Forwards Insp Repts 50-313/88-16 & 50-368/88-16 on 880509-12.Certain Improvements Necessary & Licensee Commitments Listed
ML20155D177
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/09/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20155D180 List:
References
NUDOCS 8806140559
Download: ML20155D177 (2)


See also: IR 05000313/1988016

Text

. .-. . - - - . . _- . . - - - __.

' ' '

,,- .- '

JUN - 91988

. . l

-

-In Reply Refer To:

'

Dockets:' 50-313/88-16.

<

50-368/88-16

Arkansas Power & Light Company

ATTN: Mr.' Gene Campbell

Vice President,' Nuclear

-Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. N. M. Terc of this office during

the period May 9-12, 1988, of activities authorized by NRC Operating-

~ Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the

discussion of our findings with members of your staff after the inspection.

Areas examined during the inspection included review of the operational status

of the emergency preparedness program. In particular, the NRC inspector

reviewed your revised Emergency Action Levels (EAls), and the training and

proficiency of personnel in using them. Within these areas, the inspection

consisted of selective examination cf pocedures and representativa records,

interviews with personnel, and observations by the NRC inspector. The

inspection findings are documented in the enclosed inspection report.

~

Our review of the new EAls and their implementation determined that certain

improvements were necessary. During the exit interview, you committed to do the

following:

Complete all required follow-up training on EAls by June 30, 1988.

By July 1, 1988, revise EPIP 1903.10', Revision 21, "Emergency Action Level

Classification," to include the improvements outlined in Section 3 of the

enclosed inspection report.

Complete all required classroom and practical training of essential

personnel on revised EALs by August 29, 1988.

,

We also examined your actions regarding a ~previously identified inspection

finding, as described in paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction,Act of 1980, PL 96-511.

pf Q b

R V: B C:NMEP8 C:DRP/A D:0RP

'

i c/tw WLFisher DDChamberlain LJCallan

b/ /88 (.,/@/88 g/f/88 .f / V88

8806140559 880609

PDR ADOCK 05000313

r'

o = '

g 0

qu

__ _.

- *

c .

.

Arkansas Power & Light Company -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Otkinal S&ned By:

E J. CALLAN

L,,J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-313/88-16

50-368/88-16

cc w/ enclosure:

Arkansas Nuclear One

ATTN: J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Chief, Technological Hazards Branch

FEMA Region 6

Federal Center

800 North Loop 288

Denton, Texas 76201-3698

Arkansas Radiation Control Program Director

bcc to DMB (IE35)

bcc distrib. by RIV:

  • RRI R. D. Martin, RA

Lisa Shea, RM/ALF *Section Chief (DRP/A)

DRP *RIV File

  • RSTS Operator * MIS System
  • G. Dick, NRR Project Manager * Project Engineer, DRP/A

NMEPB DRS

  • R. E. Hall H. Scott, Acting E0

D. B. Matthews, NRR R. L. Bangart

  • N. M. Terc *W. L. Fisher
  • w/766

!

i

_ _ _ _ -

.