SEP 191993
Docket Nos. 50-259, 50-260, 50-296
License Nos. DPR-33, OPR-52, OPR-68
Mr. S. A. White
i
Senior Vice President, Nuclear Power
.
i
Tennessee Valley Authority
6N 38A Lookout Pl.ce
1101 Market Street
Chattanooga, TN 37402-2801
Dear Mr. White:
7
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-259/88-22, 50-260/88-22, AND
i
50-296/88-22)
'
This refers to the special Nuclear Regulatory Commission (NRC) inspection
conducted by K. Jenison on July 11-15, 1988.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to viclate
NRC requirements.
The identified violation involved inadequate corrective
action. The violation, references to pertinent requirements, and elements to be
included in your response are described in the enclosed Notice of Violation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
l
Title 10, Code of Federal Regulations, a copy of this letter, its enclosures,
l
and your reply will be placed in the NPC Public Cecument Room.
The responses directed by this letter and it.s enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511,
8910060122 G80919
I
ADOCK 05000259
Q
\\
ZE O (
.
,
.
.
.
.
.
"
'
SEP 191988
'
S. A. White
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
omCINAL scato P1
FRANK R. McC0Y
Frank R. McCoy, Assistant Direc'.or
for TVA Inspection Programs
TVA Projects Division
Office of Special Projects
Enclosures:
1.
2.
NRC Inspection Report
c w/encis:
J. A. Kirkebo, Vice President,
Nuclear Engineering
C. Mason, Acting Site Director
'
Browns Ferry Nuclear Plant
R. L. Gridley, Director
Nuclear Safety and Licensing
M. J. May, Site Licensing Manager
J. G. Walker, Plant Manager
TVA Representitive, Rockville Office
General Counsel, TVA
State of Alabama
bec w/encis:
J. G. Partlow, OSP
S. D. Richardson, OSP
S. Black, OSP
B. D. Liaw, OSP
K. P. Barr, OSP/RII
G. E. Gears, OSP
0. Moran, OSP
W. S. Little, OSP/RII
A. H. Johnson, OSP/RII
J. Rutberg, OGC
NRC Resident Inspector
ORS, Technical Assistant
NRC Document Control Desk
OSP/RII
OSP JJ
05,P/RII
,"fg4c
1
%
K entston:e/
WL1
le
'-f$arr
09//6/88
09/0(>'83
09/L /83