS temperatures 2.
Future Generation PROPOSED LICENSE EXTENSIONS TO Needs TO 40 YEARS 3.
Improved Testing REVISED INSERVICE INSPECTION AND TESTING Requirements PROGRAM 4.
Reduced Surveillance PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS l
Requirements EQCSLIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 5.
Improved surveillance PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS requirements MSIV CLOSURE TIME REQUIREMENTS 6.
Improved process for PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS future organization CORPORATE AND ONSITE ORGANIZATION changes Note:
Submittal dates are listed on Enclosure 1.
l 1857C E2-1 06/07/88 SL-4760 l
r.
~
Georgia Power 1 ENCLOSURE 3
. PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS RE0VIRING ADDITIONAL INFORMATI0ti LETTER HATCH D31E URII SUBJECT 07/17/86 321,366 REQUEST FOR ADDITIONAL INFORMATION REGAReliiG TECHNICAL SPECIFICATION AMENDMENT TO GASE0US EFFLUENT RELEASE POINTS 05/25/88 321,366 N
VERBAL REQUEST FOR ADDITIONAL INFORMATION REGARDING RPS SURVEILLANCE TECHNICAL SPECIFICATIONS PROPOSED CHANGE 1857C E3-1 06/07/88 SL-4760