ML20154S556
| ML20154S556 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 05/31/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20154S560 | List: |
| References | |
| NUDOCS 8806090096 | |
| Download: ML20154S556 (4) | |
See also: IR 05000498/1988029
Text
.
.
_
-
. ..
.
.
-
.
.
,
MAY 31 1988
'
In Reply Refer To:
Dockets:
50-498/88-29
50-499/88-29
Houston Lighting & Power Company
AT?N:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001-
Gentlemen:
This refers to the inspection conducted by Mr. A. Singh of this office during
the period April 25-29, 1988, of activities authorized by NRC Operating
License NPF-76 and Construction Permit CPPR-129, for the South Texas Project,
Units 1 and 2, and to the discussion of our findings with Mr. J. T. Westermeier
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included the reactor coolant pressure
boundary, safety-related systems, and associated mechanical components.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector. The inspection findings are documented in
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
,
,
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By,
A. B. Beacli
kl.J. Callan, Director
~
u
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-498/88-29
50-499/88-29
l
l
- previously concurred
- RIV:RI:PSS
- AC:PSS
- D:DRS
- C:DRP/D
0:
Re
cur
l
ASingh:de
RElreland
JLMilhoan GLConstable
LJCd1 Tan REIreland
/ /88
/ /88
/ /88
/ /88
5 /3l/88
r/3 / /88
l
60
I
8
l
8806090096 880531
!
ADOCK 05000498
(
0
I
-
- . _ _
- . _ _ _ _ _ _ _ _ . _ . . _ _ ,
.
_
_
.
.
.
.
,
.
.
Houston Lighting & Power Company
-2-
Enclosure:
Appendix - NRC Inspection Report
50-498/88-29
50-499/88-29
cc w/ enclosure:
Houston Lighting & Power Company
Iewman & Holtzinger, P.C.
ATTN:
M. A. McBurnett, Manager
f,TTN:
J. R. Newman, Esquire
Operations Support Licensing
615 L Street, N.W.
P.O. Box 289
3shington, D.C.
20036
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 289
Houston, Texas 77001
Houston Lighting & Power Company
ATTN:
S. L. Rosen
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
R. W. Chewning, Chairman
Nuclear Safety Review Board
P.O. Box 289
Wadsworth, Texas 77483
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
i
'
'
-
..
-
,
Houston Lighting & Power-Company
-3-
cc w/ enclosure:
(cont'd)
-
City of Austin Electric. Utility
ATTN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
- Houston Lighting & Power Company
ATTN:
Licensing Representative
Suite 610
Three Metro Center
Bethesda, Maryland 20814
' Texas Radiation Control Program Director
bec to DMB (IE01)
-
bec distrib. by RIV:
- DRP
- RRI-0PS
- DRS
R. D. Martin, RA
- Section Chief (DRP/D)
- RPSB-DRSS
- MIS System
- RIV File
Lisa Shea, RM/ALF
- RSTS Operator
R. Bachmann, 0GC
- D. Hunnicutt
'
- P. Kadambi, NRR Project Manager
G. F. Sanborn, E0
4
- A. Singh
- w/766
.
=
-m
1,.4
,
--r-_--.g+w.--.m--+,,evc--,e-
-y
rw--
--- - - -
y
-e---
--
.e-
4y-,-.
.--
-y,-1
.-m
,,wsc.-
,w-,--y9
- - - - - . - , - - -
y-
wy---
y
.,
. ..
..
.
.
- - _ - _ _ - - - _ -
.
.
'
MAY 31 1988
'
-
-
In Reply Refer To:
Dockets: 50-498/88-29
p}ff
@,
50-499/88-29
e
.J
,
pp
'
Houston Lighting & Power Company
c
..
ATTN:
J. H. Goldberg, Group Vice
J'
President, Nuclear
P.O. Box 1700
'
!
Houston, Texas 77001
Gentlemen:
This refus to the inspection conducted by Mr. A. Singh of this office during
the period Aprii 25-29, 1988, of activities authorized by NRC Operating
License NPF-71 and Construction Fermit CPPR-129, for the South Texas Project,
Units 1 and 2, and to the discussion of our findings with Mr. J. T. Westermeier
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included the reactor coulant pressure
boundary, safety-related systems. and associated mechanical components.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector.
The iripection findir.os are documented in
tne enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
l
Should you have any questions concerning this inspection, we will be pl e sed to
discuss them with you.
Sincerely,
Original Signed By
A. B. Beacli
<
)NL.J. Callan, Director
Division of W u- Frejects
Enclosure:
Appendix - NRC Inspection Report
50-498/88-29
50-499/88-29
RIV:RI P
C:PSS
D:
- 4
C:DRP/
D:D
heconcur
4'ASingh:de
REIreland
JLMi
oan GLConstable
LJCallan RElrelar:d
v
I/25/88
g /26/88
f/Pf/88 .6/S/88
,T/$/83
/
/88
-_
_ _ - _ _
__ -_ - _- - -_____ - __