Text
. .-.
.
-
-
-
. .
_-
.
. -
- -
__.
' ' '
'
, , -
.-
JUN - 91988
.
.
-In Reply Refer To:
-
Dockets:' 50-313/88-16.
'
50-368/88-16
<
Arkansas Power & Light Company
ATTN:
Mr.' Gene Campbell
Vice President,' Nuclear
-Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. N. M. Terc of this office during
the period May 9-12, 1988, of activities authorized by NRC Operating-
~ Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the
discussion of our findings with members of your staff after the inspection.
Areas examined during the inspection included review of the operational status
of the emergency preparedness program.
In particular, the NRC inspector
reviewed your revised Emergency Action Levels (EAls), and the training and
proficiency of personnel in using them. Within these areas, the inspection
consisted of selective examination cf pocedures and representativa records,
interviews with personnel, and observations by the NRC inspector.
The
inspection findings are documented in the enclosed inspection report.
~
Our review of the new EAls and their implementation determined that certain
improvements were necessary.
During the exit interview, you committed to do the
following:
Complete all required follow-up training on EAls by June 30, 1988.
By July 1, 1988, revise EPIP 1903.10', Revision 21, "Emergency Action Level
Classification," to include the improvements outlined in Section 3 of the
enclosed inspection report.
Complete all required classroom and practical training of essential
personnel on revised EALs by August 29, 1988.
We also examined your actions regarding a ~previously identified inspection
,
finding, as described in paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction,Act of 1980, PL 96-511.
pf
Q
b
R V:
B
C:NMEP8
C:DRP/A
D:0RP
i c/tw
WLFisher
DDChamberlain
LJCallan
'
b/ /88
(.,/@/88
g/f/88
.f / V88
8806140559 880609
r'
ADOCK 05000313
0
g
qu
o
= '
__
_.
-
c
.
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Otkinal S&ned By:
E J. CALLAN
L,,J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-313/88-16
50-368/88-16
cc w/ enclosure:
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Chief, Technological Hazards Branch
FEMA Region 6
Federal Center
800 North Loop 288
Denton, Texas 76201-3698
Arkansas Radiation Control Program Director
bcc to DMB (IE35)
bcc distrib. by RIV:
- RRI
R. D. Martin, RA
Lisa Shea, RM/ALF
- Section Chief (DRP/A)
- RIV File
- RSTS Operator
- MIS System
- G. Dick, NRR Project Manager
- Project Engineer, DRP/A
NMEPB
- R. E. Hall
H. Scott, Acting E0
D. B. Matthews, NRR
R. L. Bangart
- N. M. Terc
- W. L. Fisher
- w/766
!
i
_
_ _ _
-
.