Forwards Insp Repts 50-498/88-55 & 50-499/88-55 on 880801-31.No Violations or Deviations Noted
ML20155E267
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/06/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20155E271 List:
References
NUDOCS 8810120210
Download: ML20155E267 (3)


See also: IR 05000498/1988055

Text

s ,

t- (3

,

OLT 6 1988

In Reply Refer To:

Dockets: 50-498/88-55

50-499/88-55

Houston Lighting & Power Company

ATTNr J. H. Goldberg, Groap Vice

Pres (dent, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Bess, D. L. Garrisen,

J. I. Tapia, and D. M. Hunnicutt of this office during the period August 1-31,

1988, of activities authorized by NRC Operating License NPF-76 and Construction

Permit CPPR-129, for the South Texas Project, Units 1 and 2, and to the

discussion of our findings with Mr. J. T. Westertreter and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included plant status, licensee actions on

previous inspection findings, review of licensee action on reported

events (LERs), operational safety verificatior , ESF system walkdown,

maintenance observations, surveillance observations, loose part monitoring

system test - Unit 2. remote reactor shutdown test - Unit 2, control rod system

test - Unit 2, fuel handling building inspection - Unit 2, QA program (test and

experiments) review - Unit 2, design changes and modification - Unit 2,

preoperational test witnessing - Unit 2, and allegation follow-up - Unit 2.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

0:tiv i W d S):-

A.B. BEACH

L. J. Callan, Director

Reactor Projects

Enclosu re, (see next page) p

  • RPB/D *RPB/D *RPB/D *RPB/D *AC 4:RPB/D 0,:hBAM

JEBess DLGarrison JITapia DMHunnicutt RIreland EHoller LKallan

/ /88 / /88 / /88 / /88 / /88 / /88 l0/T /88

  • Previously concurred

SS10120210 881006

PDR ADOCK O'J OOO4%

N '

O FDC ' I

. _ _ _ - _ _ _ _ _ __-

, ,

I 4

. .

Houston Lighting & Power Company -2-

Enclosure:

Appendix - NRC Inspection Report

50-498/88-55

50-499/88-55

cc w/ enclosure:

Houston Lighting & Power Company

ATIN: M. A. McBurnett, Manager

Operations Support Licensing

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN: Vice President

GeraldE.Vaughnlont

Nuclear Operat

P.O. Box 1700

Houston, Texas 77001

Houston Lighting & Power Company

ATTH: S. L. Rosen, General Manager

Operations Support

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATIN: J. T. Westermeier, General Manager

South Texas Project

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATIN: R. W. Chewning, Chairman

Nuclear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City Public Service Board

ATIN: R. J. Costello/M. T. Hardt

P.O. Box 1771 ,

San Antonio, Texas 78296

9

_ _ _ _ _ _ . ___ _

, _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

'

, ,

1. g

.

Houston Lighting & Power Company -3-

l

City of Austin Electric Utility

ATIN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 78704

Licensing Representative

Houston Lighting & Power Compary

Suite 610

Three Metro Center

Bethesda, Maryland 20814

J. R. Newman, Esquire

Newman & Holtzinger, P.C.

1615 1. Street, N.W.

Washington, DC 20036

Texas Radiation Control Program Director

bec to DMB: IE01

bec to distrib. by RIV:

  • DRP *RRI-OPS (2)

R. D. Martin, RA *RPSB-DRSS

  • Section Chief (DRP/0) *RIV File
  • HIS System *RSTS Operator

Lisa Shea, RH/ALF *D. Hunnicutt

R. Bachmann, OGC *R. Hall

  • G. Dick, NRR Project Manager G. Sanborn
  • DRS
  • RRI-CONST

& & c/4o f / (2)fd d

  • w/766

,

s

$

!

1