NPDES Monitoring Rept for Aug 1988.All Sampled Water Sources within Permit Limits Except One Settleable Solids Test at Sewage Treatment Plant
ML20155C708
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/29/1988
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810100182
Download: ML20155C708 (2)


Text

. _ -. __ _ _ . . _ _ _ . . . _ _ . - - _ _ . __. _ _ . _ _ _

i S I

l i

1

. _/~[5 i Southern California Edison Counpany j SAN ONQFPE NUCLF AR GENER ATING STATION f P O 804120 A I

d SAN CLEMENTE, CALIFORNIA 92672 H E.MOMGAN j ttLEPMONE ,

.v.,,e~ u. .ot. m .>.......  ;

j .

! September 29, 1988 l

! i i

f i

i U. S. Nuclear Regulatory Coranissior. ,

Doctrnent Control Desk i 1 Washingten, D.C. 20555 .

i

SUBJECT:

Docket No. 50-206 Report of NPDES Permit Violation 3

San Onofre Nuclear Generating Station, Unit 1  !

J  !

i  !

l Pursuant to Section 6.16.2.c of Apperxlix A, Technical Specifications, to 1 Provisional Operating License No. DPR-13 for San Onofre Unit 1, enclosed is ,

a copy of the August, 1988 monthly NPDES report stmnary which includes a lj description of a violation of the San Onofre Unit 1 NPDES permit.

l

~

), If you require any additional information, please so advise. ,

j Sincerely, j Mk ~

I  !

t

)

i Enclosure 1

f 6

cc: F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2, and 3) 1 J. B. Martin (Regional Adninistrator, USNRC Region V) {

i l

l i

! f J l i

i. ,

1 s a i 4  ;

i  !

Southern California Edison Company S A% osof Rt NLCil AR Cisf R AtisC st AtiON P O 80 4 1:3

$ AN CLIMtNil.C Alif oPNI A 926*

September 28, 1988 m

/ p'9 r

'tL -O

)t r Mr. Ladin Delaney, Executive Officer California Regional Water Quality Control Board

.f San Diego Region 9771 Clairemant Mesa Boulevard, Suite B San Diego, California 92124-1331

Dear Mr. Delaney:

Subject:

NPDES Monitoring Report i San Onofre Nuclear Generating Station, Unit 1 The SONGS monitoring report covering the month of August is subitted in accordance with the requiranents of C&Q3 Order 88-001 (NPDES Permit No.

CA0001228). A sumary of the generating unit's status and significant analytical results is provided below.

The unit was restarted on August 5, 1988. All sampled water sources were foun3 to te within permit limits except one settleable solids test at the Unit 1 sewage treatment plant. 'Ihis was high due to a grease plugged sewer line. The lines have been cleaned to prevent recurrence.

Pursucnt to Order No.88-001, Reporting Requirerent 12, the following 3 representative is authorized to sign and certify all reports required by this order: Arthur Kneisel, Environmental Engineer.

I certify under penalty of law that I have personally examined and am i familiar with the information suMitted in the attached doctrnent, and based on try inquiry of those in31viduals imediately responsible for obtaining the infor: ration, I believe the suMitted information is true, accurate, and carplete. I am aware that there are significant penalties for suMitting falsa infor: ration, including the passibility of fine and imprisorment.

Sincerely, D m V

' B. Kat:

Manager, Oparations and Maintenance Support  !

Enclosure ec: Environ:nental Protection Agency, Region IX i