ML20154S145
| ML20154S145 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/27/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20154S148 | List: |
| References | |
| NUDOCS 8810040454 | |
| Download: ML20154S145 (2) | |
See also: IR 05000313/1988026
Text
,
_ - _ - _ - -
- - - - - - - - - - -
,
6
SEP 2 71988
In Reply Refer To:
Dockets:
50-313/88-26
50-368/88-26
Arkansas Power & Light Company
ATTN: Mr. 3ene Campbell
Victs President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. L. E. Ellershaw,
L. D. Gilbert, and R. G. Taylor of this office during the period August 15
through September 2,1988, of activities authorized by NRC Operating Licenses
DPR-51 and NPF-6 for Arkansas Nuclear One, and to discussion of our findings
with Mr. J. M. Levine and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included the control of design changes
and modifications; design changes and modifications - reactor coolant pump
pressure sensing line failure; inservice inspection activities for Unit 1;
selection of welding and nondestructive examination processes in design change
activities; and an annual review of the quality assurance program including
audits, control of procurement, and receipt, storage, and handling of
components and materials.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspectors.
The inspection findings are documented in
i
the enclosed inspection report.
'
l
l
During this inspection, it was found that certain of your activities were in
I
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
'
of the NRC's "Rules of Practice " Fart 2. Title 10. Code of Federal Regulations.
6
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980 PL 96-511.
RIV:Rl*
R1*
RI*
C:MQPS*
0:DRS*
0:0
LEE 11ershaw
LOGilbert RGTaylor IBarnes
JLMilhosn LJCaflan
/ /88
/ /88
/ /88
/ /88
/ /88 9/N/88
hof
astoo4o434 noO m
ADOCK 0b000313
o
i>Nu
'
t
f
.
. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
__ _
.
.
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
I
Sincerely,
'
s
t ,, in
t'.. !It')/ h L. J. Callan. Director Division of Reactor Projects Enclosures: 1. Appendix A - Notice of Violation 2. Appendix B - NRC Inspection Report 50-313/88-26 50-368/88-26 cc w/ enclosures: Arkansas Nuclear One ATTN: J. H. Levine, Director Site Nuclear Operations P.O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director ! bec to DMB (IE01) bec distrib. by RIV:
- RRI
- R.
D. Partin, RA
- RPB-0RSS
- Section Chief (ORP/A)
. Lisa Shea, RM/ALF
- RIV File
(
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
-
- C, Harbuck NRR Profect Manager *0RS
- L. Ellershaw
- L. D. Gilbert
- R. Taylor
- !.
Barnes
- w/766
l l l
1 ! ' I t ! . t i . - . - . - - _ _ - - _ - _ - _ - - _ _ . - _. - _ _ _ . _ _ _ _ _ . -. --.-_ }}