ML20155C331

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/88-12 on 880808-12.No Violations Noted.Mobile Lab Brought to Site & Used by Inspector to Make Certain Independent Measurements.Complete Data from Measurements to Be Reported in Subsequent Rept
ML20155C331
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/30/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20155C336 List:
References
NUDOCS 8810100005
Download: ML20155C331 (2)


See also: IR 05000271/1988012

Text

'

. .

. %P ? O mg

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager

of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

, Ger.tlemen:

Subject: Inspection No. 50-271/88-12

This refers to the routine safety inspection conducted by Mr. A. Kirkwood

of this office on August 8-12, 1988 at Vermont Yankee Nuclear Power Station,

Vernon, Vermont, of activities authorized by NRC License No. OPR-28 and to the

discussions of our findings held by Mr. Kirkwood with Mr. R. Wanczyk and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

<

records, interviews with personnel, and observations by the inspector.

'

In addition, our Mobile Laboratory ins also brought to your site and used by  !

the inspector to make certain independent measurements. The basic purpose of

these independent measurements is to verify your capability for analyzing

radioactive effluents, and to achieve and maintain comparable methods of  ;

analyses between your facility and the NRC. The complete data from these

,l measurements will be reported in a subsequent Inspection Report,

i

Within the scope of this i.ispection, no violations were observed. '

,

No reply to this letter is required. Your cooperation with us in this matter

'

is appreciated.

Sincerely,

Origin.,) Signed Dy: l

4 y f er J r:s: r.k

Ronald R. Bellamy, Chief l

8810100005 880930 Facilities Radiological Safety

PDR ADOCK 05000271 and Safeguards Branch  ;

0 PNV Olvision of Radiation Safety I

and Safeguards '

\

OFFICIAL RECORD COPY IR VY 88-12 - 0001.0.0 , g

08/24/88 ,,

n7 - QO ,

l

l

. .

.

,

. Vermont Yankee Nuclear Power 2

Corporation

Enclosure:

NRC Region I Inspection Report Number 50-271/88-12

cc w/ encl:

J. Weigand, President and Chief Executive Officer i

J. Pelletier, Plant Manager '

J. OeVincentis, Vice President, Yankee Atomic Electric Company

R. Capstick, Licensing Engineer, Yankee Atomic Electric Company ,

J. Gilroy, Director, Vermont Public Interest Rascarch Group, Inc.  ;

G. Sterzinger, Commissioner, Vermont Departme .t. 'of Public Service

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

Public Document Room (PDR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

Commonwealth of Massachusetts (2)

bcc w/ encl:

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, ORMA (w/o enc 1)  !

0. Haverkamp, Section Chief, DRP

G. Grant, SRI - Vermont Yanker (w/ concurrences)

H. Eichenholz, SRI - Yankee

V. Rooney, PM, NRR

R. Bores, Technical Assistant, DRSS

l

i

l

<

l

RI:DRSS SS SS

Kir d/geb/sij Pa tak Bel any

9h'i/88 9/7 & 88 975c/S8

0FFICIAL RECORD COPY IR VY 88-12 - 0001.1.0 l

08/24/88 l

l

1

__ _