Forwards Summary of 860221 Mgt Meeting W/Util in Chattanooga,Tn Re Corrective Actions to Improve Effectiveness of Licensed Operator Training,Per Requalification Training Program Exam Rept 50-259/0L-85-03
ML20155A885
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/02/1986
From: Olshinski J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8604100105
Download: ML20155A885 (9)


Text

m W//nd e

April 2, 1986 jTennessee Valley Authority

/ ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJECT:

MEE(ING

SUMMARY

This refers to the nanagement meeting conducted at the Tennessee Valley Authority's Chattanooga headquarters on February 21, 1986. The meeting was held to discuss the corrective actions planned by TVA to improve the effectivness of licensed operator training at the Browns Ferry Nuclear Plant. The need for this improvement was indicated by the evaluation of the Brown's Ferry Requalification Training Program (Examination Report 50-259/0L-85-03).

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning these matters, we will be pleased to discuss them.

Sincerely, (Original signed by JA01shinski)

John A. Olshinksi Deputy Regional Administrator for TVA

Enclosure:

Meeting Summary w/ encl:

Bibb, Site Director

. Lewis, Plant Manager ud. J. Johnson, Nuclear Training Manager bec w/encls: (See page 2) 41gg $N g9 V

1 I l w s-

w Tennessee Valley Authority 2 April 2, 1986 cc w/ encl:

N. Grace, RII A. Wilson, RII

& S. Cantrell, RII

. R. Denton, NRR

. L.~ Thompson, NRR ud. M. Taylor, IE V8. B. Hayes, 0I vs. Connley, 0IA sk. J. Clark, Licensing

_ f Project Manager, NRR WRC Resident Inspector Document Control Desk State of Alabama

  • SEE PREVIOUS CONCURRENCE
  • RII *RII *RII *RII *RII RII KBrocknen BWilson CJulian DVerrelli SWeise ker

-3/. /86 3/ /86- 3/ /86 3/ /86 3/ /86 3/

. _ ~ -. . ._. ._

. ~

t Tennessee Valley Authority 2 April 2, 1986 bcc w/ encl:

J. A. Olshinski, RII F. Cantrell, RII H. R. Denton, NRR H. L. Thompson, NRR J. M. Taylor, IE B. B. Hayes, OI R. J. Clark, Licensing Project Manager, NRR NRC Resident Inspector Document Control Desk State of Alabama e

I 4

1 (Y- 0  %

s# h RII RII s RII - RII RII fRII RI\

X ckman on CJ an AFG bson errelli kW se RD ker 3/10/86 3/70/86 3/ /86 03/ 86 1 /86 ~ /l/86 3/

1

---4 - - - - y ,, - - , .--,3.-,-~.--r,- -.-e--.-,,.y.._..e. -- .. ,se,, w w y ,

ENCLOSURE MEETING SLM4ARY Licensee: Tennessee Valley Authority Facility: Browns Ferry Nuclear Plant License Nos.: DPR-33, DPR-52 and DPR-68 Docket Nos.: 50-259, 50-260 and 50-296

Subject:

Browns Ferry Requalification Training Program On February 21, 1986, representatives of Tennessee Valley Authority (TVA) met with the NRC at TVA offices in Chattanooga, Tennessee. Mr. R. G. Jones of the Browns Ferry Training Department made a presentation outlining the proposed action plan which TVA has developed to upgrade the knowledge, skills and abilities of its licensed operators. The details of the plan, including tentative schedules for implementation, are attached to this summary.

NRC representatives stated that Browns Ferry licensed operators would be j reexamined by the NRC upon completion of this remedial training program.

j As a minimum, all personnel who failed the NRC-administered Requalification

, Exam, plus a sample of the remedial training program participants would be i examined. TVA was requested to respond to Examination Report 50-259/0L-85-03 and propose dates for reexamination. All licensed personnel would be required to participate in the training; those who had successfully completed an NRC exam within twelve months of completing the remedial program would be subject to exemption from additional NRC evaluation.

