Requests Addl Info Re Util 880819 Request to Change Tech Spec Sections 3.0 & 4.0,per Generic Ltr 87-09,including Safety Analysis for Each Change to Provide New Operating Flexibility Due to Proposed Change
ML20155D606
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/06/1988
From: Kintner L
Office of Nuclear Reactor Regulation
To: Cloninger T
SYSTEM ENERGY RESOURCES, INC.
References
GL-87-09, GL-87-9, NUDOCS 8810110317
Download: ML20155D606 (3)


Text

. . - .

October 6, 1988 DISTRIBUTION Docket No. 50-416 Osohet'Mie ACRS (10) llRC P. Anderson P021 Reading File L. Kintner Hr. Ted H. C'oninger S. Varga (14E4) OGC Vice President, Nuclear Engineering G. Lainas E. Jordan (MNBB3302) and Support E. Adensam B. Grimes (9A2)

System Energy Resources, Inc.

P. O. Box 23054 Jackson, Mississippi 39205

Dear lir. Cloninger:

SUCJECT: GRAND GULF NUCLEAR STATION (CCNS), UN!1 1 -

LICENSE AMENDitENT REQUEST DATED AUGUST 19, 1988 By letter dated August 19, 1988 System Energy Resources, Inc. (the licensee) requested changes to the GGNS, Unit 1, Technical Specifications (TS) in response to Generic Letter 87-09 regarding TS Sections 3.0 and 4.0. With regard to TS

Section 3.0.4, the proposed changes would provide new operational flexibility for some TS and would provide requirecients equivalent to present TS for others.

The proposed changes to Surveillance Requirements 4.0.3 would provide additional tine (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) to make surveillance tests in certain cases where the test was not run within the specified time interval rather than require plant shutdown for missed surveillance tests. The proposed change to TS 4.0.4 would clarify the present TS 4.0.4 in light of revisions to TS 4.0.3.

The NRC staff is reviewing your submittal and finds that additional information is needed to complete its review. Proposed TS 3.0.4 and 4.0.3 should be rade the same as those in Enclosure 4 to Generic Letter 87-09. A safety analysis should be provided for each TS change that provides new operating flexibility because of the proposed chance to TS 3.0.4. The safcty analysis should dct.onstrate that each proposs TS change will result in an acceptable level of Safety for the specified operation of the fecility. In addition, for each TS change provide the Lasis for your conclusion that the three standards in i 10 CFR 50.92 are net. A description of adninistrative controls er raintenance, l

! startup operation anc refueling sctivities should be provided to demonstrate that plant startup and refueling activities will usually be conducted yben all

recuired '.quiprtnt is operable. This description of administrative controls ,

should be the level of detail usually provided in the FSAR. Provide also a comitment to include this description of administrative controls in the next l

I update of the UFSAR.

! In order to cceplete our review as scheduled, you are requested to provide the above inforraation by Neverter 9,1980. This request was discussed with Mr Kent fortenberry on October 3,1988. l l

. lO l

1 (0 l i i 0  ;

8810110317 001006 PDR ADOCK 0 % 4d6 P

2 Ted H. Cloninger The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L.96-511.

/s/

Lester L. Kintner, Senior Project Manager Project Directorate !!.1 Division of Reactor Projects I/II cc: See next page i

i t

[

1 i

4 UTC

\lA

LA: M110RPR FM:P 21:DRPR:D:PD21 ORFR :  :

.....:..j?.".'.{...:.//f.......l+L...................................::........................

NAME:PAff.,.s,o :LKintner iw :EAd- sam  :  :  :

p9/3'/88 ...;()............:......................................:...........

i DATE ;$/c5/es j/(j/88 I

OFFICIAL RECORD r.0PY l

l l

l

4

  • Mr. Ted H. Cloninger System Energy Resources, Inc. Grand Gulf Nuclear Station (GGNS) cc:

Robert B. McGehee, Esquire Mr. C. R. Hutchinson g Wise, Carter, Child Steen and Caraway GGNS General Manager P. O. Box 651 System Energy Resources, Inc.

Jackson, Mississippi 39205 Post Office Box 756 Port Gibson, Mississippi 39150 Nicholas S. Reynolds Esquire The Honorable William J. Guste, Jr.

Bishop Liberman, Cook, Purcell Attorney General and Reynolds Department of Justice 1400 L Street, N.W. State of Louisiana Washington, D.C. 20005-3502 Baton Rouge, Louisiana 70804 Mr. Ralph T. Lally Office of the Governor Manager of Quality Assurance State of Mississippi Middle South Utilities System Jackson, Mississippi 39201 Services, Inc.

630 Loyola Avenue, 3rd Floor Attorney General New Orleans, Louisiana 70113 Gartin Building Jackson, Mississippi 39205 Mr. John G. Cesare Director, Nuclear Licensing Mr. Jack McNillan, Director Systen Energy Resources, Inc. Division of Solid Waste ftanagement P. O. Box 23054 flississippi Department of Natural Jackson, Mississippi 39205 Rescurces Post Office Box 10385 Mr. C. B. Hogg, Project fianager Jackson, Mississ1pr.1 39209 Bechtel Power Corporation P. O. Box 2166 Alton B. Cobb,11.0.

Houston, Texas 77252-2166 State Health Officer State Board of Health Mr. Ross C. Butcher P.O. Box 1700 Senior Resident Inspector Jackson, Mississippi 39205 U. S. Nuclear Regulatory Commission Route 2, Eox 399 President Port Gibson, Mississippi 39150 Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Mr. William T. Cottle GGNS Site Director

  • Regional Administrator, Region !!

System Energy Resources, Inc. U. S. Nuclear Regulatory Commission P. O. Box 756 101 Marietta Street Port Gibson, Mississippi 39150 Suite 2900 Atlurita, Georgia 30323

.. _ _ _ _