Text
L 'Alb
-
'APR 141986
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by A. G. Januska of
this office on March 17-21, 1986, of activities at Byron Nuclear Generating
Station, Units 1 and 2, authorized by NRC Operating License No. NPF-37 and
Construction Permit No. CPPR-131 and to the discussion of our findings with
Mr. Querio and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
In addition, our Mobile Laboratory was at the site
during the inspection to perform independent measurements of radioactivity.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
439 060
454
'
041
fpR
De O
fg
. D. Shafer, Chief
.
G
g
Radiological Protection Branch
Enclosure:
Inspection Reports
No. 50-454/86011(DRSS);
No. 50-455/86009(DRSS)
See Attached Distribution
{
RIII ,
I
,
Jan
a/1t
Schumacher
afer
'e
T
- * '
y
SED 6
.
.
.
'
.
,
.
Commonwealth Edison Company
2
APR 141986
. Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing _
V.'I.-Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , 'Esq.
Diane Chavez, DAARE/ SAFE
Steve Lewis, ELD
L. Olshan, NRR LPM
H. S. Taylor, Quality Assurance
-
Division
e
=