Forwards Safety Insp Repts 50-277/88-29 & 50-278/88-29 on 880805 & 08-12.No Violations or Deviations Noted
ML20155A686
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/21/1988
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcneil C
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20155A689 List:
References
NUDOCS 8810060042
Download: ML20155A686 (2)


See also: IR 05000277/1988029

Text

_ _ _ _ _ _

, -, .

.

. .

,

SEP 211988

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice President-Nuclear

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Inspection Nos. 50-277/278/88-29

This letter refers to the routine safety inspection conducted by Mr. H. J. Kaplan 4

of this office on August 5, 1988 and August 8-12, 1988 at the Peach Bottom

Power Station, Delta, Pennsylvania. Mr. Kaplan discussed the findings of the

inspection with members of your staff at the conclusion of the inspection.

The inspection focused on replacement of emergency service water system piping,

the erosion-corrosion monitoring program, an indication in the Unit 3 recircula-

tion pump to pipe weld, and inspection of the shroud access cover plate welds

in Units 2 and 3. Areas examined during this inspection are described in the

NRC Region I Inspection Report which is enclosed with this letter. Within the

areas examined, the inspection consisted of selective examinations of proce-

dures and representative records, interviews with personnel and observations by

the inspector. No violations or deviations were identified.

Your cooperation is appreciated.

Sincerely,

CM -! .a ::1 oc4 Ey

Jarno P.Durr

Jacque P. Durr, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report Nos. 50-277/88-29 and 50-278/88-29

0FFICIAL RECORD COPY CIR PB 88-29 - 0001.0.0

09/13/88

esiO0$$$$2eso921g o500o277 \\

PDR PDC g:9l

0

__-

-_

.. .

.:  %

SEP 211939

-

,

. -

.

.

,

Philadelphia Electric Company , 2

4

,

cc w/ encl:

John S. Kemper, Sr., Senior Vice President-Nuclear

J. W. Gallagher, Vice President, Nuclear Services

E. C. Kistner, Chairman, Nuclear Review Board

Olckinson M. Smith, Vice President, Peach Bottom Atomic Power Station

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co. .

"

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire .

. W. H. Hirst, Of rector, Joint Generation Projects Department,

Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant' Siting, Ne-lear Evaluations

'

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

'

Public Document Room (POR)

s Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

-

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

>

Section Chief, DRP

-

PA0 (2) SALP and All Inspection Reports

Robert J. Bores, DRSS

3 R. Martin, NRR

B. Clayton, ED0 ,

C. Y. Cheng, NRR -

,

C. McCracken, NRR

j

,

0

RI:DRS RI:DRS N N6

Kaplan/pmb/rw Strosnider N##

9//j/88 9//4/88 faf$Y '

i 0FFICIAL RECORD COPY CIR PB 88-29 - 0002.0.0

1 09/13/88

,

.