ML20155C074

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-277/87-35 & 50-278/87-35 on 871113-880114.No Violations Noted
ML20155C074
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/02/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20155C077 List:
References
NUDOCS 8806140074
Download: ML20155C074 (2)


See also: IR 05000277/1987035

Text

m

3' . .

-

JUNm21988

.

Docket'Nos.

50-277

50-278

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice-President

Nuclear

2301 Market Street

-Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection Report Nos. 50-277/87-35 and 50-278/87-35

This' letter transmits the results of the special inspection to perform

assessments of the Peach Bottom operating crews as described in a letter from

Mr. William Russell, Regional Administrator to Mr. J. W. Gallagher, Vice -

President Nuclear Operations dated September 21, 1987.

The assessn.ents were

performed between November 13, 1987, and January 14, 1988. The inspection team

'

was lead by Mr. David Lange and Mr. Allen Howe.

The inspection concluded that the operating crews exhibited satisfactory

performance in all areas assessed.

Your attention is directed to Sec' ion 8 of

the enclosed report regarding the individual communications weaknesses

identified. .No reply to this letter is required. Your cooperation with us in

this matter is appreciated.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

!

letter and its enclosure vill be placed in the NRC Public Document Room.

i

We appreciate your cooperation.

Sincerely,

,

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Enclosure:

Inspection Report No. 50-277/88-35 and 50-278/88-35

+

OFFICIAL RECORD COPY

CIR PB 87-35 - 0001.0.0

05/31/88

8806140074 880602

gDR

ADOCK 05000277

nnn

, _ _ - _ - _ _ _ _ _ _ _ _ _ -

.

.

,

Philadelphia Electric Company

-2-

'

cc w/ enc 1:

John S. Kemper, Sr., Senior Vice President-Nuclear

J. W. Gallagher, Vice President, Nuclear Services

E. C. Kistner, Chairman, Nuclear Review Board

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

Bryan W. Gorman,fianagee, External Affairs

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Deris Poulsen, Secretary of Harford County Council

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

comonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

Robert J. Bores, DRSS

PA0

RI:DRS

RI:DRS )

RI:D

@ BPS

How y

Langg.

{ i le

Gadio

5 / 11 / 8 8

5/j2/88

5/12-/88

f/h88

0FFICIAL RECORD COPY

. _ .

..

.-

.-

.