ML20155C444
| ML20155C444 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/29/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20155C449 | List: |
| References | |
| NUDOCS 8810100036 | |
| Download: ML20155C444 (2) | |
See also: IR 05000267/1988018
Text
,
.
-
-
.-
~
-
..
.
. ..
.-
SEP 2 91988
)
In Reply Refer To:
Docket:
50-267/88-18
<
Public Service Company of Colorado
ATTN: Robert 0. Williams, Jr.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
Gentlemen:
This refers to the inspection conducted by Mr. G. A. Pick of this office during
the period August 29 through September 2,1988, of activities authorized by NRC
Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and to
the discussion of our findings with members of your staff at the conclusion of
the inspection.
. Areas examined during the inspection included licensed operator training,
nonlicensed staff training, and review of general employee training. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
NRC inspector.
The inspection findirgs are documented in the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified,
We have also examined actions you have taken with regard to previously
)
identified inspection findings. The status of these items is identified in
-
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
,
Sincerely,
,
i
'
i
L. J. Callan, Director
.
Division of Reactor Projects
Enclosure:
(seenextpage)
<
LJCa%
D:D
- RIV:RI
- C:00P
- D:DRS
,
'
ltan
GPick;ap
JEGagliardo
JLMilhoan
/ /88
/ /88
/ /88
y #M/88
- previously concurred
,
,
t
\\
'
0
!
[
N
8810100036 800929
]
ADOCK 05000267
i
O
PNV
g (
'
.
- - . .
-
-
'l
.
.
'
..
..
i
Public Service Company of Colorado
-2-
j
Enclosure:
Appendix - NRC Inspection Report
50-267/88-18
,
cc w/ enclosure:
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
16805 WCR 191
Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
P. Tomlinson, Manager, Quality
Assurance Division
(sameaddress)
Colorado Radiation Control Program Director
1
Colorado Public Utilities Commission
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- SectionChief(DRP/B)
- Project Engineer, DRP/B
'
i
- RPB-DRSS
Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager
- RIV File
'
- DRS
- DRP
- J. E. Gagliardo
- G. Pick
- w/766
i
f
i
1
!
!
!
!
4
. - - - .
-, , . - , - - - - , _ .