ML20155B650

From kanterella
Jump to navigation Jump to search
Concludes That No Environ Assessment or EIS Warranted for GE 880229 Changes to Radiological Contingency Plan
ML20155B650
Person / Time
Site: 07000754
Issue date: 06/06/1988
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20155B637 List:
References
NUDOCS 8806130271
Download: ML20155B650 (1)


Text

-

JUN 0 61983 DOCKET NO.: 70-754 LICENSE NO.: SNM-960 APPLICANT: General Electric Company Vallecitos Nuclear Center Pleasanton, California

SUBJECT:

CATEGORICAL EXCLUSION FOR RADIOLOGICAL CONTINGENCY PLAN REVIEW By letter dated February 29, 1988, General Electric Company submitted changes to their Radiological Contingency Plan (RCP) for the Vallecitos Nuclear Center as required by License Condition 12 of Special Nuclear Material License No.

SNM-960. These changes involve the revision of the site and facility description, and changes in organization and titles.

These changes do not decrease the response effectiveness of the RCP. These changes are administrative and will not endanger the environment or the public health and safety. Accordingly, pursuant to 10 CFR S1.22(c)(11), the staff concludes that neither an Environmental Assessment nor an Environmental Impact Statement is warranted for this action, t

FOR THE U.S. NUCLEAR REGULATORY C0tHISSION ,

M By:

Leland C. Rouse, Chief ,

Fuel Cycle Safety Branch Division of Industrial and Medical Nuclear Safety

/

OFC: IMIF :IMIF :IMSB g  :  :  :  :  :

NAME:UComfort:fb:  : LC "s'e :  :  :  :  :

bATEb5hhhbb b5k h bb h)[ hbb5

'I 6 0FFICIAL RECORD COPY 8806130271 080606 PDR ADOCK 07000754 C PDR