ML20155B932
| ML20155B932 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/28/1988 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Hairston W Georgia Power Co |
| Shared Package | |
| ML20155B936 | List: |
| References | |
| NUDOCS 8810070160 | |
| Download: ML20155B932 (2) | |
See also: IR 05000321/1988027
Text
SAFEGUARDS !NFORMATION
- -
-
.
SEP 2 81988
Docket Nos. 50-321, 50-366
License Nos. OPR-57, NPF-5
%
&
Georgia Power Com3any
ATTN:
Mr. W. G. lairston, III
Senior Vice President -
- ,0
4
Nuclear Operations
7b
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N05. 50-321/88-27 AND 50-366/88-27
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
by D. Thompson on August 22-26, 1988.
The inspection beluded a review of
activities authorized for your Hatch facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure.
Therefore the enclosure
to this letter with the exception of the report cover page, whIch presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerbly,I
b
\\
i
William E. Cline, Chief
Nuclear Materials Safety and
oi
Safeguards Branch
g}
l
.
Division of Radiation Safety
,I
and Safeguards
g
Enclosure:
(Seepfaebe
omemmwanm.e
g*1&x ceogy
IS/'O'INI.m NN
,
,
o e-w
SAFEGUARDS INFORMATION
-
. -
_ _ _ _
-
SAFEGUARDS INFORMATION
.
.-
Georgia Power Company
2
Enclosure:
NRC Inspection Report
(Safeguards Information)
cc w/ enc 1:
R. P. Mcdonald, Executive Vice Presient.
Nuclear Operations
J. T. Beckham, Vice President Plant Hat h
H.C. Nix,GeneralManager,PlantHatch
0. M. Fraser, Site Quality Assurance
Manager
L. T. Gucwa, Manager Licensing
and Engineering, Plant Hatch
S. B. Tipps, Manager of Nuclear
Safety and Compliance
cc w/ Inspection Summary:
State of Georgia
bec w/ enc 1:
NRRIORIS/SB
8. Murray, RIV
bec w/ Inspection Summary:
L. P. Crocker, NRR
M. V. Sinkule
Resident Inspector
DRS, Technical Assistant
Document Control Desk (RIOS IE04), 016
RI!
RII
J
M
DThe
on:er
d
A Msinkule
09/
88
09/2 //88
09/ar/88
,
%Y5E:55?E$
'='a'J,00Lu
,
SAFEGUARDS INFORMATION