ML20155E267
| ML20155E267 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/06/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20155E271 | List: |
| References | |
| NUDOCS 8810120210 | |
| Download: ML20155E267 (3) | |
See also: IR 05000498/1988055
Text
s
,
t-
(3
,
OLT
6 1988
In Reply Refer To:
Dockets:
50-498/88-55
50-499/88-55
Houston Lighting & Power Company
ATTNr
J. H. Goldberg, Groap Vice
Pres (dent, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. J. E. Bess, D. L. Garrisen,
J. I. Tapia, and D. M. Hunnicutt of this office during the period August 1-31,
1988, of activities authorized by NRC Operating License NPF-76 and Construction
Permit CPPR-129, for the South Texas Project, Units 1 and 2, and to the
discussion of our findings with Mr. J. T. Westertreter and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included plant status, licensee actions on
previous inspection findings, review of licensee action on reported
events (LERs), operational safety verificatior , ESF system walkdown,
maintenance observations, surveillance observations, loose part monitoring
system test - Unit 2. remote reactor shutdown test - Unit 2, control rod system
test - Unit 2, fuel handling building inspection - Unit 2, QA program (test and
experiments) review - Unit 2, design changes and modification - Unit 2,
preoperational test witnessing - Unit 2, and allegation follow-up - Unit 2.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspectors. The inspection findings are documented in
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
0:tiv i W d S):-
A.B. BEACH
L. J. Callan, Director
Reactor Projects
Enclosu re,
(see next page)
p
- RPB/D
- RPB/D
- RPB/D
- RPB/D
- AC
4:RPB/D
0,:hBAM
JEBess
DLGarrison
JITapia
DMHunnicutt
RIreland EHoller
LKallan
/ /88
/ /88
/ /88
/ /88
/ /88
/ /88 l0/T /88
- Previously concurred
SS10120210 881006
N
ADOCK O' OOO4%
'
J
O
FDC
'
I
. _ _ _ - _ _ _ _ _ __-
,
,
I
4
.
.
Houston Lighting & Power Company
-2-
Enclosure:
Appendix - NRC Inspection Report
50-498/88-55
50-499/88-55
cc w/ enclosure:
Houston Lighting & Power Company
ATIN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
Vice President
ATTN:
GeraldE.Vaughnlont
Nuclear Operat
P.O. Box 1700
Houston, Texas 77001
Houston Lighting & Power Company
ATTH:
S. L. Rosen, General Manager
Operations Support
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATIN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATIN:
R. W. Chewning, Chairman
Nuclear Safety Review Board
P.O. Box 289
Wadsworth, Texas 77483
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City Public Service Board
ATIN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
,
San Antonio, Texas 78296
9
, _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _
_ _ .
___
_
'
,
,
1.
g
.
Houston Lighting & Power Company
-3-
City of Austin Electric Utility
ATIN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
Licensing Representative
Houston Lighting & Power Compary
Suite 610
Three Metro Center
Bethesda, Maryland 20814
J. R. Newman, Esquire
Newman & Holtzinger, P.C.
1615 1. Street, N.W.
Washington, DC 20036
Texas Radiation Control Program Director
bec to DMB:
IE01
bec to distrib. by RIV:
- DRP
- RRI-OPS (2)
R. D. Martin, RA
- RPSB-DRSS
- Section Chief (DRP/0)
- RIV File
- HIS System
- RSTS Operator
Lisa Shea, RH/ALF
- D. Hunnicutt
R. Bachmann, OGC
- R. Hall
- G. Dick, NRR Project Manager
G. Sanborn
- RRI-CONST (2)fd d
- DRS
& & c/4o f /
- w/766
,
s
$
!
1