TABLE 4.3-7 ESSENTIAL PARAMETERS MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS I -
MINIMUM CHANNEL CHANNEL (I)
READOUT OPERABLE INSTRUMENT CHECK CALIBRATION LOCATION (S)
CHANNELS 1.
Reactor Building Pressure S
R Control Room 2
2.
Reactor Vessel Water Level S/H(2)
SA Control Room (2) 2(2) 3.
Incore Thermocouples/RCS S
R Control Room or 2(3)
Temperature Detectors Cable Room 4.
Reactor Building Water Level NA SA Control Bldg.
1 Area West S.
Borated Water Storage Tank Level S
R Control Room 1
6.
Steam Generator Level NA NS NS 1/ Generator 7.
Spent Fuel Storage Pool S/H(2)
SA Control Room (2) 2(2)
"A" Water Level or Fuel Handling Bldg 8.
Fuel Transfer Canal S/H(2)
SA Control (2) 2(2)
(deep end) Hater Level or Reactor Bldg (See follcwing page for Notes) 8604080370 86gM320 PDR ADOCK O PDR P
TABLE 4.3-7 (Cont'd)
ESSENTIAL PARAMETERS MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS NOTES:
1.
All channel components located inside containment may be excluded from CHANNEL CALIBRATION.
2.
One channel may consist of a visual indication such as a level stand pipe.
Seven day surveillance applies to indication only. Visual indication readout may be in the Reactor Building, or Fuel Handling Building, or by remote television.
3.
Any combination of incore thermocouples, or RC-TI-106 points 1, 2, or 3 that results in a minimum of two operable temperature detectors,' satisfy this requirement.