ML20155B003

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-483/86-07 on 860219-0312. Enforcement Conference Planned
ML20155B003
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/07/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20155B007 List:
References
NUDOCS 8604100176
Download: ML20155B003 (2)


See also: IR 05000483/1986007

Text

- .

Alilb

.

.

. APR 071986  ;

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlerten:

This refers to the special safety inspection conducted by Mr. Bruce H. Little

of this office on February 19 through March 12, 1986 of activities at Callaway

Plant, Unit 1, authorized by NRC Operating License No. NPF-30 and to the

discussion of our findings with Mr. Gary Randolph and others of your staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

i interviews with personnel. -

During this inspection, certain of your activities appeared to be in violation

of NRC requirements.

We are releasing this report at this time for your information. Following an

Enforcement Conference, you will be notified by separate correspondence of our

decision regarding enforcement action based on the findings of this inspection.

No written response is required until you are notified of the proposed

enforcement action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

$gj {n31_$$M

g I'Y

,

Charles E. Norelius, Director l

Division of Reactor Projects

Enclosure: Inspection Report

No. 50-483/86007(DRP)

See Attached Distribution (M

RIII RIII ./t '

h

Forney/mf

flL)

W@arnick

~

dc g l

l

)

(thL \ l

8604100176 860407

PDR

O ADOCK 05000483

PDR

f

'

w -

7 N e 1

_.

.

.

Union Electric Company 2 (AER 071986

,

i

Distribution

cc w/ enclosure:

S. E. Miltenberger, General Manager,

Nuclear Operations

A. P. Neuhalfen, Manager Quality

Assurance

, DCS/RSB (RIDS)

4

Licensing Fee Management Branch

Resident Inspector, RIII

Technical Support Section, RIII

Region IV

K. Drey

Chris R. Rogers, P. E.

Utility Division, Missouri

Public Service Commission

SNUPPS

f

l

l

1

!

!

4

,_ . _ . _ _ _, _ _ ,