Attachments:

A. View Graphs of Presentation B. List of Attendees 4

- -, - ---r- .- - , .v..-. - -, - . ~ , . - - . . - - , - - - . _ , . , . . , .. , - - - - -e ,,w..,--e. - + ..- e,.wr,%wy-se-.y--'

l ATTACHMENT A_

~

RESULTS OF ANALYSIS -

l

i REQUALIFICATION TRAINING TIME TOO SHORT l PRE-TMI TRAINED OPERATORS WERE WEAK IN BASICS RAISE EXPECTATION LEVELS IN THE CLASSROOM ,

AND SIMULATOR  ;

  • IMPROVEMENT IN REACTOR THE0HY, HEAT l

TRANSFER AND FLUID FLOW MATERIAL 1

--,_,,,--.___._..,.,__,_,-..,,,w._7,__,,.,,_, _ , . . _ _ _ _ ,,_. _ , , , , _

~- ~- - -- -

TRAINING ACTION PLAN 5

1986 LICENSED OPERATOR REQUAllFICATION PROGRAIR

PHASE l- 8 WEEKS l

- REACTOR THEORY - 2 WEEKS l

- HEAT TRANSFER AND FLUID FLOW-2 WEEKS

- PLANT SYSTEMS - 4 WEEKS 1

I PHASE ll- 6 WEEKS l

~

- SIMULATOR TRAINING - 3 WEEKS

- E01 TRAINING - 1 WEEK ICLASSR00MI

- ADMINISTRATIVE, REP, WALK-THRUS - 1 WEEK

- REVIEW - 1 WEEK PHASE 11!- 2 WEEKS j - SIMULATOR AND FINAL WRITTEN EXAM - I WEEK

- NRC EXAM - 1 WEEK

. . . . _ _ _ . . . _. - _, _ - ---- -....-_.~ __._ ____ _ _ _ _

TENTATIVE SCHEDULE HOT LICENSE ,

GROUP 1 andAL 2/10/86 6/16/86

~

GROUP 2 REQUAL l .. l 7/7/86 '

11/17/86 GROUF 3 nEQUAL

-l l 12/01/86 4/20/87 l ' '

HOT LICENSE HOT LICENSE I l

3/10/86 12/08/86

SUMMARY

  • PROGRAM BRINGS ALL OPERATORS TO POST-TMI KNOWLEDGE LEVEL
  • ELIMINATES OPERATOR DEFICIENCIES IDENTIFIED IN BOTN THE CLASSROOM AND SIMULATOR

'l CONTINUE AN EXPANDED REQUALIFICATION FOR 1987 AND BEYOND INOMINALLY 8 WEEKS PER YEAR) l l

  • STANDARDIZATION AND UPGRADE OF MATERIAL l USED FOR REACTOR THEORY, HEAT TRANSFER AND l

! FLUID FLOW TRAINING CONTINUE TO IMPROVE THE COMMITMENT AND ,

COOPERATION BETWEEN THE PLANT AND TRAINING

l. -

! l

ATTACHMENT B

.' CPERATORS TRAI5ING

. NRC MEETING FEBRUARY 21, 1986 i ATTENDANCE LIST I NAME ORCANIZATION ,,

G. L. Paulk NRC Senior Inspector F. S. Cant ell RII - Proj. Sect.

Bruce Wilson RII - Section Chief Albert Gibson RII - Director, Reactor Safety Div.

Ken Brockman RII - Licensing Examiner John Munro RII - Licensing Examiner Clyde Shiraki NRC- HQ - Examiner C. C. Mason TVA - Deputy Director, Nuc. Power Bob McKeon TVA - BFN Operations Bob Lewis TVA - BFN Plant Manager Bill Bibb TVA - BFN Site Director R. Joe Johnson TVA - Nele Training Branch R. C. Jones TVA - Nelr Training Branch David Pullen TVA - Site Rep, for TVA Nele Power Michael Hellums TVA - Licensing

.ep.