Text
-.. _ _
(
v DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 6-6-88 COMPLETED BY J. H. Moose TELEPHONE 314/676-8243 l
PART A OPERATIONS SUEARY l
The plant operated at approximately 100% power with the following exceptions:
- 1) On 5/2/88, a reactor trip on 'B' steam generator low-low level occurred as a result of turbine control valves stroking closed due to a faulty signal from the throttle pressure limiter circuitry. Power operations resumed 5/3/88.
j
- 2) On 5/10/88, a turbine runback to 67% power occurred when the 'B' circulating water pump tripped during an undervoltage relay replacement.
- 3) On 5/23/88, a turbine runback to 74% power occurred when the
'C' circulating water pump tripped due to a phase imbalance relay problem.
- 4) on 5/31/88, a turbine runback to 75% power occurred when the
'B' circulating water pump tripped due to a phase imbalance relay problem.
Returns to full power were initiated approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> af ter each of the three runbacks.
i PART B PORV AND SAFETY VALVE SU E RY l
i During the transient on 5/2/88, pressuriter PORY BB-PCV-0455A opened for approximately 4 seconds.
Plant conditions were restored to normal during the subsequent shutdown.
Page 1 of 4 6140319 880531 R
ADOCK osooo4g3 l/
N Part C AVERACE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 6 88 COMPLETED BY J. M. Hoose TELEPHONE 314/676-8243 Hoh~ni May 1988 AVERAGE DAILY P0hTR LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 456 17 1172 2
674 18 1168 3
0 19 1164 4
671 20 1160 1144 21 1159 6
1161 22 1164 7
1160 23 1130 1
1 8
1160 24 1165 9
1167 25 1176 10 1147 26 1172 11 1157 27 1165 12 1156 28 1157 13 1157 29 1155 l'
1156 30 1153 15 1157 31 1119 16 1164 Page 2 of 4
l t.
1 Part D OPERATING DATA REPORT DOCKET NO.
50-4:
UNIT NAME CALLAWAY UNIT 1 DATE 6-6-88 COMPLETED BY J. M. Moose TELEPHONE 314/676 8243 OPERATING STATUS (YTD CLH )
1.
REPORTING PERIOD: MAY 1988 GROSS HOURS IN REPORTING PERIOD:
744 3647 30229.5 2.
CURRENTLY AUIHORIZED POWER LEVEL (MWt):
3565 MAX. DEPEND. CAPACITY (MWe-Net): 1120*
DESIGN ELECTRICAL RATING (HWe-Net):
1171 3.
POWER LEVEL TO kHICH RESTRICTED (IF ANY) (HWe-Net):
4 REASONS FOR RESIRICTION (IF ANY):
THIS Moh"IH YR TO DATE CUMULATIVE 5.
NLHBER OF HOURS REACTOR WAS CRITICAL...............
721.7 3240.3 25218.1 6.
REACTOR RESERVE SHL'TDokH HOURS.....................
0 0
0 7.
HOURS GENERATOR ON LINE............................
715.1 3187.0 24641.5 8.
UNIT RESERVE SHUTDOkH HOURS........................
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MLH)...............
2,444,952 10,744,078 79,015,858
- 10. GROSS ELECTRICAL ENERGY GENERATED (MkH)............
832,776 3,652,219 26,693,939 11.
NET ELECTRICAL ENERCY GENERATED (MWB)..............
793,295 3,469,295 25,278,338
- 12. REACTOR SERVICE FACTOR.............................
97.0 88.9 83.4
- 13. REACTOR AVAIllBILITY FACTOR........................
97.0 88.9 83.4 14 UNIT SERVICE FACTOR................................
96.1 87.4 81.5
- 15. UNIT AVAILABILIIT FACIOR...........................
96.1 87.4 81.5
- 16. UNIT CAPACITY FACTOR (Using MDC)...................
95.2*
B4.9*
74.7*
l
- 17. UNIT CAPACITY FACTOR (Using Desigo MWe)............
91.1 81.2 71.4 18.
UNIT FORCED OUTAGE RATE............................
3.88 7.02 4.47
- 19. SHUTD0kHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20.
IT SHUT D0kW AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
A uprated MDC value will not be determined until late in 1988.
Page 3 of 4
?I e
i Part E UNIT S!JUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNIT NAME CALIAWAY UNIT 1 -
DATE 6-6-88 COMPLETED BY
-J. M. Moose TELEP!IONE 314/676-8234
)
REPORT MONTil: MAY 1988 i
HETilOD OF TYPE SIIUTTING DGW 1
F: FORCED DURATION TIIE REACTOR, OR NA DATE St SCIIEDULED (IlOURS)
REASON REDUCING F'TdER CORRECTIVE ACTIONS /COM1ENTS 9
5/02/88 F
28.9 A
3 Turbine / reactor trip due to a faulty signal from the turbine throttle pressure limiting circuit which caused the control valves to close.
LER 88-007-0.
10 5/10/88 F
0 A
4 Runback to 67% due to
'B' circulating water pump trip during an undervoltage relay replacement.
11 5/23/88 F
0 A
4 Runback to 74% due to
'C' circulating water pump trip.
~
12 5/31/88 F
0 A
4 Runback to 75% due to
'B' circulating water pump trip.
SUN 1ARY:
REASON METl!OD 1
A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: RECULATORY RESTRICTION 4: OIIIER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EXPLAIN)
H: OT11ER (EXPLAIN)
Page 4 of 4
Union Etscrnic as Ca#away Pfant June 6, 1988 Nuclear Regulatory Commission Document Control Desk Washi!tton, DC 20555 ULNRC-1785
Dear Sir:
DOCKET NLHBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MAY 1988 The enclosed Monthly Operating Report for May 1988 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
D. Blosser Manager, Callaway Plant f
(iY Q'$< WQm
' MET /DSH/ TAM /JMM/ crc Enclosure cc: Distribution attached l
l fp Maky Address' P.O. Box 620, Futtm MO 65251
'l s
i cc distribution for ULNRC-1785 with' enclosures Mr. Robert DeFayette Chief Project Section lA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen-Ellyn, IL-60137 Mr. Thomas Alexion (2 copies)
Office of Nuclear Reactor. Regulation U..S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102
1 bec distribution for ULNRC-1785 with enclosures Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Mark Parvin Callaway Project Manager Westinghouse Electric Corp.
P. O. Box 355 Pittsburgh, PA 15230 D. F. Schnell (400)
R. J. Schukai (470)
F. W. Brunson (470)
T. P. Sharkey A. P. Neuhalfen W. R. Campbell A. C. Passwater/D. E. Shafer/D. J. Walker (470)
G. A. Hughes G. J. Czeschin J. R. Peevy W. R. Robinson R. R. Roselius J. R. Polchow M. E. Taylor D. E. Young Z170.04 (QA Record)
S. L. Auston (NSRB) (470)
T. A. Moser J. M. Moose (2)
R. L. Kelly (460)
R. J. Irwin/J. M. Brown (490)
JDB Chrono 3456-0021.6 G56.37 N. Date f
- _ _ _ _ _ _ _ _ _ _