ML20155A583
| ML20155A583 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/27/1988 |
| From: | Hairston W GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 3794N, GL-88-01, GL-88-1, HL-79, NUDOCS 8810060014 | |
| Download: ML20155A583 (2) | |
Text
, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Ge>00 R; wor Company 333 Pedmor! Avenue i
Attama, Georg a 30308 l
=
e feiephor,e 404 $2665115 f
4545 AttaNa. Georg:a 30302 y;Hajrsiga n im m w n<* cue st u n Nxteat Coerator.g HL-79 3794N X7GJ17-H600 September 27, 1988 j
l U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES OPR-57, NPF-5 GEEfLTC LETTER 88-01 Gentlemen:
In Georgia Power Company's (GPC's) letter, 3L-4489, dated June 30, 1988, total relief was requested from a portion of the requirements of Generic Letter 88-01/NUREG-0313 Revision 2.
Specifically, it was requested that reactor water cleanup (RHCU) system piping located downstream of double isolation valves be excluded from the scope of GPC's intergranular stress corrosion cracking (IGSCC) program.
Based on conversations with Mr. L. P.
Crocker of the NRC, it is GPC's understanding that this relief will not likely be granted at this time.
Adequate time does not exist to properly prepare for these inspections for the upcoming Unit 1 outage scheduled to ccarience September 28, 1988.
Accordingly, GPC respectfully requests schedular relief for initial implementation of this portion of Generic letter 88-01 at Plant Hatch until the next scheduled cutage for Plant Hatch Unit 2.
Should you have quitstions related to this matter, please contact Mr. L. T. Gucwa at (404) 526.7015.
Sincerely,
& AL W -
H. G. Hairston, III JOH/mb xt:
(See next page.)
$kODIOcckb!O
'gg
4 f
GeorgiaPower A U.S. Nuclear Regulatory Comission September 27, 1988 l
Page Two l
l i
I c: Georata Poytr_ Company Mr. H. C. Nix, General Manager - Hatch Mr. L. T. Gucwa, Manager Licensing and Engineering - Hatch i
j GO-NORMS i
U.S. Nuclear Reculatory Comission._ Hashinoton. D.C.
I Mr. L. P. Crocker, Licensing Project Manager - Hatch
{
U.S. Nuclear Reaulatory Cominion. Reaton II
~
Dr. J. N. Grace, Regional Administrator i
Mr. J. E. Henning, Senior Resider.k Inspector - Hatch i
i l
I i
i I
i 3794N
- - - - - - - -