ML20155C444

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-18 on 880829-0902.No Violations or Deviations Noted
ML20155C444
Person / Time
Site: Fort Saint Vrain 
Issue date: 09/29/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20155C449 List:
References
NUDOCS 8810100036
Download: ML20155C444 (2)


See also: IR 05000267/1988018

Text

,

.

-

-

.-

~

-

..

.

. ..

.-

SEP 2 91988

)

In Reply Refer To:

Docket:

50-267/88-18

<

Public Service Company of Colorado

ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear Operations

2420 W. 26th Avenue, Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by Mr. G. A. Pick of this office during

the period August 29 through September 2,1988, of activities authorized by NRC

Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and to

the discussion of our findings with members of your staff at the conclusion of

the inspection.

. Areas examined during the inspection included licensed operator training,

nonlicensed staff training, and review of general employee training. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

NRC inspector.

The inspection findirgs are documented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified,

We have also examined actions you have taken with regard to previously

)

identified inspection findings. The status of these items is identified in

-

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

,

Sincerely,

,

i

'

i

L. J. Callan, Director

.

Division of Reactor Projects

Enclosure:

(seenextpage)

<

LJCa%

D:D

  • RIV:RI
  • C:00P
  • D:DRS

,

'

ltan

GPick;ap

JEGagliardo

JLMilhoan

/ /88

/ /88

/ /88

y #M/88

  • previously concurred

,

,

t

\\

'

0

!

[

N

8810100036 800929

]

PDR

ADOCK 05000267

i

O

PNV

g (

'

.

- - . .

-

-

'l

.

.

'

..

..

i

Public Service Company of Colorado

-2-

j

Enclosure:

Appendix - NRC Inspection Report

50-267/88-18

,

cc w/ enclosure:

Fort St. Vrain Nuclear Station

Manager, Nuclear Production Division

16805 WCR 191

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

P. Tomlinson, Manager, Quality

Assurance Division

(sameaddress)

Colorado Radiation Control Program Director

1

Colorado Public Utilities Commission

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • SectionChief(DRP/B)
  • Project Engineer, DRP/B

'

i

  • RPB-DRSS

Lisa Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • K. Heitner, NRR Project Manager
  • RIV File

'

  • DRS
  • DRP
  • J. E. Gagliardo
  • G. Pick
  • w/766

i

f

i

1

!

!

!

!

4

. - - - .

-, , . - , - - - - , _ .