SEP 2755
In Reply Refer To:
Docket:
50-285/88-27
,
Omaha Public Power District
J
ATTN:
Mr. Kenneth J. Morris
Division Manager - Nuclear Operations
,
1623 Harney Street
Omaha, Nebraska 68102
1
Gentlemen:
This refers to the inspection conducted by Messrs. P. H. Harrell and T. Reis of
o
this office during the period August 1-31, 1988, of activities authorized by NRC
Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of
our findings with Mr. W. G. Gates and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included followup on previously identified
E
items, licensee event report followup, operational safety verification, plant
tours, safety-related system walkdown, monthly maintenance observations, monthly
surveillance observations, security observations, radiological protection
<
observations, in-office review of periodic and special reports, and review of
i
licensee activities related to the instrument air water intrusion event. Within
these areas, the inspection consisted of selective examination of procedures and
-
representative records, interviews with personnel, and observations by the NRC
,
inspectors.
The inspection findings are documented in the enclosed inspection
report.
,
I
Within the scope of the inspection, no violations or deviations were identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
j
paragraph 3 of the enclosed report.
j
Should you have any questions concerning this inspection, we will be pleased to
{
discuss them with you.
l
Sincerely,
i
Onginal kned Bp
j
L. J. CALLAN
j
L. J. Callan, Director
DivisionofReactorProjects
i
Enclosure:
(see next page)
,
RI
RIV:S
-
C:0RP
D:DRb
'
'
'
)
L Cal)an
\\
I
{Wes
e(c'
4
Hari
JPMu .
i
rman
/ji/88 Mp
/SY88
)
\\
l
/JV88
/td/88
(,
/$\\/88
G91oosoo93 000927
goa
noocxosoog4s
yi g
L
-
- - - -
--
- - - - - - - - - _ - _ - _ _
>
-
.
, .
Omaha Public Power District
-2-
Enclosure:
Appendix - NRC Inspection Report
50-285/88-27
cc w/ enclosure:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & Macr 6e
1333 New Hampshire Avenue, NW
Washington, DC 20036
Nebraska Radiation Control Program Director
'
bec to DMB (IE01)
bec distrib. by RIV:
R. D. Martin, RA
- MIS System
- Section Chief (DRP/B)
- DRP
- RIV File
- Project Engineer (DRP/B)
'
- RSTS Operator
- P. Milano, NRR Project Manager
- Lisa Shea, RM/ALF
- RRI
- DRS
'
- w/766
J
,
t