L VERMONT YANKEE-NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 88-05 FOR THE MONTH OF MAY, 1988 i
DP 0411 Rev. 2 Page 1 of 1 yb 8806150487 880531 PDR ADOCK 05000271 lli(
R ncn
r OPERATING DATA REPORT D'OCKET NO.__50-271 DATE 880610 COMPLETED BY G.A.
Wallin TELEPHONE (802)257-7711 OPERATING STATUS 1.
Unit Name:
' Vermont Yankee NOTES:
2.
' Reporting Period:
May 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe): 514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe): 535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7)since last report, give reasons:
N/A 9.
Power level to which restricted, if any(Net MWe):
N/A 10.
Reasons for restrictions, if any:
N/A This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 744.00 3647.00 12.
Number Of Hours Reactor was Critical 744.00 3647.00 108492.36 13.
Reactor Reserve Shutdown Hours 0.00 0.00-0.00 14.
Hours Generator On-Line 744.00 3647.00 105916.27 15.
Unit Reserve Shutdown Hours-0.01 0.00 0.00 16.
Gross Thermal Energy Generated (MWH)1177043.00 5746699.50 155487411.00 17.
Gross Electrical Energy Generated 393812.00 1939510.00 51779454.00 18.
Net Electrical Energy Generated (MWH)375776.00 1858138.00 49153225.00 19.
Unit Service Factor 100.00 100.00 76.99 20.
Unit hvailability Factor 100.v0 100.00 76.99 21.
Unit Capacity Factor (Using MDC Net) 100.21 101.09 70.89 22.
Unit Capacity Factor (Using DER Net) 98.26 99.12 69.51 23.
Unit Forced Outage Rate 0.00 0.00 6.11 24.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of Each): N/A l
25.
If shut down at end of report period, estimated date of startup: N/A 26.
Units In Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY l
COMMERCIAL OPERATION l
DP 0411 Rev. 2 Page 1 of 1 RT No. 13.FOl.19F b_
~
AVERAGE. DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 880610 COMPLETED BY G.A.
Wallin TELEPHONE (802)257-7711 MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
447 17.
505
-2.
512 18.
502 3.
515 19.
507 4.
517 20.
505 5.
515 21.
509 6.
514 22.
508 7.
514 23.
505 8.
511 24.
503 9.
506 25.
505 10, 505 26.
490 11.
514 27.
506 12, 513 28.
507 13.
513 29.
503 14.
512 30.
492 15.
510 31.
490 16.
505 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole magawatt.
VYDPF 0411.02 DP 0411 Rev. 2 Page 1 of 1 RT No. 13.FO1.18V
UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO $0-271 REPORT MONTH MAY UNIT MAME vermont Tankee-DATE 880619 COMPLETED BY G.A.
Wallin TELEPHONE (802)257-1711 1
2 Method of License System l Component Cause and Corrective No.
Date Type Duration Reason Shutting Down Event Code l Code' Action to (hours)
Reactor 3
Report 8 4
5 Prevent Recurrence None 1 F: Forced 2 Reason:
3 Method:
4 Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training and License Examination F-Administrative 5 Exhibit I - Same Source VYDPF 0411.03 G-Operational Error (Explain)
DP 0411 Rev. 2 H-(Explain)
Page 1 of 1 RT No. 13.F01.18W e
I
DOCKET NO.~50-271 UNIT Vernont Yankcs DATE 880610 COMPLETED BY G.A.
Wallin TELEPHONE (802)257-7711 REPORT MONTH May
SUMMARY
OF OPERATING EXPERIENCES
. Highlights Vermont Yankee operated at 99.3% of rated thermal power for the month.
Gross electrical generation was 393,812 MWHe or 98.0% design electrical capacity.
Oparating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 77.7%
of rated thermal power.
A return to full power was in progress following a rod pattern exchange.
880516 At 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, began cooling tower operations and went to a hybrid cycle of operation.
Varying modes of cycle operation from this point on will be based upon river temperature considerations.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 DP 0411 Rev. 2 Page 2 of 1 RT No. 13.F01.18X
VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 June 10, 1988 VYV 88-112 U.S.
Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Deaf Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of May, 1988.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.