Ack Receipt of Util 880516 Supplemental Response to Violations Noted in Insp Rept 50-344/87-34.Util Ack of Validity of Violation 87-34-02 Re Untrained Supervisors Issuing Welding & Cutting Permits Noted
ML20155C889
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/01/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8806140370
Download: ML20155C889 (1)


See also: IR 05000344/1987034

Text

- - _ - - - _ _

_

.

. \\;

.

,

.;

-

I ~ N00

Docket No. 50-344

Portland General Electric Company

Attn:

Mr. David W. Cockfield

. , . .

Vice President, Nuclear

121 S. W. Salmon Street

Portland, Oregon 92704

'

Gentlemen:

'

Thank you for your supplemental letter dated May 16, 1988, informing us of

the steps you have taken to correct the item of noncompliance regarding the

issuance of welding /c'utting permits which we brought to your attention in

Inepection Report No. 50-344/87-34.

During our review of your letter, we note that you acknowledged the validity-

of violation no. 87-34-02 concerning untrained supervisors issuing welding

and cutting permits.

We will examined your corrective actions for the

violation during a subsequent inspection.

Your cooperation with us is appreciated.

Yours truly,

On' 1hol 5/ nto[

D

'

b

Robert J . Pate, Chief

Reactor Safety Branch

cc:

C. A. Olmstead, PGE

L. A. Girard, PGE

W. Dixon, DOE

bec w/ copy of letter dated 5/16/88:

Project Inspector

Resident Inspector

"

'

docket file

G. Cook

-

A. Johnson

'

B. Faulkenberry

J. Martin

'

M. Smith

'

J. Zo111 coffer

I

SRicn;V

REGION V

t

CRamsey/ dot

ards

RJPate

(p i 88

G / \\ /88

$/l/88

I

RE UEST COPY ] REQUEST WY ] REQUESTAPf)]

,

'_/ NO

] YES / /NO ) ] YES // N0/ ]

v

v

t

NDgTO POR ]

YES J/ NO

]

I \\

8806140370 880601

7

..

PDR

ADOCK 05000344

a

Jarfe -

- -

- - - - - - . - - -

. -

- ----- -

-

.

y

.

,

IMP

M

r Cil'!ID

Portland General ElectricConpany

}c, ,,

i t3 20 A lD 10

David W. Cockfield Vice President, Nuclear

..

May 16, 1988

Trojan Nuclear Plant

Docket 50-344

License NpF-1

U.S. Nuclear Regulatory C'ommission

ATTN:

Document Control Desk

Washington DC 20555

Dear Sir:

Supplemental Information Concerning

Notice of Violation Item 87-34-02

This response provides supplemental information concerning Portland

3

-

General Electric's (PCE's) previous response to the subject item, as

,

committed to Mr. Chuck Ramsey of Region V during the NRC Fire

'

-

Protection Inspection exit meeting of April 21, 1988.

First, PCE confirms the validity of our original response to this issue

provided in the Response to a Notice of Violation letter, dated

December 28, 1987. At that time all supervisors issuing welding and

cutting permits were properly trained.

However, as noted by Mr. Ramsey during his April 1988 inspection,

untrained supervisors did issue welding and cutting permits during

April 1988.

The supervisors involved were coni.ract personnel recently

hired to augment the plant staff during the 1988 refueling outage.

Although they all have experience in welding and cutting activities,

they had not been provided plant-specific training in this area.

It

should be noted that all regular POE personnel of the Plant Maintenance

and Modification work groups who issued permits in 1988 were qualified

at the time of the inspection.

The causes of the event are twofold:

(1) Inadequate administrative

controls for ensuring proper qualification and training of applicable

craft personnel and (2) Inadequate procedural controls for issuing

welding and cutting permits.

(.

O

h kP

. m . m .s.. ~ c,e m

.

i

I

'y'

.

'

,;

PortlanciGeneral BectricCsTguiy

I

d

nt Control Dask

4.ay 16, 1988

i

Page 2

Imediate corrective action taken included suspending the practice of

issuing permits on April 21, 1988.

Training was conducted and

documented for the previously untrained personnel. Temporary

administrative controls were established to require shift supervisors

to verify the training qualification of personnel issuing permits prior

to authorizing comencement of work. Subsequently, issuing permits

consueneed .

Long-term corrective action planned to avoid a repeated occurrence is

to proceduralize the practices of providing training and verification

thereof by the shift supervisor. Procedures will be revised by

June 30, 1988.

'

Sincerely

'

?

c:

Mr. John B. Martin

Regional Administrator, Region V

U.S. Nuclear Regulatory Commission

Mr. Bill Dixon

State of Oregon

Department of Energy

Mr. R. C. Barr

NRC Resident Inspector

'

Trojan Nuclear Plant