ML20154S515
| ML20154S515 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/27/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20154S521 | List: |
| References | |
| NUDOCS 8810050088 | |
| Download: ML20154S515 (2) | |
See also: IR 05000285/1988030
Text
_
____
_.
.
.
C
9
SEP 2 7 Igga
In Reply' Refer To:
Doc'ket:
50-285/88-30
Omaha Public Power District
ATTH:
Kenneth J. Morris, Division Manager
Nuclear Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. H. D. Chaney of this office
during the period August 29 through September 2,1988, of activities authorized
by NRC Operating License DPR-40 for the Fort Calhoun Station, and to the
discussion of our findings with Mr. W. G. Gates and other members of your staf f
at the conclusion of the inspection.
.
Areas examined during the inspection included the radiation protection program
and the preparation for the forthcoming reactor refueling outage.
Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspector.
The inspection findings are documented in the enclosed inspection
report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
,
original Sign"I !! .
Y
1.1. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix
NRC Inspection Report
1
50-285/88-30
cc w/ enclosure (see attached):.
,
,
0:0kw$
RIV: RPSB
C:RPSB
C:RPB
C:RPB/O
t
LJCallan
HDChaney/tw
REBaer
BMurrayFWe s t e r...an [ g4 /88 , ({ /p88 g{ /88 / /88 /88 se100gggy Q$oh[o3 ' goa enu gc3 - - - - - - - - - - - - - - - - --
_ _ _ _ _ - _ a . 'O 0 Oma,ha Public Power District 2 l i Fort Calhoun Station ATTN: W. G. Gates, Manager ! P.O. Box 399 i Fort Calhoun, Nebraska 68023 ! Harry H. Voigt, Esq. LeBocuf, Lamb Leiby & M vPen
1333 New Hampshire Avenue, NW ! Washington, D. C. 20036 l , Nebraska Radiation Control Program Director bec to DMB (IE06) t I bec distrib by RIV:
- R.D. Martin, RA
- RP8 DRSS
- Section Chief (DRP/B)
- MIS System
l
- RIV File
- DRP
-
- RSTS Operator
- Project Engineer, DRP/B
Lisa Shea, RM/ALF
- P. Milano, NRR Project Manager
[
- DRS
- RRI
H. D. Chaney
i
- w/766
l I i
i i l l l i ' l l l L i I l < l > 1 i ' }}