ML20155A421
| ML20155A421 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/21/1988 |
| From: | Warnick R NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20155A425 | List: |
| References | |
| NUDOCS 8810050315 | |
| Download: ML20155A421 (4) | |
See also: IR 05000445/1988055
Text
.t
,.
.
,
SEP 2 I Ic08
In Reply Refer To:
Dockets:
50-445/88-55
50-446/88-51
TU Electric
ATTN:
Mr. W.
G. Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. C. Hale and NRC
consultants during the period August 3 through September 8, 1988,
cf activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the
inspectors.
Within the scope of the inspection, no violations or deviations
were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection report will be
placed in the NF? Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
ORIGINAL SIGNED DY n, r, ytp.nmer
R.
F. Warnick, Assistant Director
for Inspection Programs
Comancho Peak Project Division
Office of Special Projects
Enclosure:
Inspection Report 50-445/88-55; 50-446/88-51
cc w/ enclosure:
See next page
o
IP:CPedIpSP
/IP:CPPD:OSP
AD:IP:CPPD:OSP
CHalc #
//f7' HLiveremore
RWarnickgpd
9MLL /88
9/L//88
9/21/88
SIEo,
GS10050315 880921
'i
ADOCK 05000445
Q
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _
- _ _ _ _ .
_
. _ _ _ _ _ _
1
. . .
.
+*
'g
UNITED STATES
[
p,
NUCLEAR REGULATORY COMMISSION
5
!
WASHINGTON, D. C. 20666
%,,,,,J
se o e
In Reply Refer To:
Dockets:
50-445/88-55
50-446/88-51
TU Electric
ATTN:
Mr. W. G. Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Gentlemen:
i
This refers to the inspection conducted by Mr. C. Hale and NRC
consultants during the period August 3 through September 8, 1988,
of activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the
,
inspectors.
Within the scope of the inspection, no violations or deviations
were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
R F105
R. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
office of Special Projects
Enclosure:
Inspection Report 50-445/88-55: 50-446/88-51
cc w/ enclosure:
See next page
v'
%
. _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _
- t
"
TV Elcctric
cc w/ enclosure
Roger D. Walker
Nancy H. Williams
Manager, Nuclear Licensing
CYGNA Energy Services
TU Electric
Suite 390
Skyway Tower
2121 N. California Blvd
400 North Olive Street, L.B. 81
Walnut Creek, CA
94596
Dallas, TX
75201
Robert A. Wooldridge, Esq.
Juanita Ellis
Worsham, Forsythe, Sampels
President - CASE
and Wooldridge
1426 South Polk Street
2001 Bryan Tower
Dallas, TX
75224
Suite 2500
Dallas, TX
75201
Susan M. Theisen
Assistant Attorney General
Mr. Homer C. Schmidt
Environmental Protection Division
Director of Nuclear
P.O. Box 12548, Capitol Station
Services
Austin, TX
78711-1548
TU Electric
Skyway Tower
Jack R. Newman, Esq.
400 N. Olive St.,
L.B. 81
Newman & Holtzinger, P.C.
Dallas, TX
75201
1615 L Street, NW, Suite 1000
Washington, D.C.
20036
Mr. J. L. Vota
Westinghouse Electric
GDS Associates, Inc.
Corporation
1850 Parkway Place, Suite 720
Post Office Box 355
Marietta, GA
30067-8237
Pittsburgh, PA
15230
Mr. R. W. Ackley
Lanny A. Sinkin
Stone & Webster Engineering
Christic Institute
Corporation Project Mgr.
1324 N. Capitol Street
20002
P. O. Box 1002
Glen Rose, Texas
76043
David R. Pigott, Esq.
Orrick, Herrington & Sutcliffe
Anthony Z. Roisman, Esq.
600 Montgomery Street
Suite 600
San Francisco, CA
94111
1401 New York Avenue, NW
20005
Robert Jablon
Bonnie S. Blair
Ms. Billie Pirner Garce, Esq.
Spiegel & McDiarmid
Government Accountability Project
1350 New York Avenue, NW
Midwest Office
We.hington, DC
20005-4798
104 East Wisconsin Avenue
Appleton, WI
54911
TU Electric
c/o Bethesda Licensing
Regional Admitiistrator, Region IV
3 Metro Center, Suite 610
U.S. Nuclear Regulatory Commission
Bethesda, MD
20814
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas
76011
t
a
TU ElCctric
cc W/ enclosures
(continued)
George A. Par).er, Chairman
Public Utility Committee
Senior citizens Alliance of
Tarrant County, Inc.
6048 Wonder Drive
Fort Worth, TX
76133
.
Joseph F. Fulbright
Fulbright & Jaworski
i
1301 McKinney Street
Houston, TX
77010
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert &
Rothwell
suite 700
1025 ' thomas Jef ferson St. , NW
1
20007
.
I
f
I
!
f
)
!