ML20155D583
| ML20155D583 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 04/09/1986 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20155D587 | List: |
| References | |
| NUDOCS 8604170368 | |
| Download: ML20155D583 (1) | |
Text
y bm&
APR 9 1986 Docket No. 50-373 Comonwealth Edison Company ATTN: Mr..Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
Enclosed for your information and consideration is the final report from Mr. William Gunther of Brookhaven National Laboratory (BNL), a contractor for NRC Region III, Station modiTication program.who recently performed a technical review County Nuclear Although Mr. Gunther concluded that controls.have been established and are being properly implemented, he identified several concerns in Section 2 and amplified on the concerns in Section 5 of the report. In some cases these concerns are similar to those which we identified in the special task force report in September,1985, and in the November 22, 1985, 10 CFR 50.54(f) letter. We request that you respond to the concerns including your assessment of the concerns and your proposed actions to address the concerns.
The NRC will be evaluating the concerns and your corrective action during future inspections.
If you have any questions please call me.
Sincerely, C#
r p gir,;1 sign;d hp E n Grc Charles E. Norelius, Director Division Reactor Projects
Enclosure:
As stated cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing G. J. Diederich, Plant Manager l
DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental y
Control Division r/cN
!!!!/#ks %@t Wemond Elius 4
(,4 g
jje8p w
w 8604170368 860409 i
PDR ADOCK 050003 3 P
P gg
- -