OPERATING DATA REPORT DOCKET NO. 50-364 DATE April 2 1986 COMPLETED BY J.D.uoodard TELEPHONE (?OMR99-5156
^
OPERATING STATUS Notes
- 1. Unit Neme.- Josenh M. Farley - linit 2 1)* Cumulative data since
- 2. RePerting Period: March, 1986 7-30-81, date of commercial 265
- 3. Licemoed Thennel Power (MWt):
Peration.
g6
- 4. N4*= Rating (Gross MWe):
829
- 5. Design Electrual Rating (Net MWe):
- 6. u h t,
' ": Capacity (Gross MWe): 872_2
- 7. Maxanusa C-;,
' "- Capacity (Net MWe): 829.2
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A N/A
- 10. Reasons For Restrictions,1f Any:
O This Month Yr..to-Date Cu Inuletive 744 2,160 40,945
- 11. Houra In Reportog Period
- 12. Number Of Hours Reactor Was Critical 744.0 2,130.2 40,936.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On.Line 744.0 2,122.5 35,514.9
- 15. Unit Reserve Shutdown Hours n.n nn n.0
- 16. Gross Thermal Energy Generated (MWH) 1.945.120 5.498.773 89'.733.323
- 17. Gross Electrical Energy Generated (MWH) 646.636 1,834.002 29,556,690
- 18. Net Electrical Energy Generated (MWH) 616,544 1,746,770 28,036,010 100.0 98.3 86.7
- 19. Unit Service Factor
- 20. Unit Avadability Factor 100.0 98.3 86.7
- 21. Unit Capacity Factor (Using MDC Net) 99.9 97.5 84.4
- 22. Unit Capacity Factor (Using DER Net) 100.0 97.6 82.6
- 23. Unit Forced Outase Rate nn 1.7 4.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
Refueling / maintenance outage, 4/4/86 approximately 5 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 05-06-81 05-08-81 INITIAL CRITICALITY 05-24-81 0 5-D-81 INITIAL ELECTRICITY
'"i~ l U7-3U-0I COMMERCIAL OPERATION g
8604160002 860331 PDR ADOCK 05000364
/
f R
PDR (9/77)
50-364 gg gg, 2
UNIT DATE ' Anril 2-19R6
- 4 J. D.W dard C05tPMTED BY TELEPHONE (205)899-5156 5tCNTil March, 1986 j
DAY AVERACE DAlt.Y PO VER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net)
(5tWe Net) 836 835 g,
g7 2
836 gg 827
~ ^
ir-
._...___..,__.g9_.
g73 g
3 4 ~
835 20 834 836 21 837 3
6 834
, 22 R19 834 23 838 7
835 833
- 4 g
9 830 25-832 10 826
- g 832 gg n?A 27 All 835 705 3
4 12 l3 828
- g 832 14 A12 30 832 833 gg 8 34 3g 16 836 (NSTRUCUONS On this 63rmst. list the aversge dsity unit power levet in MWe Net for esch d
- y in the reporting snunth. Compute io
, the neare:t whole rne;swatt.
(9f77)
O
O O
O UNITSilu1 DOWNS AND POWER REIM)CTIONS DOCKET NO. 5d-364 UNIT NAME J.M.Farley-Unit ?
DATE An_rf1 2.
1986 REPORT MONTig March COMPLETED BY L D W odard TELEPilONE (205)899-5156 v.
E w
.$ E
}
}sx Ej Lkensec Eg
- ),
Cause & Cussective No.
Date k
g@
g Event y
Actime tu b
oE g
j ga g Repost #
g Pscvent Recutscace in u 6
THERI-WERE NO UN) T SHUT DOWNS OR SIC NIFICANT POW 1 R R : DUCTIONS DURING THE MONTH OF MARCH.
I 2
3 4
F: Fosted Reason:
Method:
Ealiibit G - lasesuctions S: Sslieduled A-Equipment Failuss(Emplain)
I-Manual for Psepasalitui of Data B4taintenance of Test 2 Manual Sesam.
Ensey Sheets for Licensee C Refuelmg 3 Automatic Scram.
Event Rep.ws (I.ERI File INUREG-D-Regulatawy Resisiccion 4 Oslies (Emplain) 0161)
E-Opesator Tsaining A license Exandnation q
F-Adadaisisative 5
G Opesatiinial Esson (Explain)
Exhibia I Same Sousee 19f77) 11 Othes (E aplain)
r-MaMing Address Atztem:a Power Company
. f t-A 600 North 18th Street Post Office Box 2641 Birmingham. Atabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Building
/\\labamaPOWCf
- c. e s 3 -..wr.,
April 10, 1986 Docket No. 50-364 Director, Office of Resource Management
- U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the March 1986 Monthly Operating Report for Joseph M.- Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours ver jy R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) lb ih i
Y-- -
, )
/\\
i
(
l s
l JOSEPH M. FARLEY NUCLEAR PTAVP UNIT 2 NARRATIVE SUl9tARY OF OPERATIC S March 1986
/
s s
h re were no unit shutdowns or significant power reductions during the month of March.
W following major safety-related maintenance was oeriormed in the month of March.
1.
Miscellaneous corrective and preventive maidenance was performed on the diesel generators.
2.
We 2A Containment Spray. Pump Breaker was repaired, i
1 e
m'g
{
O i
I i
l h