ML20155C711

From kanterella
Jump to navigation Jump to search
Clarifies Status of Project Status Repts (Psrs) Provided to Board for Info.Initially,Both Large & Small Bore Piping & Pipe Support Psrs Provided to All Parties & Board.Per Board Request,Further Distribution of Psrs Not Made to Board
ML20155C711
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/07/1988
From: Wooldridge R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC), WORSHAM, FORSYTHE, SAMPELS & WOOLRIDGE (FORMERLY
To: Bloch P, Jordan W, Mccollom K
Atomic Safety and Licensing Board Panel
References
CON-#288-6505 OL, NUDOCS 8806140301
Download: ML20155C711 (1)


Text

.______-_

66 5 WORSHAM, FORSYTHE, SAMPELs & WOOLDRIDg ts.RTv rwo wuNoRco. OOi eRT AN TowcR UdNRC DAU AS. TEXAS 75201

'88 JUN 10 A10:54 TcLcPHONt (24) 979-3000 M O SAMatLS

  • M STt**EN 90V D SOC A WORSHAM 0FF ct_ w.. : a n t bS.. n.

aC8tRT A WCOLC'Ri DG E MAmnR WASEM PC tmC #EL A

E4 9 rv t R RONALDM MANSON CINDY VACKSON SRVNER 1

OFCOUNSEL J DAN BOMANN AN vCt A CAvis SOS imiON wonSMAM TmAvS E vaNDt#800L ER+C M PCTraSow (Am6 A FC#$YTMC vv04TMA VOMNSCN W ALTER W WMITE R*CM A20 L ADAM S L SCOTT AUSTeN DAvtD C LONERGAN slant L SECnMAw TELECOP.Em (tel aso con wCMN W Mc#EY NOLOS W STEPHEN COCAteMAM TMOMAS F LsLLAmo TRACY CQMSS FLAN 4AN ecstmi n wtSE CAvt07 84tGMAM 8C M F LLMORC OA to M TA LOR June 7,1988 Peter B. Bloch, Esquire Dr. Kenneth A. McCollom Chairman Administrative Judge Atomic Safety and Licensing Board 1107 West Knapp U.S. Nuclear Regulatory Commission Stillwater, Oklahoma 74075 Washington, D.C. 20555 Dr. Walter H. Jordan Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory 831 West Guter Drive P. O. Box X, Building 3500 Oak Ridge, Tennessee 37830 Oak Ridge, Tennessee 37830 Re: Texas Utilities Electric Company, et al (Comanche Peak Steam Electric Station, Units 1 & 2); Docket Nos. 50-445 and 50-446 04

Dear Administrative Judges:

'Ihis is to clarify the status of Project Status Reports (PSRs) provided to the Board for information. Initially, both the Large and Small Bore Piping and Pipe Support PSRs were provided to all parties and the Board. At the November 2-3, 1987 pre-hearing conference, the Board Indicated that it did not wish to receive all PSRs.

Thereaf ter, further distribution of PSRs was not made to the Board.

Subsequently, at the Board's specific request, we provided the Instrumentation and Controls PSR.

By letters dated May 20, 1988 and May 26, 1988, we sent to the Board errata pages for the PSRs on Heating, Ventilation and Air Conditioning (HVAC),

Mechanical, and Civil / Structural, incorrectly stating that you had already received such PSRs. If the Board would like to receive copies of any of the other PSRs, please let me know.

Respe fully submitted,

$bD G

Robert A. Wooldridg RAW /klw cc:

Service List

_ _ _ _ _ _ _