OPERATING DATA REPORT DOCKET NO. 50-364 DATE April 2 1986 COMPLETED BY J.D.uoodard TELEPHONE (?OMR99-5156

^

OPERATING STATUS Notes

1. Unit Neme.- Josenh M. Farley - linit 2 1)* Cumulative data since
2. RePerting Period: March, 1986 7-30-81, date of commercial 265
3. Licemoed Thennel Power (MWt):

Peration.

g6

4. N4*= Rating (Gross MWe):

829

5. Design Electrual Rating (Net MWe):
6. u h t,

' ": Capacity (Gross MWe): 872_2

7. Maxanusa C-;,

' "- Capacity (Net MWe): 829.2

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A N/A

10. Reasons For Restrictions,1f Any:

O This Month Yr..to-Date Cu Inuletive 744 2,160 40,945

11. Houra In Reportog Period
12. Number Of Hours Reactor Was Critical 744.0 2,130.2 40,936.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On.Line 744.0 2,122.5 35,514.9
15. Unit Reserve Shutdown Hours n.n nn n.0
16. Gross Thermal Energy Generated (MWH) 1.945.120 5.498.773 89'.733.323
17. Gross Electrical Energy Generated (MWH) 646.636 1,834.002 29,556,690
18. Net Electrical Energy Generated (MWH) 616,544 1,746,770 28,036,010 100.0 98.3 86.7
19. Unit Service Factor
20. Unit Avadability Factor 100.0 98.3 86.7
21. Unit Capacity Factor (Using MDC Net) 99.9 97.5 84.4
22. Unit Capacity Factor (Using DER Net) 100.0 97.6 82.6
23. Unit Forced Outase Rate nn 1.7 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

Refueling / maintenance outage, 4/4/86 approximately 5 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved 05-06-81 05-08-81 INITIAL CRITICALITY 05-24-81 0 5-D-81 INITIAL ELECTRICITY

'"i~ l U7-3U-0I COMMERCIAL OPERATION g

8604160002 860331 PDR ADOCK 05000364

/

f R

PDR (9/77)

50-364 gg gg, 2

UNIT DATE ' Anril 2-19R6

- 4 J. D.W dard C05tPMTED BY TELEPHONE (205)899-5156 5tCNTil March, 1986 j

DAY AVERACE DAlt.Y PO VER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net)

(5tWe Net) 836 835 g,

g7 2

836 gg 827

~ ^

ir-

._...___..,__.g9_.

g73 g

3 4 ~

835 20 834 836 21 837 3

6 834

, 22 R19 834 23 838 7

835 833

4 g

9 830 25-832 10 826

g 832 gg n?A 27 All 835 705 3

4 12 l3 828

g 832 14 A12 30 832 833 gg 8 34 3g 16 836 (NSTRUCUONS On this 63rmst. list the aversge dsity unit power levet in MWe Net for esch d
y in the reporting snunth. Compute io

, the neare:t whole rne;swatt.

(9f77)

O

O O

O UNITSilu1 DOWNS AND POWER REIM)CTIONS DOCKET NO. 5d-364 UNIT NAME J.M.Farley-Unit ?

DATE An_rf1 2.

1986 REPORT MONTig March COMPLETED BY L D W odard TELEPilONE (205)899-5156 v.

E w

.$ E

}

}sx Ej Lkensec Eg

  • ),

Cause & Cussective No.

Date k

g@

g Event y

Actime tu b

oE g

j ga g Repost #

g Pscvent Recutscace in u 6

THERI-WERE NO UN) T SHUT DOWNS OR SIC NIFICANT POW 1 R R : DUCTIONS DURING THE MONTH OF MARCH.

I 2

3 4

F: Fosted Reason:

Method:

Ealiibit G - lasesuctions S: Sslieduled A-Equipment Failuss(Emplain)

I-Manual for Psepasalitui of Data B4taintenance of Test 2 Manual Sesam.

Ensey Sheets for Licensee C Refuelmg 3 Automatic Scram.

Event Rep.ws (I.ERI File INUREG-D-Regulatawy Resisiccion 4 Oslies (Emplain) 0161)

E-Opesator Tsaining A license Exandnation q

F-Adadaisisative 5

G Opesatiinial Esson (Explain)

Exhibia I Same Sousee 19f77) 11 Othes (E aplain)

r-MaMing Address Atztem:a Power Company

. f t-A 600 North 18th Street Post Office Box 2641 Birmingham. Atabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Building

/\\labamaPOWCf

c. e s 3 -..wr.,

April 10, 1986 Docket No. 50-364 Director, Office of Resource Management

- U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the March 1986 Monthly Operating Report for Joseph M.- Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours ver jy R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) lb ih i

Y-- -

, )

/\\

i

(

l s

l JOSEPH M. FARLEY NUCLEAR PTAVP UNIT 2 NARRATIVE SUl9tARY OF OPERATIC S March 1986

/

s s

h re were no unit shutdowns or significant power reductions during the month of March.

W following major safety-related maintenance was oeriormed in the month of March.

1.

Miscellaneous corrective and preventive maidenance was performed on the diesel generators.

2.

We 2A Containment Spray. Pump Breaker was repaired, i