ML20154R992
| ML20154R992 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/23/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20154R998 | List: |
| References | |
| NUDOCS 8810040415 | |
| Download: ML20154R992 (2) | |
See also: IR 05000285/1988028
Text
._ _
_____
__ _- -_ _ ____ ___________
e
t
,
o
,
.
In Reply Refer To:
Docket:
50-285/88-28
Omaha Public Power District
ATTN: Kenneth J. Morris, Division Manager
Nuclear Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
ThisreferstotheinspectionconductedbyMessrs.M.E.MurphyIod
R. P. Mullikin, and C. E. Johnson of this office during the per
August 22-26, 1988, of activities authorized by NRC Operating License DPR 40
for the Fort Calhoun Station, and to the discussion of our findings with
Mr. W. G. Gates and other members of your staff at the conclusior, of the
inspection.
Areas examined during the inspection included the fire protection / prevention
program, the triennial postfire safe shutdown capability reverification, and
followup on previously ideqtified items. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors.
The
inspection findings are documented in the enclosed inspection report.
l
During this inspection, it was found that certain of your activities were in
!
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
l
Section 2.201 of the NRC's "Rules of Practice," Part 2. Title 10. Code of
I
Federal Regulations. Your response should be based on the specifics contained
I
in the Notice of Violation enclosed with this letter.
Two unresolved items are identified in paragraohs 4 and 5 of the enclosed
inspection report.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status af these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accorpanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Papemork Reduction Act of 1980, PL 96-511.
- RIV:RI
- C:TPS
- RI
- C:RPSB
- RI
- C:PS$
- D:0RS
MEMurphy WCSeidle RPMullikin
TFWesteman
CEJohnson TF$tetka JtMilhoan
/ /88
/ /88
/ /88
/ /88
/ /88
/ /88
/ /88
DhPdV
LJCallan
i/O/68
.O\\
- previously concurred
6
h$kOTb b
\\
5
Q
F
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _
.
.
.
,
3
Omaha Public Power District
2
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Urighml Sign .1 ily
A. D. llach
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-285/88-28
cc w/ enclosures:
Fort Calhoun Station
ATTN:
W. G. Gatr.s. Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt Esq.
LeBoeuf. Lamb. Leiby & MacRae
1333 New Hampshire Avenue, hv
Washington, D. C.
20036
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- R.D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/B)
- MIS System
- RIV File
- 0RP
'RSTS Operator
- Project Engineer, DRP/8
Lisa Shea, RM/ALF
- P. Milano NRR Project Manager
- DRS
- RRI
- M. Morphy
- R. Mullikin
- C, Johnson
- W. C. Seidle
- T. F. Stetka
- w/766
l