ML20155D891
| ML20155D891 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/03/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8810120013 | |
| Download: ML20155D891 (2) | |
Text
.
4-OCT 3 1988
~
In Reply Refer To:
Dockets: 50-313 50-368 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations t
P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
SUBJECT:
ACCEPTANCE OF CHANGES TO THE QUALITY ASSURANCE MANUAL OPERATIONS FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 We have reviewed the changes addressed in Revision 10 of the Quality Assurance (QA) program description for Arkansas Nuclear One, Units 1 and 2, submitted by your letter 0CAN098809 dated September 9, 1988. We find that Sections 1.6.1 for Unit 1 and 17.1 for Unit 2 of the Safety Analysis Report (SAR) continue to meet the requirements of 10 CFR 50, Appendix B and therefore, the changes are acceptable.
If there are changes to QA commitments existing in docketed correspondence outside of the SAR QA program description, you are obligated to notify this office.
Mr. Ian Barnes of our staff on (817)g this review should be directed to Any questions you may have concernin 860-8176.
Sincerely.
O '.n'l Signed By 3a u. 3, 4 D J. C h, D M tor Division of Reactor Projects t
cc:
Arkansas Nuclear One ATTN:
J. M. Levine, Director Site Nuclear Operations 4
P.O. Box 608 i
Russellville, Arkansas 72801 Arkansas Radiation Control Program Director
[hPk f
- RIV:RI
- C:MQPS
- D:DRS C
WMcNeill/cjg IBarnes JLMilhoan LJcallan
/ /88
/ /88
/ /88 to /3 /88
- Previously concurred f
l 1 J 00b$$$f@@hc 3
P i
's
\\
Arkansas Power & Light Company bec:
bec to DMB CCEf3) bec distrib. by RIV:
RRI R. D. Martin, RA RPB-DRSS SectionChief(DRP/A)
Lisa Shea, RM/ALF RIV File DRP MIS System RSTS Operator Project Engineer, DRP/A C. Harbuck, NRR Project Manager DRS
- 1. Barnes W. McNeill 6